当前位置:文档之家› 水立方英文

水立方英文

水立方英文
水立方英文

Beijing National Aquatics Center

National Swimming Center--Exquisite and Exciting "Water Cube" its surface, is a shape very similar to the structure of "H2O", the outlook for the National Swimming Center at the 2008 Olympic Games. After the games, it will become a recreational water park open to the public. In Chinese culture, water is an important natural element. It creates a calming atmosphere and inspires happiness. Taking full consideration of the functions of water in recreation and bodybuilding, designers have explored many ways for people of different age groups to appreciate its function. The design is called "Water Cube". Many creative designs have been employed in the creation of the swimming pools at the swimming center. Other high-tech facilities including optical devices used to define positions of athletes, and multiple-angle, three-dimensional screening systems are provided to help spectators enjoy competitions.

The National Swimming Center, one of the three landmark buildings for the 2008 Beijing Olympic Games, is located inside the Beijing Olympic Park. Covering a total floor space of 50,000 square meters, it has 17,000 seats. The project costs about US$100 million. The center will be a venue for swimming, diving, synchronized swimming and water-polo games during the period of the Olympic Games. After the games, the center will become a large water recreational center open to the public.

In January 2003, Beijing started to solicit design schemes for the National Swimming Center. The international competition settled on "Water Cube" as the winning scheme. It is designed by the design consortium consisting of the China State Construction Engineering Corporation, China State Construction International (Shenzhen) Design Co Ltd, PTW Architects (Australia) and Ove Arup (Australia).

The National Swimming Center will be the only landmark Olympic venue that is constructed by donations from compatriots from Overseas.

simplified Chinese: 北京国家游泳中心; traditional Chinese: 北京國家游泳中心The Beijing National Aquatics Center, also known as the National Aquatics Center, and nicknamed the Water Cube, is an aquatics center that was built alongside Beijing National Stadium in the Olympic Green for the swimming competitions of the 2008 Summer Olympics. Despite its nickname, the building is not an actual cube, but a cuboid (a rectangular box). Ground was broken on December 24, 2003, and the Center was completed and handed over for use on January 28, 2008. Swimmers at the Water Cube broke 25 world records during the 2008 Olympics.

After the Olympics, the building is now undergoing a 200 million Yuan revamp to turn the inside into a water park.

Architecture

In July 2003, the Water Cube design was chosen from 10 proposals in an international architectural competition for the aquatic center project. The Water Cube was specially designed and built by a consortium made up of PTW Architects (an Australian architecture firm), Arup international engineering group, CSCEC (China State Construction Engineering Corporation), and CCDI (China Construction Design International) of Shanghai. The Water Cube's design was

initiated by a team effort: the Chinese partners felt a square was more symbolic to Chinese culture and its relationship to the Bird's Nest stadium, while the Sydney based partners came up with the idea of covering the 'cube' with bubbles, symbolising water. It should be noted that contextually the cube symbolises earth whilst the circle (represented by the stadium) represents heaven. Hence symbolically the water cube references Chinese symbolic architecture.

Comprising a steel space frame, it is the largest ETFE clad structure in the world with over 100,000 m2 of ETFE pillows that are only 0.2 mm (1/125 of an inch) in total thickness[8]. The ETFE cladding allows more light and heat penetration than traditional glass, resulting in a 30% decrease in energy costs.

The outer wall is based on the Weaire–Phelan structure, a structure devised from the natural formation of bubbles in soap lather.[9] The complex Weaire–Phelan pattern was developed by slicing through bubbles in soap foam, resulting in more irregular, organic patterns than foam bubble structures proposed earlier by the scientist Kelvin. Using the Weaire–Phelan geometry, the Water Cube's exterior cladding is made of 4,000 ETFE bubbles, some as large as 9.14 metres (30.0 ft) across, with seven different sizes for the roof and 15 for the walls.

The structure had a capacity of 17,000[8] during the games that is being reduced to 6,000. It also has a total land surface of 65,000 square meters and will cover a total of 32,000 square metres (7.9 acres)[8]. Although called the Water Cube, the aquatic center is really a rectangular box (cuboid)- 178 metres (584 ft) square and 31 metres (102 ft) high.

Olympics

The Aquatics Center hosted the swimming, diving and Synchronized Swimming events during the Olympics. Water polo was originally planned to be hosted in the venue but was moved to the Ying Tung Natatorium.

Many people believe the Water Cube to be the fastest Olympic pool in the world. It is 1 meter deeper than most Olympic pools. Up to a certain limit, beyond which swimmers will lose their sense of vision, deeper pools allow the waves to dissipate down to the bottom, leading to less water disturbance to the swimmers. The pool also has perforated gutters on both sides to absorb the waves.

With the popularity of the newly introduced faster Speedo LZR Racer swim suit, the Aquatics Center saw 25 world records broken in the Beijing Olympics.

Since June 20, 2009 the Watercube has been open to the public on certain days of the week. It is also used for sound and light shows and during the summer of 2009 was turned into a ballet theater for a production of Swan Lake. The building's popularity has spawned many copycat structures throughout China.

The Watercube closed to the public to undergo renovations on October 15, 2009.

Awards

The special award for the most accomplished work in the section Atmosphere is

awarded to the Australian architecture firm PTW Architects, CSCEC + Design

and Arup for the project National Swimming Centre, Beijing Olympic Green,

China. The project demonstrates in a stunning way, how the deliberate morphing

of molecular science, architecture and phenomenology can create an airy and

misty atmosphere for a personal experience of water leisure

— Quote from the Jury report of the Official Awards 9th International Architecture Exhibition –METAMORPH, Venice Biennale

?2004 – Venice Biennale – Award for most accomplished work Atmosphere section[14] ?2006 – Popular Science Best of what's new 2006 in engineering[8]

?2008 –NSW 'Project of the Year' award from the Australian Institute of Project Management[15]

?2009 – 40th annual MacRobert Award, the UK's biggest prize for engineering innovation

鸟巢 水立方建筑赏析

鸟巢水立方建筑赏析 钢结构建筑欣赏-鸟巢 场馆名称:国家体育场(鸟巢) 地理位置:奥林匹克公园 建筑面积: 25.8万㎡ 赛时功能:开闭幕式、田径、男子足球 座位数: 91000个 国家体育场(“鸟巢”)是2008年北京奥运会主体育场。由2001年普利茨克 奖获得者赫尔佐格、德梅隆与中国建筑师李兴刚等合作完成的巨型体育场设计,形态如同孕育生命的“巢”,它更像一个摇篮,寄托着人类对未来的希望。设计 者们对这个国家体育场没有做任何多余的处理,只是坦率地把结构暴露在外,因而自然形成了建筑的外观。 国家体育场于2003年12月24日开工建设,2004年7月30日因设计调整而暂时停工,同年12月27日恢复施工,预计2008年3月完工。工程总造价22.67亿元。 “鸟巢”外形结构主要由巨大的门式钢架组成,共有24根桁架柱。国家体育场建筑顶面呈鞍形,长轴为332.3米,短轴为 296.4米,最高点高度为68.5米,最低点高 度为42.8米。 体育场外壳采用可作为填充物的气垫膜,使 屋顶达到完全防水的要求,阳光可以穿过透明 的屋顶满足室内草坪的生长需要。比赛时,看 台是可以通过多种方式进行变化的,可以满足 不同时期不同观众量的要求,奥运期间的20,000个临时座席分布在体育场的最上端,且能保证每个人都能清楚的看到整个赛场。入口、出口及人群流动通过流线区域的合理划分和设计得了完美得到的解决。 鸟巢设计中充分体现了人文关怀,碗状座席环抱着赛场的收拢结构,上下层之间错落有致,无论观众坐在哪个位置,和赛场中心点之间的视线距离都在140米左右。“鸟巢”的下层膜采用的吸声膜材料、钢结构构件上设置的吸声材料,以及场内使用的电声扩音系统,这三层“特殊装置”使“巢”内的语音清晰度指标指数达到0.6——这个数字保证了坐在任何位置的观众都能清晰地收听到广播。

水立方英文导游词

水立方英文导游词 篇一:水立方英文 Beijingnationalaquaticscenter nationalSwimmingcenter--ExquisiteandExciting”watercube”itssurface,isa shapeverysimilartothestructureof”H2o”,theoutlookforthenationalSwimmi ngcenteratthe20XXolympicGames.afterthegames,itwillbecomearecreation alwaterparkopentothepublic.inchineseculture,waterisanimportantnaturalel ement.itcreatesacalmingatmosphereandinspireshappiness.Takingfullconsi derationofthefunctionsofwaterinrecreationandbodybuilding,designershave exploredmanywaysforpeopleofdifferentagegroupstoappreciateitsfunction. Thedesigniscalled”watercube”.manycreativedesignshavebeenemployedint hecreationoftheswimmingpoolsattheswimmingcenter.otherhigh-techfacilit iesincludingopticaldevicesusedtodefinepositionsofathletes,andmultiple-an gle,three-dimensionalscreeningsystemsareprovidedtohelpspectatorsenjoyc ompetitions. ThenationalSwimmingcenter,oneofthethreelandmarkbuildingsforthe20XX BeijingolympicGames,islocatedinsidetheBeijingolympicPark.coveringato talfloorspaceof50,000squaremeters,ithas17,000seats.Theprojectcostsabout US$100million.Thecenterwillbeavenueforswimming,diving,synchronized swimmingandwater-pologamesduringtheperiodoftheolympicGames.aftert

水立方调查设计研究报告

中矩之方,梦幻之蓝 ——国家游泳中心“水立方”调研报告

国家游泳中心(以下简称“水 立方”)是2008年北京奥运会三大 标志性建筑物之一,也是北京市政 府指定的惟一一个由港澳台侨胞 捐资建设的标志性奥运场馆。奥运 会期间,承担游泳、跳水、花样游 泳等比赛。奥运会赛后将成为一个 多功能的大型水上运动中心;既可 举办大型国际赛事,又能为公众提 供水上娱乐、运动、休闲、健身等 服务。 “水立方”位于奥运公园B区, 坐落于奥林匹克中心区西南角。主 体建筑紧邻城市中轴线,并与国家 体育场相对于中轴线均衡布置。本 工程为特级体育建筑。主体结构设 计使用年限100年。 “水立方”以中国传统文化 中的“天圆地方”为设计理念,采用方盒子的形式,充分运用新的结构形式与膜材料,将现代科技与传统价值观念充分揉合,展现出了强大的表现力与震撼力,为2008年北京奥运会写下浓墨重彩的一笔。 关于水的立面泡泡吧钢结构 二层观众通道热身池

一、项目概况 项目名称:国家游泳中心 项目地点:北京奥林匹克中心区B区 基地面积:6.28m2 建筑面积:8.7万m2 建筑高度:31m 容积率:1.23 坐席数:赛时17000,赛后6000 (固定座位数:4000个永久,2000个可拆除) 停车位:384辆 结构:钢筋混凝土+钢结构 钢结构设计总重量:约6700吨 国标钢材:Q345C、Q420C 钢结构杆件总数:20670根 焊接球:9843个 设计/建成:2003年4月-2006年6月/2008年1月 设计团队:中建总公司国家游泳中心设计联合体 中建总公司 CCDI中建国际设计 PTW Architects Arup 设计总负责人:赵小钧 执行总负责人:郑芳 建设单位:北京市国有资产管理有限公司 施工单位:中建一局 设计团队: 建筑:中建国际(深圳)设计顾问有限公司 PTW Architects 结构:中建国际(深圳)设计顾问有限公司/ARUP 机电:中建国际(深圳)设计顾问有限公司/ARUP 经济:中建国际(深圳)设计顾问有限公司 “水立方”总平面图

水立方造型设计分析

水立方造型设计分析 国家游泳中心又被称为“水立方”(Water Cube),位于北京奥林匹克公园内,是北京为2008年夏季奥运会修建的主游泳馆,也是2008年北京奥运会标志性建筑物之一。 水立方的实用性:水立方作为奥运会的主游泳馆而出现,为奥运会的游泳项目的成功进行提供了基础的物质保障,它融建筑设计与结构设计于一体,设计新颖,结构独特,与国家体育场比较协调,功能上完全满足2008年奥运会赛事要求,而且易于赛后运营。赛后,水立方作为一个大型的嬉水乐园呈现在人们面前。水立方的工作性能优良,它的地面做了特殊处理,使人脚踩在上面不会感到冷。其次它的四壁用铁网架焊接为一体,支撑着整个屋顶。这些钢构件在阴雨天一方面可以起到避雷作用,另一方面可以作为天沟收集雨水等等。 水立方的经济性:水立方中采用了多项先进技术,包括热泵的选用、太阳能的利用、水资源综合利用、先进的采暖空调系统,以及控制系统和其他节能环保技术,如采用内外墙保温,减少能量的损失;采用高效节能光源与照明控制技术等。此外,泳池换水全程采用自动控制技术,提高净水系统运行效率,降低净水药剂和电力的消耗,可以节约泳池补水量50%以上。泳池和水上游乐池也都采用防渗混凝土以防渗漏。除了泳池用水,“水立方”的其他用水也十分节约。洗浴等废水,经过生物接触氧化、过滤,再用活性炭吸附并消毒后,用于场馆内便器冲洗、车库地面的冲洗以及室外绿化灌溉。为尽可能减少

人们在使用时对水的浪费,“水立方”对便器、沐浴龙头、面盆等设备均采用感应式的冲洗阀,合理控制卫生洁具的出水量,并在各集中用水点设置水表,计量用水量。 水立方的美观性:最引人注意的外围形似水泡的ETFE膜(乙烯-四氟乙烯共聚物)是一种透明膜,能为场馆内带来更多的自然光,他的内部是一个多层楼建筑,对称排列的大看台视野开阔,馆内乳白色的建筑与碧蓝的水池相映成趣。基于“泡沫”理论的设计灵感,他们为“方盒子”包裹上了一层建筑外皮,上面布满了酷似水分子结构的几何形状,表面覆盖的ETFE膜又赋予了建筑冰晶状的外貌,使其具有独特的视觉效果和感受,轮廓和外观变得柔和,水的神韵在建筑中得到了完美的体现。晚上水立方被冠以深深地蓝色,犹如海洋中的一方水,给钢筋混泥土的城市增添了许多动感。白天,水立方成白色,犹如一个美丽的冰雕,给人以视觉上的美的享受。 水立方是北京奥运会国家游泳中心,它的膜结构是世界之最。它是根据细胞排列形式和肥皂泡天然结构设计而成的,这种形态在建筑结构中从来没有出现过,创意十分奇特。在奥运会结束后,水立方已成为北京市的新地标。

学校景点介绍中文英文

学校景点介绍中文英文 导语:学校是我们学习的地方,那么大家都是怎么去介绍自己的学校的呢?,接下来为大家介绍学校景点介绍中文英文文章,仅供参考! 学校景点介绍中文英文 英文: Wuhan Heping Middle School Our shool, Wuhan Heping Middle School, lies in the center of Wuhan city. It was just built and has the perfect size. The school yard is two hundred meters long, one hundred meters wide, and is surrounded by trees. When you walk throught the front gate, there is a huge garden that greets you with every kind of natural things. To the left is the school library in which there are more than 100, 000 books. To the right is the experiment building. In the very middle of the school yard stands the teaching building that stretches for one hundred and fifty meters. This teaching building has four floors with the teachers’ offices at either end of each floor. Standing on the top of the teaching building, you can see a flower bed. Behind the teaching building is a large playground on the right side. The students often do sports here after class.

“水立方”特色探秘5页

“水立方”特色探秘 一、“水立方”简介 “水立方”自2003年12月开建,历时4年多完工。它融合了众多时代前沿的高新科技,是名副其实的建筑大手笔。 场馆名称:国家游泳中心 地点:奥林匹克公园 建筑面积:79, 532平方米 功能:举行游泳比赛、跳水比赛、花样游泳比赛 完工时间:2007年10月 二、“水立方”特色揭秘 1.“水立方”最大的特色是它的膜结构 “水立方”是世界上最大的膜结构工程,建筑外围的“泡泡”所用的材料是“ETFE”,也就是我们常说的“聚氟乙烯”。这种材料耐腐蚀性、保温性俱佳,自身清洁能力强,可以利用自然的雨水完成自身清洁。跟玻璃相比,这种新兴的环保材料可以透进更多的阳光和空气,能让泳池保持恒温,能节电30%。除了地面以外,“水立方”通体采用了膜结构,是世界上最大的膜结构建筑。它是许多高新技术产物的综合体:首先是它具有较强的隔热功能,在天气炎热的时候,为场内空调的节能大大地做出了贡献;其二,半透明的气枕透光性很好,四面映射的自然光与室内照明相结合,根据场内活动的需要,由计算机通过气枕控制着透光量,可以随时调节,使场内没有任何光照死角。其三,“水立方”采取的LED景观照明方案,使晚间的气枕放射出梦幻般的蓝色光芒。其四,这些膜材料不仅环保

节能,具有利用雨水自洁的功能,每年还能回收雨水一万多吨,相当于一百户居民一年的用水量。 2.耐高温715℃的燃点不容易起火 “水立方”外层膜的延展性也很强,可以被拉伸到本身的3~4倍。715℃的燃点将保证膜结构的消防安全,即便被点燃,这种材料在燃烧时也并不会扩散,且无烟、无燃烧物掉落。“水立方”膜结构的充气系统是全自动的,其中任何一个细节出现问题,工作人员都能通过电脑及时监测到。每个气枕都有一个相对独立的充气系统,不会出现一损俱损的情况。气枕的维修也非常方便,万一出现外膜破裂、漏气的情况,工作人员将在8小时对破损的外膜修补或更新。 3.“水立方”自己会“洗脸” “水立方”的膜材料ETFE不仅环保节能,还具有自洁功能。ETFE膜材本身具有不侵水性,水从上面滑过不留水痕,而气枕上面的杂物、尘埃、尘土等,则会通过雨水的自然降落而被清洗掉。另外,国家游泳中心也已经制定了一套完整的清洁方案,用以对整个屋面或墙面进行整体清洁。 4.“水立方”会发光 阳光下的“水立方”有很多闪闪“发光”的亮点,宛若星辰散落在“水立方”的表面。这些亮点就是镀点。镀点是功能性镀点。通过镀点,膜结构变成光和热的过滤器,需要的进来。不需要的返回去。镀点改变光线的方向,将多余的光线和热量挡在场馆之外,从而保证了酷热天气里“水立方”不会成为巨大的“温室浴场”。 5.“水立方”水温恒定28℃

雅思口语题目详解: an unusual building

雅思口语题目详解:an unusual building 雅思口语考试中有一道题是描述哦一个不寻常的建筑,你是不是立刻脑洞大开到大裤衩,鸟巢,水煮蛋?这次为大家整理关于此题目的思路,看这个建筑要怎样叙述才体现它的不寻常。 Describe an unusual building you’ve visited You should say: where it is what it is used for what it looks like and explain why you think it is unusual 该怎么回答呢,其实建筑物一直是雅思口语的热门考题,建议大家看一些建筑的官网。不仅有亮点介绍(unusual),还有一些比较准确的英文描述,很实用的呢 举个例子来说:广州塔(Canton Tower),昵称小蛮腰(the slender waist),如果我们打开官网,里面的内容真够丰富。看来小蛮腰不仅造型独特,还是休闲娱乐(谈恋爱)的好去处。 话题考频: 建筑物的话题一直是雅思口语话题的热门考题,有时考察的是历史建筑,有时考察的是现代建筑物,这个话题可以涵盖古今建筑,只要突出其“unusual/不同寻常”的特征即可 相关考题: Describe a modern building Describe a historic building 话题解析:

1.在回答这个问题的时候,为了能详细且准确地介绍该建筑物,最好能提前准备一些与建筑物相关的一些词语,比如说“外部”、“内部”、“柱子”、“面”等等,因此,我们可以登陆我们感兴趣的建筑物的英文介绍页面,最好是官方的网站,把里面的一些介绍性的,可取的说法借用过来,这个也是我们所讲的考试前要做准备 2.题目的核心词是“unusual”一字,所以我们在开头以及结尾的时候最好要突出该建筑物比较独特的地方,才能扣题 3.在解释“为何我觉得此建筑物很独特”的时候,要注意关于原因的表达,因果关系要合乎逻辑,比如在接下来要说到的范文当中,小蛮腰造型奇特,且又是当地地表与娱乐场所,用以交代选择说小蛮腰的原因 4.此话题将以广州的地标建筑广州塔作为范例,广州塔有一个外号叫“小蛮腰”,之所以叫这个名字是因为其独特的造型,同时它也是广州人休闲娱乐的好去处,元旦、农历新年、圣诞节也会有很多灯光秀活动,话题可延续性较强话题词汇参考: 1.电视塔:TV tower 2.小蛮腰:slender waist 3.观光:sightseeing 4.地点:venue 5.摩天轮:ferris wheel 6.(小蛮腰的)椭圆形的面:ellipse 7.外部:exterior

水立方灯光设计分析

水立方灯光设计分析 一、 经过清洗的“水立方”外膜透光度明显增加,在蓝色主灯光的照射下更加晶莹剔透,期间闪烁变幻的红、黄、绿灯光组合也更加鲜艳夺目,呈现出色彩斑斓如诗如画的梦幻佳境。 二、 在水立方照明中,夜晚的水立方将被最大程度展现它的玲珑剔透,恬淡迷人的特征。将延续其水“可变”的特质,通过灯光赋予它一种动感照明效果可模拟起伏而浮光玲玲的水面,也可通过模拟光在水中的折射、透射和反射,模拟水下光感,需从视觉上达到一定的进深感、体积感和浑然一体感。水波及其带来的光的变化为必备主题。配合不同庆典事件的场合、季节转换及现场互动需求,“水立方”可呈现出不同的“表情”—不同的角度、不同的颜色。在夜晚,这个水分子建筑会与东面的国家体育场交相呼应。

三、 “水立方”幔态显示屏长104米,高20米,主体面积达2080平方米。LED显示显示系统安装在主题墙面充气膜的夹层之中。巨大的屏体面积和复杂的安装环境为整个工程增加了很大难度,经过反复讨论和验证,采用了“空气内透光照明方式”,即在固定外层其中钢结构内侧安装灯具向外侧投射的照明方式,这样光之透过半个气枕,光的损失仅为空腔内透光照明方式的一半,可到达比较理想的照明效果。这种照明方式的采用,为建筑物景观的照明增加了一种新的方式,开创了建筑物景观照明的先河,对于膜建筑和玻璃幕墙建筑的建筑物景观照明有着重要意义,“水立方”要求LED灯具白天不要影响建筑外观,夜晚LED照明不要影响室内照明,做到见光不见灯。由于LED光源表面亮度较大,如投射方向和角度不合适,在一定位置会看到光斑,影响照明效果。经过大量现场试验,确定了在气枕的下侧钢结构上安装灯具,向上投射,这样就不会看到光斑。 四、 “水立方”是以蓝色为基本色调的建筑,灯光也需要有红光,蓝色象征着“水”,红色象

鸟巢英文介绍

The Beijing National Stadium, also known as the bird's nest will be the main track and field stadium for the 2008 Summer Olympics and will be host to the Opening and Closing ceremonies. In 2002 Government officials engaged architects worldwide in a design competition. Pritzker Prize-winning architects Herzog & de Meuron collaborated with ArupSport and China Architecture Design & Research Group to win the competition. The stadium will seat as many as 100,000 spectators during the Olympics, but this will be reduced to 80,000 after the games. It has replaced the original intended venue of the Guangdong Olympic Stadium. The stadium is 330 metres long by 220 metres wide, and is 69.2 metres tall. The 250,000 square metre (gross floor area) stadium is to be built with 36 km of unwrapped steel, with a combined weight of 45,000 tonnes. The stadium will cost up to 3.5 billion yuan (422,873,850 USD/ 325,395,593 EUR). The ground was broken in December 2003, and construction started in March 2004, but was halted by the high construction cost in August 2004. In the new design, the roof of the stadium had been omitted from the design. Experts say that this will make the stadium safer, whilst reducing construction costs. The construction of the Olympic buildings will continue once again in the beginning of 2005. In depth The stadium's appearance is one of synergy, with no distinction made between the facade and the superstructure. The structural elements mutually support each other and converge into a grid-like formation - almost like a bird's nest with its interwoven twigs. The spatial effect of the stadium is novel and radical, yet simple and of an almost archaic immediacy, thus creating a unique historical landmark for the Olympics of 2008. The stadium was conceived as a large collective vessel, which makes a distinctive and unmistakable impression both from a distance and when seen from up close. It meets all the functional and technical requirements of an Olympic National Stadium, but without communicating the insistent sameness of technocratic architecture dominated by large spans and digital screens. Visitors walk through this formation and enter the spacious ambulatory that runs full circle around the stands. From there, one can survey the circulation of the entire area including the stairs that access the three tiers of the stands. Functioning like an arcade or a concourse, the lobby is a covered urban space with restaurants and stores that invite visitors to stroll around. Just as birds stuff the spaces between the woven twigs of their nests with a soft filler, the spaces in the structure of the stadium will be filled with inflated ETFE cushions. Originally, on the roof, the cushions were to be mounted on the outside of the structure to make the roof completely weatherproof, but the roof has been omitted from the design in 2004. While the rain was to be collected for rainwater recuperation, the sunlight was to filter through the translucent roof, providing the lawn with essential ultraviolet radiation. On the facade, the inflated cushions will be mounted on the inside of the structure where necessary, e.g.

水立方调研分析报告样本

水立方调研分析报告

中矩之方,梦幻之蓝 ——国家游泳中心“水立方”调研报告

国家游泳中 心(以下简称“水 立方”)是2008年 北京奥运会三大 标志性建筑物之 一,也是北京市政 府指定的惟一一 个由港澳台侨胞 捐资建设的标志 性奥运场馆。奥运会期间,承担游泳、跳水、花样游泳等比赛。奥运会赛后将成为一个多功能的大型水上运动中心;既可举办大型国际赛事,又能为公众提供水上娱乐、运动、休闲、健身等服务。 “水立方”位于奥运公园B区,坐落于奥林匹克中心区西南角。主体建筑紧邻城市中轴线,并与国家体育场相对于中轴线均衡布置。本工程为特级体育建筑。主体结构设计使用年限100年。 “水立方”以中国传统文化中的“天圆地方”为设计理念,采用方盒子的形式,充分运用新的结构形式与膜材料,将现代科技与传统价值观念充分揉合,展现出了强大的表现力与震撼力,为

2008年北京奥运会写下浓墨重彩的一笔。 关于水的立面 泡泡吧钢结构 二层观众通道 热身池 一、项目概况 项目名称:国家游泳中心 项目地点:北京奥林匹克中心区B区 基地面积: 建筑面积: 建筑高度:31m

容积率: 坐席数:赛时17000,赛后6000 (固定座位数:4000个永久,2000个可拆除)停车位:384辆 结构:钢筋混凝土+钢结构 钢结构设计总重量:约6700吨 国标钢材:Q345C、Q420C 钢结构杆件总数:20670根 焊接球:9843个 设计/建成:2003年4月-2006年6月/2008年1月 设计团队:中建总公司国家游泳中心设计联合体中建总公司 CCDI中建国际设计 PTW Architects Arup 设计总负责人:赵小钧 执行总负责人:郑芳 建设单位:北京市国有资产管理有限公司 施工单位:中建一局

国家游泳中心水立方结构分析

国家游泳中心水立方结构分析 国家游泳中心 水立方结构分析 姓名:岳敏 学号:1101103-21 指导老师:蒋毅 主要内容 一、工程概况 二、多面体刚架结构的几何、受力分析 三、ETFE膜结构材料、力学性能分析 四、荷载与结构整体受力分析 1、工程概况 本工程的建筑造型为“充满水的立方体”,平面尺177.338m×177.338m,建筑墙体底标高+1.059m,屋顶标高30.587m。屋面及支撑墙结构由新型多面体空间钢架构成水滴的骨架。钢结构总用钢量共约6300吨,钢材选用Q345C、Q420C。结构节点形式分为球型、半球型、方钢管相贯三种,杆件分为圆钢管、方钢管两种形式。所有构件壁厚由6mm到40mm。节点9290个,杆件数量将近20670根。 1、三维空间的最有效分割 十九世纪末,爱尔兰数学家Lord Kelvin提出这样一个问题:如果将三维空间细分为若干个小部分,并且每个部分体积相等但要保证接触面积最小,那么这些细小的部分应该是什么形状,” 1993年,爱尔兰教授Denis Weaire和Robert Phelan提出一种解答:在一个组合体系中设置6个十四面体和2个十二面体,两

者共有三种表面形状,一种六边形和两种五边形,棱边有四种边长,有三种角点形式(如图1)。这种空间者虽不能被认定为最终解答,却是三维空间最理想的空间组合结构。如果将这样的解答延伸到建筑、结构领域,无疑会给材料的节约与经济带来很大的优势。这是Weaire-Phelan(下称W-P)多面体组合成为国家游泳中心的原因之一。 2、整体结构的生成 该结构最基本的特点是其几何构成不同于传统的空间网架结构,传统的网架结构都是由简单的基本单元(三角锥,四角锥等)组合而成。而该结构以由W-P气泡衍生改良得到的多面体为基本单元,进行空间阵列,形成一个比“水立方”的实际体量大得多的空间多面体阵列结构。这种经过阵列而未经旋转即进行切割得到的平板型多面体空间刚架结构的

国家游泳中心(水立方)详细介绍

工程地点:奥林匹克公园B区,奥林匹克中心区西南角 承建单位:中建一局集团建设发展有限公司 建设单位:北京市国有资产经营有限责任公司 设计单位:国家游泳中心中建设计联合体 监理单位:北京帕克国际工程咨询有限公司 工程造价: 建筑面积:79532㎡ 建筑层数: 建筑高度:31m 幕墙类型: 结构类型:钢混剪力墙+钢结构+膜结构 开工日期:2003年12月24日 竣工日期:2008年1月26日 工程简介: 本工程位于奥林匹克公园B区,奥林匹克中心区西南角,主体建筑紧邻城市中轴线,并与国家体育场相对于中轴线均衡布置。东面为景观路,西侧为景观西路,南侧紧临北顶娘娘庙,北侧为成府路。工程占地62828m2,赛时建筑面积79532 m2,标准坐席17000个,其中临时坐席约11000个(赛后将拆除),永久坐席约6000个。整个结构外形为立方体,平面尺寸为176.538×176.538m,地上高度约31m。内部主要为钢筋混凝土结构,拥有1个标准竞赛池、1个标准热身池和1个标准跳水池及近5000 m2的嬉水乐园。 工程特点、难点 1、重要的影响力 奥林匹克运动会是国际上最重要的综合性赛事,2008年的第29届奥运会是我国第一次承担有如此国际影响力的比赛,对体现我国特别是北京的综合实力是一项重大考验,从党中央国务院到全国人民都寄予了极大的期望,而硬件设施的建设是奥运会筹备阶段的重要组成部分,尤其本场馆是本次新建场馆中唯一由港澳同胞、台湾同胞和海外华侨为主捐资兴建项目,其意义是不言而喻的。国家游泳中心作为本次奥林匹克中心区主要场馆之一,它的开工与建设吸引了国人乃至全世界人民的目光,建设的最终质量必将成为全世界关注的焦点。 2、体现高性能混凝土的特性:本工程混凝土部分的耐久性设计年限为100年,必须从原材料的选择、施工过程的控制等方面达到高性能混凝土所要求的耐久性长及工作性好的特点。 3、建造符合奥林匹克运动会标准的游泳池: (1)高标准的质量要求:泳池、跳台对装修面完成后所达到的精度要求高于普通建筑,要比普通建筑的国家验收标准更加严格。施工过程中,与完成面尺寸相关的每一个环节:测量、模板的选择与支设、混凝土的浇筑、装修面的完成等必须严格控制,才能达到最终的精度要求。 (2)防水要求高:本工程的主要功能为游泳、跳水,建筑的主要空间为泳池,泳池的不透水性,即混凝土抗渗、防裂及防水材料是关键。从混凝土的配合比设计、防水剂的选择、混凝土的浇筑与养护工艺的选择、柔性防水材料厂家的选定等做到方案合理、现场控制有效。 (3)泳池装修的环保要求:泳池的内饰面为磁砖,磁砖本身首先必须耐水,其次要耐泳池水清洁处理剂的浸泡;粘贴磁砖的黏结剂必须既保证在水的浸泡下的不脱落,又对人无害,符合环保要求,磁砖的选择、黏合剂及施工质量的控制是至关重要的。 4、结构异常复杂的屋面及其支撑墙的新型延性多面体空间刚框架结构

水立方详细介绍

水立方详细介绍 国家游泳中心是北京2008年奥运会比赛场馆之一,其创意来自于肥皂泡的结构,因其外观酷似一个蓝色方盒子而被称为“水立方”。与“鸟巢”一样,“水立方”独特的结构设计给施工带来了很大难度,因为它是世界上第一个尝试实现这一肥皂泡结构体系的建筑。“水立方”的建筑外围护采用新型的环保节能ETFE(四氟乙烯)膜材料,由3000多个气枕组成,覆盖面积达到10万平方米。 建设地点:奥林匹克公园 建筑面积(M2):65000-80000。 座席数:永久座席为6000个,临时性座席11000个。 赛时功能:游泳、跳水、花样游泳、水球。 开工时间:2003.12.24。 工时间:2007年四季度。 “水立方”是世界上首个基于“气泡理论”建造的多面体钢架结构建筑。独特的结构设计给施工带来了很大困难。国家游泳中心总经理康伟说,“水立方”的创意来自于肥皂泡的构造。这种在自然界常见的形态从未在建筑结构中出现过。

“从截面上看,‘水立方’墙面和屋顶都分为内外3层,9803个球形节点、20870根钢质杆件中,没有一个零件在空间定位上是完全平行的,传统的二维图纸无法标出工件的坐标。因此,定位难成为‘水立方’施工中遇到的最大挑战。”康伟说。 在业主的委托下,中建国际(深圳)设计顾问有限公司联合国内4家研究单位,仅用了半个多月便把“水立方”的所有工件在三维空间上一一标出了坐标。30513个工件、91539个坐标值,堆成了两尺多高的施工图纸。作为自主创新成果,《新型多面体空间钢架结构设计理论》为“水立方”的钢结构搭建提供了技术标准。 随着奥运工程进度的不断推进,新标准、新工艺不断涌现。这些新标准、新工艺是奥运工 程留下的一笔宝贵财富,今后将成为同类建筑的参照标准。

从“水立方”看建筑中的技术

从“水立方”看建筑中的技术 引言 20世纪80年代以来,在全球兴起了绿色运动,是人类在可持续发展道路上的重要之举,改善生存环境,从建筑的角度,实现绿色,节能,环保建筑愈发体现出其重要性。而建筑技术作为实现其的一种手段,在建筑设计中将技术与艺术相结合,将极大的提高建筑的科技含量与艺术欣赏性。本文主要针对这一问题,并结合自己的学习体会,谈一下自己的体会,希望引起大家的共鸣。 1,建筑技术的发展及现状 近年来,我国的建筑业蓬勃发展,建筑技术的发展也是突飞猛进,建筑新材料的不断出现,大规模的生产方式。使我国出现了一大批雄伟,高耸,气度非凡的建筑物;建筑技术的交叉性与综合性以及多样性推动了建筑的发展与进步。科技水平的提高使现代文明的重要标志之一,随着人们对建筑技术认识的不断加深,对技术在建筑设计中的作用必将有更加全面与深入的思考,技术因素将作为解决问题的重要手段放在首要的位置,如何发挥技术的积极作用,将成为建筑设计中的关键问题。 目前,我国已经涌现出许多高质量的具有节能,环保理念,体现绿色理念的优秀建筑作品。这些作品都是建筑技术与艺术的完美结合。下面以国家游泳中心(水立方)为例,具体谈一下建筑设计中技术理念的体现。 2,实例分析(以“水立方”为例) 随着北京申奥成功及2008北京奥运的准备工作的进行,国家游泳中心,国家体育场等一大批的高水平建筑相继出现。它们引起了社会各界的广泛关注,对我国建筑技术的进步的推动作用使史无前例的。它们是我国建筑史上划时代的里程碑下面从几个方面,以水立方为例,探讨一下建筑技术在建筑设计中的具体体现。 (1),从建筑结构选型的角度来看 国家游泳中心,属于骨架支撑薄膜结构,以主体钢结构骨架支撑为主,将ETFE薄膜覆盖固定在薄膜骨架单元上,形成围护结构。 “水立方”相对于一班的建筑的最大不同是没有了传统建筑的元素(如门,窗,柱子,墙等)取而代之的是多面体空间钢结构单元,最终通过它们拼接形成整体结构。屋面采用平板结构的形式,受高跨比的制约厚度很大,所以钢结构大的用量很大。 钢结构用量的实现,ETFE薄膜通过钢转接架和铝合金膜架固定与钢军阿构主体架上。新技术的使用,使“水立方”的整体性和艺术性得到完美结合。 (2),从建筑构造原理与设计的角度来看

北京奥林匹克开幕式中英文对照解说词

北京奥林匹克开幕式中英文对照解说词 篇一:第29届奥林匹克运动会开幕式解说词 第29届奥林匹克运动会开幕式解说词(孙正平周涛解说)【20XX年08月08日20时】 央视网:8月8日,央视网将对北京奥运会开幕式进行图文直播。[08-08-0811:32] 央视网:现在距离开幕式还有不到一个小时的时间。奥运会主题曲刚刚公布,曲名为《你和我》,英文名为《youandme》。[08-08-0819:29] 央视网:参加开幕式的演员已经在“鸟巢”外集结完毕,随时准备入场。[08-08-0819:30] 央视网:开幕式烟火燃放时间大概在8点5分左右。[08-08-0819:30] 央视网:现在来看,鸟巢开幕式以后,天气可能在32度左右,湿度是60%到70%。从最新的雷达波来看,开幕式的时候,鸟巢的天气以阴为主。[08-08-0819:31] 央视网:五位主持人分别站在场地中央的北侧和南侧,引导观众有秩序地舞动手中的荧光棒,观众兴致高涨,按照指挥,一起舞动起荧光棒,并欢呼起来。[08-08-0819:34] 央视网:与会场离得最近的是摄影记者席,“长枪大炮”早已架满,摄影“老记”们正在找寻各自的角度,随时准备按动快门。和现场一样,位于“鸟巢”一层的摄影和文字记者工作间也早就坐满。开幕式还有1

个小时就开始了,而:北京奥林匹克开幕式中英文对照解说词)r,oneofthefourgreatinventionsinancientchina. 7.olympicRings Thefootprintschangeintoclustersoffallingstars,whichgathertoformtheolym picrings. 7.1The”footprints”passthroughTian'an menSquareandheadnorth,wit hthelast”footprint”explodingoverthenationalStadium,showeringtheolympi cvenuewithclustersof fallingstars,whichgathertoformthefiveolympicrings. 7.2Twentygracefulfairiesfloattowardsthegroundandclusteraroundtheolym picrings,manifestingbeautyandromance.Theircostumesglowwithlight. 8.EntryofthechinesenationalFlag EightflagbearerscarrytheflagintotheStadiumhorizontallyandsolemnlydispl aythechinesenationalflag.achildsingsaHymntomycountry. 篇三:北京开幕式奥运nBc英文解说Thefootprintsintheirhistorystretchback5000years, butfortheworld'sgreatestwallbuilders, makersofaforbiddencity,whathappenstonightisnotmerelyasmallstep, butagreatleap.chinaiswelcomingtheworld. whowilltheybewhenthisisover? Theclockoftheirliveshasbeenbeatingwithascreamingurgency. Theyhavepushedthemselvestobeassharpasarazor'sedge,forthissumm

北京北奥集团简介

北京北奥集团有限责任公司 北京国资大型文化体育集团——北京北奥集团今天( 2011年1月18日)正式成立。 今天的国家体育场“鸟巢”金色大厅内,来自国内外文化界、体育界、中央以及北京市新闻媒体逾百余人,共同见证“国资文体旗舰今启航”行动——北京北奥集团有限责任公司揭牌仪式。新成立的北京北奥集团成员企业包括:北京北奥集团有限责任公司、北京北奥大型文化体育活动有限公司、北京市演出有限责任公司、北京市对外文化交流有限责任公司、北京时博国际体育赛事有限公司、北京北奥会展公司、北京北奥广告公司、北京北奥国际旅行社有限公司。 当天的揭牌仪式以“国资文体旗舰今启航”命名,此次“旗舰启航”行动,昭示着北奥集团发展方向和战略定位的全新调整。 本次调整的第一项内容,始于2010年3月,根据北京市国资委

主营业务整合重组的要求,北奥有限责任公司整体划转至北京市国有资产经营有限公司旗下。 第二项内容是借助划转契机,全面梳理北奥公司原有业务项目,集中文化体育产业领域发展,其他业务逐渐剥离。同时,国资公司将所持有的北京演出有限公司、北京对外文化交流有限公司,北京时博国际体育赛事公司等文化创意企业划转北奥旗下。 第三项内容是加盟国资后,北奥集团同时获得国资文化创意板块的各项资源,包括“鸟巢”、“水立方”等奥运场馆硬体资源、国资公司支持文化创意产业的金融、政策支持等,全力打造国资文化体育产业旗舰集团。 北京市国有资产经营有限公司董事长李爱庆表示,北京国资公司作为“鸟巢”、“水立方”的业主和运营方,可以弥补北奥公司缺乏大型文化、体育活动经营场地的缺陷,北奥进入国资,与国资体系内原有演出赛事等文化体育企业重组成立“北京北奥集团”之后,实现了北京奥运“软硬体”资源的优势互补和强强联合,以“鸟巢”、“水立方”为基地的北京北奥集团,将发展成为后奥运时期,首都文化体育产业的重要平台。 下一步,国资公司文化创意板块将以北奥为首要平台,与两大奥运场馆和文化体育资源相整合,以“舞动北京”为目标,积极推出精品国际赛事、文化演出、大型活动等长线产品,形成市场化、系列化、规模化,打造市属国有企业中最大的文化体育产业平台。 这场结合,也被外界喻为北京奥运创意、制作团队与“鸟巢”、“水

相关主题
文本预览
相关文档 最新文档