YONGQI, ZHANG Mr.
CURRICULUM VITAE
NATIONALITY China
LOCATION X i’an, China
PHONE 188********
EMAIL 1141893365@https://www.doczj.com/doc/c817473001.html,
BIRTH DATE 1983.11.2
EDUCATION
2004-2008 Xi’an technology University
Majored in mechanical design
QUALIFICATION
TRAINING
?2009 Intertek Moody
Welding inspection training, Casing& tubing inspection training
SUMMARY Over 4 years experience in quality inspection in flange, valve, mechanical, metal,
steel structure and pipe fabrication
Extensive industry knowledge of welding and inspection
In depth knowledge of material of local and international codes
LANGUAGES English (oral, writing and reading), Chinese
PROFESSIONAL AFFILIATIONS
Inspection Engineer experienced in inspection of flange, pipe, valve, machinery,
steel structure, steel plate, etc.
EXPERIENCES
2009-recent Intertek Moody China
QA/QC Engineer
?Major work involves seamless pipes, valve, casing tube. Engineering equipment
?Pre-production meeting
?Production schedule and inspection & test plan review
?Technical specifications and drawings review
?Material verification
?In process inspection and expediting
?Testing witness
?Final inspection
Projects involved:
Job involves material verification,mechanical property test, chemical analysis test, hydrostatic test, dimension inspection, visual inspection and paining and stuff.
2013.01-2013.02 ASME B16.5 Lapped Face Forged Flange
Flange Inspection at Dingxiang Huangxing Machinery Fabrication Co.,
Ltd
Review drawing, Material chemical analysis, Heat treatment, Mechanical
properties &Chemical analysis, UT test, Visual and dimensional
inspection, Marking, Coating.
2012.10-2013.12 Casing SMLS
Technical Data: 13-3/8" Grade N80-Q BTC / 13-3/8" Grade K55 BTC /
Standard API 5CT at Hengyang Valin Steel Tube
Performed vendor shop inspection in fabrication of equipment, inspection
works contains: Reviewing PO, ITP, material certificate, calibration
certificates, mill test certificate and packing list. Monitored billets
inspection, hot rolling, EMI, heat treatment. Witnessed UT, MT,
dimension check, hydrostatic test, thread measuring, coupling making &
testing, marking, packing, loading and delivering. Push the mill produce
schedule. Reviewed chemical & mechanical test report & relative
documents.
2012.06-2012.08 CASING & TUBING
Seamless Steel Pipe Inspection for KOC at sub vendor of Hengyang
Valin Steel Tube
Performed vendor shop inspection in the fabrication of equipment,
working scope contains: reviewing PO, material certificate, calibration
certificates, mill test certificate and packing list, witness NDT(RT, MT,
EMI), dimension check, hydrostatic test, threading inspection, marking,
packing, loading and delivering of pipes.
2012.04-2012.05 Ductile Iron Fitting
Ductile Iron Fitting inspection for Karara Mining Ltd. At Xinxing Ductile
Iron Pipes Co.,Ltd
Ductile Iron Fittings DN500 Tee, bend / Standard: ASTM A312, ASTM
A530
Minute of pre-production meeting. Witness type test, mould appearance
& dimension, casting, chemical analysis & mechanical, microstructure
test, dimension & vision inspection, application of zinc material, pressure
test, application of cement mortar lining, bitumen coating, drying, non-
toxicity test, accessories assembly, packing, marking & review MDR.
2012.01-2012.03 ANSI B16.5 Carbon Steel Screwed Flange
Flange Inspection at Wenzhou Footo Pipe Fitting Manufacturing Co., ltd.
Review drawing, Material chemical analysis, Heat treatment, Mechanical
properties &Chemical analysis, UT test, Visual and dimensional
inspection, Marking, Coating. Final inspection
2011.09-2011.12 26000 Litres SS TANK inspection at Jiangsu Tank Container Co., LTD Review material certificate, raw materials sampling witness, review
welding process and assess records, audit welder and non-destructive
testing personnel qualification, supervision and inspection of the welding
process, witness ultrasonic, dye inspection and workshop inspection,
audit film, visual and the dimensional check of components, anti-
corrosion and paint inspection, the quality release of the final parts
2011.08 STAINLESS STEEL PIPES
Perform final inspection of stainless Steel Pipes for MMA Plant (A/G) at
Changshu Walsin Specialty Steel Co,. Ltd
Performed vendor shop inspection in the fabrication of equipment,
working scope contains: Pre-inspection meeting, witness cold rolling,
drawing, annealing, straightening, pickling, tensile test, chemical test,
intergranular corrosion test, witness NDT, hydrostatic test, dimension
check, visual inspection and coating.
2011.06-2011.07 HEAT SHRINK
Technical Data: HEAT SHRINK, 450MM LG F/4” Pipe at Sichuan Xipu
Corporation Limited
Inspection of heat shrink, patch tape, patch glue, heater and other parts
for heat shrink. According to the code of DIN 30672 & Nace RP0303.
Verified the mechanical properties and chemical component test, tensile
strength, elongation to break, dielectric breakdown, volume resistivity,
heat aging, brittleness temperature, ring & ball softening point, brittle
temperature, peel strength, impact resistance. Checked products marking,
packing, dimensions, visual inspection & quantity.
2011.03-2011.05 LINE PIPE
Line pipe supervise for Canadian Petroleum Limited in Sichuan.
pre-inspection meeting, monitoring of pipe forming, monitoring heat
treatment, mechanical properties and chemical analysis, straightening,
hydrostatic, NDT, drift test, review MTC, visual, dimensional inspection,
check protection, packing & preservation.
2010.11-2011.02 Casing SMLS
Technical Data: 9-5/8” Grade P110 LTC Special Drift/ Standard API 5CT
at Pangang Group Chengdu Iron & Steel
Performed vendor shop inspection in fabrication of equipment, inspection
works contains: Reviewing PO, ITP, material certificate, calibration
certificates, mill test certificate and packing list. Monitored billets
inspection, hot rolling, EMI, heat treatment. Witnessed UT, MT,
dimension check, hydrostatic test, thread measuring, coupling making &
testing, marking, packing, loading and delivering. Push the mill produce
schedule. Reviewed chemical & mechanical test report & relative
documents.
2010.06-2010.09 CONCENTRACTING TANK
Concentrating tank surveillance at Taizhou Kerte equipment Co.,Ltd.
Performed inspection as per ASME code. Documentation check, verified
of material, drawing, welding, fit-up, finished product inspection, painting.
2010.02-2010.05 GAS ENGINE
Machining, Fit-up & Running test
Plant quality assurance for drill well & pumping projects. Projects
included: Gas engine, oil generator.
2009.12-2010.01 AIR COOLER
GKL air cooler inspection in Wuxi Bodking Engineering Equipments
Factory.
Performed material verification, cutting, welding, pipes fit-up, fastener fit-
up, seal test finished product inspection, painting inspect.
2009.09-2009.11 DUST COLLECTER
Dust collector and Lime Silo inspection & expediting for Lynas Rare Earth
Project on behalf of UGL at Wuxi Hongyun Environ Protection Equipment
Co. Ltd
Review Mill’s certificate, Raw material certificate and welder’s certificate,
Check Fabrication tolerances and assembly, Check Surface Treatment &
Welding (WPS-PQR's-WQT), Review MDR documentation for
completeness and Compliance, Check product dimensions as drawing
2009.07-2009.08 Carbon Steel EN1092 Forged Plate Flange
Flange Inspection at Dalian Wells Metal Products Co.,ltd.
Review drawing, Material chemical analysis, Heat treatment, Mechanical
properties & Chemical analysis, UT test, Visual and dimensional
inspection, Marking, Coating. Final inspection.
2009.06 Casting Valve
Casting valve inspection and expediting for Tecnimont at Neway, Suzhou.
Visual Quality Check (Nameplate/ marking/ tagging/ Protection/ Packing/
Painting), Dimension Check comparing with drawings, Review Material &
Test Certificate (Review Liquid Penetrant Test Report as per ASME
B16.34; Review Radiographic Test Report as per ASME B16.34; Review
PMI Report; etc.), Witness Pressure Test as per API598 & ASME B16.34,
Witness Operation Test, Production Process Control, Review Equipment
Calibration Certificate
2008.07–2009.05 Jiangsu Hongbao Group Co., Ltd.
Quality Control
Job involved SMLS, Ti alloy production inspection and etc.