Construction projects, private and public alike, have a long history of cost escalation. Transportation projects, which typically have long lead times between planning and construction, are historically underestimated, as shown through a review of the cost growth experienced with the Holland Tunnel. Approximately 50% of the active large transportation projects in the United States have overrun their initial budgets. A large number of studies and research projects have identified individual factors that lead to increased project cost. Although the factors identified can influence privately funded projects the effects are particularly detrimental to publicly funded projects. The public funds available for a pool of projects are limited and there is a backlog of critical infrastructure needs. Therefore, if any project exceeds its budget other projects are dropped from the program or the scope is reduced to provide the funds necessary to cover the cost growth. Such actions exacerbate the deterioration of a state’s transportation infrastructure. This study is an anthology and categorization of individual cost increase factors that were identified through an in-depth literature review. This categorization of 18 primary factors which impact the cost of all types of construction projects was verified by interviews with over 20 state highway agencies. These factors represent documented causes behind cost escalation problems. Engineers who address these escalation factors when assessing future project cost and who seek to mitigate the influence of these factors can improve the accuracy of their cost estimates and program budgets

Historically large construction projects have been plagued by cost and schedule overruns Flyvbjerg et al. 2002. In too many cases, the final project cost has been higher than the cost estimates prepared and released during initial planning, preliminary engineering, final design, or even at the start of construction “Mega projects need more study up front to avoid cost overruns.” The ramifica tions of differences between early project cost estimates and bid prices or the final cost of a project can be significant. Over the time span between project initiation concept development and the completion of construction many factors may influence the final project costs. This time span is normally several years in duration but for the highly

complex and technologically challenging projects it can easily exceed 10 years. Organizations face a major challenge in controlling project budgets over the time span between project initiation and the completion of construction. The development of cost estimates that accurately reflect project scope, economic conditions, and are attuned to community interest and the macroeconomic conditions provide a baseline cost that management can use to impart discipline into the design process. Projects can be delivered on budget but that requires a good starting estimate, an awareness of factors that can cause cost escalation, and project management discipline. When discipline is lacking, significant cost growth on one project can raze the larger program of projects because funds will not be available for future projects that are programmed for construction

A history of past project experiences can serve one well in understanding the challenges of delivering a quality project on budget. Repeatedly, the same problems cause project cost escalation and much wisdom can be gained by studying the past. The Holland Tunnel was, when it opened in 1927, the longest underwater tunnel ever constructed and it was also the first mechanically ventilated underwater tunnel. Its initial cost estimate was made by the renowned civil engineer George Washington Goethals. A review of the Holland Tunnel project serves to highlight the critical issues associated with estimating the costs of large complex projects and the fact that even the most distinguished engineers have trouble assessing cost drivers beyond the physical characteristics of a project. Many times there is no recognition of the cost driver s operating outside the project’s physical configuration. A joint New York and New Jersey commission in 1918 recommended a transportation tunnel under the river “Urges new tunnel under the Hudson.” 1918; “Ask nation to share in tunnel to Jersey.” 1918. The automobile was emerging as the predominate means of transportation and it was decided that this tunnel should be for vehicular traffic. As a result the tunnel would employ new ventilation technologies to purge the exhaust gases produced by the internal combustion engine. Eleven designs were considered for the tunnel, most notably, one by the engineer recently responsible for finishing the Panama Canal, George Washington Goethals. He envisioned a single, bilevel

tunnel with opposing traffic on each level. Goethals made a planning project cost estimate of $12 million and 3 years for construction. World War I had consumed much of the nation’s steel and iron production, so his design made use of cement blocks as the tunnel’s structural shell. His design was the frontrunning plan “Hudson vehicle tube.” but he had responsibilities elsewhere and was not named chief engineer for the project. Clifford M. Holland was named to head the project along with a board of five consulting engineers “Name interstate tunnel engineers.” 1919. Holland came to the project with vast experience in constructing subways and tunnels in New York. The cost of the project was taken to be $12 million, Goethals’ planning estimate. Holland produced a report in February of 1920 based on his a nalysis of the Goethals’ design of the project. His findings were not what had been expected. Holland found ? Goethals’ width of 7.47 m would not accommodate the volume of traffic.

? Concrete blocks would not withstand the structural loads exerted on the t unnel.

? The construction methods required by Goethals’ design were completely untried.

? The estimated cost of construction was grossly low.

? The work could not be completed in 3 years.

The board of consulting engineers gave unanimous support for Holland’s analysis. Holland then presented a design of his own which was supported unanimously by the consulting engineers. Holland’s design, which was a major scope change, called for twin cast-iron tubes. One advantage was that construction would follow established methods of tunnel construction that had been implemented for rail tunnels under the East River and further up the Hudson. Holland estimated the cost at $28,669,000 “Asks $28,669,000 for Jersey tube.” 1920 and construction time at 31/2 years.

Debate about the tunnel design continued for more than a year creating disagreements between the New York and New Jersey Commissions and delaying the work—a schedule change. A disagreement about awarding a contract on the New Jersey side further delayed the start of construction and added over half of a million dollars in cost. Construction started on the New York side in October of 1920 and in

late December 1921 the New Jersey portion of the tunnel was bid “Way all cleared for Jersey tunnel.” The mandated completio n date was December 31, 1926. The construction schedule had now grown to 5 years. Estimated project cost increased multiple times throughout the early years of construction as a result of scope creep, schedule delays, and inflation. Increased traffic forecast necessitate larger entrance/exit plazas and acquisition of more right of way “Vehicular tube is growing.” 1923. Then increases in material and labor costs had added another $6 million to the project inflation. By the beginning of 1924, reestimated costs had been increased by $14,000,000 “Vehicular tunnel cost up $14,000,000.” 1924 due to functional and aesthetic factors scope creep. More intricate roadway designs for approaches, widening of the approach roadways, and architectural treatments increased the costs more scope creep. Redesign of the ventilation system added 15.24 cm to the tunnel diameter and $4,422,000. Holland also decided to substitute cast-steel for castiron to increase the strength and safety factors of the tunnel more scope creep. Last, the New Jersey ventilation shafts had to be redesigned along with their corresponding foundations at a cost of $700,000 due to unexpected soil conditions unforeseen conditions. All of these changes increased the estimate to over $42.5 million. New funds were appropriated and it was believed that these were sufficient to complete the project, but by February of 1926, there was another increase of $3,200,000 “$3,200,000 more asked for tunnel.” The commission explained that the new costs were due to increases in labor and material costs challenge in controlling cost. At this time Holland died of heart failure and his assistant, Milton H. Freeman, took over as chief engineer only to die of pneumonia 4 months later. Ole Singstad, the designer of the ventilation system then became chief engineer and brought the project to completion. Having three different chief engineers within 5 months created confusion unforeseen events. In April of 1924 water rushed into one of the tunnels from a leak forcing workers to make a hasty escape more unforeseen conditions. A final appropriation was requested in early 1927 brought the total project cost to $48,400,000. On November 13 of 1927 the tunnel officially opened “Work on tunnel began 7 years ago.” Methodology

The cost escalation factors that lead to project cost growth have been documented through a large number of studies. Studies have identified factors individually or by groups. Each factor presents a challenge to an agency seeking to produce accurate project cost estimates. As part of a larger study seeking to improve cost estimates and management of costs from project conception to bid day, a thorough literature review was conducted to identify factors that influence cost estimates Anderson et al. 2006. The literature review included exploration of research reports and publications, government reports, news articles, and other published sources. Upon completion of the literature review the factors were analyzed and categorized by the researchers into factors that drive the cost increases experienced by transportation construction projects. This was accomplished by triangulation where multiple investigators or data sources suggested the same factor. This categorization took the individual factors which had been identified in previous research and established a global framework for addressing the issue of project cost escalation. Upon final categorization the cost escalation factor framework was verified through triangulation of data from interviews with more than 20 state highway agencies SHAs around the nation . A previous project that supported identification of the factors had included telephone interviews with all 50 SHAs Schexnayder et al. 2003 . An interview instrument was prepared and tested initially during onsite interview with two SHAs. The revised interview instrument was then sent to the SHAs before the interview so that they could prepare. The interviews were conducted onsite for five SHAs through individual interviews and through a group “peer exchange.” The remaining interviews were conducted by telephone. In all cases, the researchers followed the interview protocol to ensure consistency in data collection. The resulting categorization of cost escalation factors can help project owners and engineering professionals focus their attention on the critical issues that lead to cost estimation inaccuracy.

The triangulation analysis considered methodologies from past studies and interviews to create a categorization for the causes of cost escalation. A better understanding of the cost escalation factors is achieved through understanding the

forces driving each factor or where the factor originates. With this understanding it is possible to design strategies for dealing with these cost escalation factors. The factors that affect the estimate in each project development phase are by nature internal and external. Factors that contribute to cost escalation and are controllable by the agency/owner are internal, while factors existing outside the direct control of the agency/owner are classified as external. The presentation order of the factors should not be taken as suggesting a level of influence is constructed to provide an over arching summary of the factors. It summarizes the factors into logical divisions and classifications and helps in visualizing how project cost estimates are affected. It is important to note that one of the factors points to problems with estimation of labor and material cost, but most of the factors point to “influences” that impact project scope and timing.

中文译文

私人和公共的建设项目,一直以来有成本增长的问题。交通运输项目,在计划和建设过程中具有典型的较长生产前置时间,这在历史上是被低估的。如图所示,通过对荷兰隧道建设的经验回顾增长的成本。在美国,大约50%的现役的大型运输项目都超出他们的最初的预算。大量的研究和研究项目已经确认个体因素导致增加的工程造价。虽然这个因素能影响私人资助项目鉴定效果,但是对公共资助的项目尤其不利。公共基金用于一些项目的建设效果是有限的,并且有积累的重要的基础设施的需要。因此,如果任何项目超过预算,其他项目被从这个计划删除或降低范围以提供必要资金来抵消成本的增长。这样的行为会加剧恶化的一个国家的运输基础设施。这项研究是通过对个人作品集的深入了解,来分门别类的鉴定费用增长因素。通过超过20个州际公路机构的验证,这18种分门别类的基本影响因素对各类建设项目的成本影响都适用。这些因素描绘了有据可依成本超支问题的原因。工程师在估计未来项目的成本因素,寻求减少它们的方法时考虑这些影响因素可以,提高他们的成本估算和项目预算的准确性。

历史的大型建筑工程已经饱受成本和时间超支的困扰(Flyvbjerg李玮2002)。在很多情况下,最后的项目成本一直高于估计的成本,发布时间可能在最初工程计划时,最终设计时,抑或在开始建设时“Mega项目需要更多的前提研究来避免成本超支。”(2002)早期的项目成本估计与最终报价结果或最终工程成本可以存在显著差异。在这个时间跨度里,项目启动发展概念和最终结束之间,许多因素会影响施工项目最终成本。这段时期通常持续几年,但对于高度复杂和技术挑战性的项目可以轻易超过10年。组织面临重大挑战的项目预算控制的时间跨度将从开始一直持续到完成的项目建设。开发成本估计准确反映工程范围、经济条件、社会利益协调和宏观经济条件提供基线成本管理,可以用来传递学科的设计过程。项目可以兑现预算,但需要一个好的开始,一个估算成本超支因素的意识,及项目管理法则。当缺少法则的时候,在一个项目上显著的成本增长会毁坏整体计划,因为经费将不适应未来项目的建设。

过去的历史经验,可以为建设一个优质项目的预算提供更好的理解。同样使

工程造价增长的问题和经验都可以从过去的事实中学到。荷兰隧道,当它在1927年开放时,是最长的水下隧道,它也是人类建筑史第一个机械通气的海底隧道。它的初始成本的估计是由著名的土木工程师George Washington Goethals做出的。回顾荷兰隧道工程,它突出反映了一个具有争议性的问题:关系到对复杂重大工程建设预算的估计和实际成本时,即使是最杰出的工程师也会在评估一个超过本身物理特性的工程的启动成本时遇到麻烦。许多次没有认识到工程外部物理配置的运作成本问题,纽约和新泽西委员会在1918年建设一个交通隧道在河里“敦促新隧道,哈德逊”,“让国人共用去球衣的隧道。”汽车是为主导的交通方式,

隧道被决定用于通车。正因如此,隧道会使用新通风技术来净化内燃机所产生的废气。11项设计被考虑在隧道建设里,最值得注意的是,一个由工程师负责整理最近为完成巴拿马运河建设的George Washington Goethals。他想像一个单一的、二层隧道与对方的交通每一层。Goethals做出规划项目成本估计1200万美元和3年建筑时间。第一次世界大战已经耗尽了很多国家的钢铁产品,所以他的设计,利用水泥街区为隧道结构的外壳。他的设计是领先的计划“赫德森车辆管。”(1919)。但他在别处有责任,并且不是这个项目的总设计师。他以荷兰克利头工程连同董事会的5号州际公路工程咨询的名字。荷兰带着在构建地铁、隧道项目的丰富经验来到在纽约的这个项目。“Goethals”计划的估计,这个项目的成本有120万美元。荷兰基于他的研究分析,在1920年2月份发表了一份报告,报告中说:他的发现并不是什么预期的好。荷兰发现:

?原来Goethals报告中7.47米的宽度不能适应车流。

?混凝土块不能承受隧道结构附件。

?Goethals所需的施工方法的设计完全是未经证实的。

?估计的建设成本是非常低的。

?工作不能在3年内完成。

咨询工程师的一致支持了荷兰的分析。提出了一个荷兰自己的设计,支持的咨询工程师一致通过。荷兰的设计,这是一个大范围的变化,称为“双铸铁管”。一个好处是将根据建设在东方河的隧道的经验和比哈德逊河更进一步。荷兰估计费用28,669,000美元,请求28,669,000美元的球衣试验,施工时间在三年多。

讨论了隧道的设计分歧已经持续了超过一年,创造了纽约和新泽西的佣金和

延缓工作一个时间表改变。一个合同授予了新泽西侧进一步推迟启动建设和增加超过一半的100万美元的成本。在纽约的建设开始于1920年10月之后,在1921年12月底,在新泽西的一部分隧道出价“允许球衣方式。”隧道委托的竣工日期是1926年12月31日。现在的施工进度已增加到5年。估计项目成本在早年的施工的蠕变、进度拖延、范围和通货膨胀上增加了多次。增加的交通量预测需要更大的出入口广场和获取更多的权利的方式“汽车隧道在增加”。然后材料和劳动力成本将另一个600万美元增加到项目的通货膨胀。在1924年,成本已经提高1400万美元,车辆隧道费用高达1400万美元。由于功能和美学的因素范围蠕变,更复杂的道路设计方法,拓宽路面的途径,增加了更多的成本建筑治疗范围蠕变。重新设计的通风系统加15.24公分的隧道直径及4,422,000美元的支出。荷兰也决定替代铸钢为铸铁增加强度和安全因素的多隧道范围蠕变。最后,在新泽西的通风井不得不重新设计相应的基础,随着他们的付出的代价,因为意想不到700,000美元的土地条件,所有的这些变化增加了42.5亿美元,超过估计。新的资金拨款,它被认为足以完成项目,但到了二月,另一项增加3,200,000美元,隧道申请另外3,200,000美元。委员会解释说,这是新的成本是由于增加成本挑战劳动和材料成本控制。这时荷兰总工程师死于心脏衰竭,他的助手,Milton H. Freeman接替总工程师4个月后死于肺炎。Ole Singstad,设计通风系统的设计师便成了总工程师并且把项目完成。有三个不同的总工程师,耗费5个月是可以遇见混乱。1924年4月份,水从一个裂缝冲进其中一个隧道,迫使工人匆忙逃跑的意外情况。最后一笔专用款项被使用在早期1927年工程,总造价48,400,000美元。1927年11月13日隧道正式投入使用。隧道建造工作开始于7年前。

增长的成本因素导致项目成本增长已通过大样本的研究记录,研究证实了单独或团体。每个因子的概念,提出了一种挑战,一个机构对项目的成本估计准确。作为一项大型研究试图提高成本预算和成本管理的概念,从项目的投标的一天,一个文献进行彻底的了鉴定费用估计影响因素等(2006)。文献包括勘探研究报告、出版物、政府报告、新闻文章,和其他公开来源。竣工后的文献回顾的因素进行了分析和分类的人员进入成本因素所经历的交通建设项目的增加。这是由三角在多个调查者或资料来源暗示同一因素。这种分类方法把个人因素,在先前的研究已经确定,并建立了全球框架,用于解决这个问题的工程造价升级。在最后

的分类的成本因素框架是通过验证升级的数据,从采访了三角法等20多个国家SHAS公路部门先前的工程支持识别的因素包括电话采访了50个沙斯党等面谈的准备和测试仪器是最初在现场采访两个沙斯党。修订后的采访乐器被送到了沙斯党面谈前,以便他们能准备。在随访现场为五个人访谈和通过沙斯党通过一组“同伴交流”剩下的随访电话。在所有情况下,研究人员追踪采访的协议,以确保在数据采集。结果分类的成本因素可以帮助升级项目业主和工程专业人员将注意力集中在这个关键问题,导致成本估算不精确。

从分析方法生成的已有研究成果的基础上,认为面谈来创建一个分类的成本的原因的规模。一个更好的理解成本因素是理解升级的部队各因素的驱动因素或者来源。在这层了解可能的设计策略,为应对这些成本升级的因素。这个因素影响的评估中,每一个项目都是由自然发展阶段的内部和外部的因素在起作用,控制成本升级的机构/业主为内部,而现有的直接控制的因素外,该机构/业主分为外部。这个报告的因素为不应被视为暗示一水平的影响并构建提供了潜在的因素。总结成逻辑划分的因素,并帮助在可视化分类项目成本预算是如何影响。

毕业论文的研究方法:

调查法

调查法是科学研究中最常用的方法之一。它是有目的、有计划、有系统地搜集有关研究对象现实状况或历史状况的材料的方法。调查方法是科学研究中常用的基本研究方法,它综合运用历史法、观察法等方法以及谈话、问卷、个案研究、测验等科学方式,对教育现象进行有计划的、周密的和系统的了解,并对调查搜集到的大量资料进行分析、综合、比较、归纳,从而为人们提供规律性的知识。

调查法中最常用的是问卷调查法,它是以书面提出问题的方式搜集资料的一种研究方法,即调查者就调查项目编制成表式,分发或邮寄给有关人员,请示填写答案,然后回收整理、统计和研究。

观察法

观察法是指研究者根据一定的研究目的、研究提纲或观察表,用自己的感官和辅助工具去直接观察被研究对象,从而获得资料的一种方法。科学的观察具有目的性和计划性、系统性和可重复性。在科学实验和调查研究中,观察法具有如下几个方面的作用:①扩大人们的感性认识。②启发人们的思维。

③导致新的发现。

实验法

实验法是通过主支变革、控制研究对象来发现与确认事物间的因果联系的一种科研方法。其主要特点是:第一、主动变革性。观察与调查都是在不干预研究对象的前提下去认识研究对象,发现其中的问题。而实验却要求主动操纵实验条件,人为地改变对象的存在方式、变化过程,使它服从于科学认识的需要。第二、控制性。科学实验要求根据研究的需要,借助各种方法技术,减少或消除各种可能影响科学的无关因素的干扰,在简化、纯化的状态下认识研究对象。第三,因果性。实验以发现、确认事物之间的因果联系的有效工具和必要途径。

文献研究法

文献研究法是根据一定的研究目的或课题,通过调查文献来获得资料,从而全面地、正确地了解掌握所要研究问题的一种方法。文献研究法被子广泛用于各种学科研究中。其作用有:①能了解有关问题的历史和现状,帮助确定研究课题。②能形成关于研究对象的一般印象,有助于观察和访问。③能得到现实资料的比较资料。④有助于了解事物的全貌。

实证研究法

实证研究法是科学实践研究的一种特殊形式。其依据现有的科学理论和实践的需要,提出设计,利用科学仪器和设备,在自然条件下,通过有目的有步骤地操纵,根据观察、记录、测定与此相伴随的现象的变化来确定条件与现象之间的因果关系的活动。主要目的在于说明各种自变量与某一个因变量的关系。

定量分析法

在科学研究中,通过定量分析法可以使人们对研究对象的认识进一步精确化,以便更加科学地揭示规律,把握本质,理清关系,预测事物的发展趋势。

定性分析法

定性分析法就是对研究对象进行“质”的方面的分析。具体地说是运用归纳和演绎、分析与综合以及抽象与概括等方法,对获得的各种材料进行思维加工,从而能去粗取精、去伪存真、由此及彼、由表及里,达到认识事物本质、揭示内在规律。

跨学科研究法

运用多学科的理论、方法和成果从整体上对某一课题进行综合研究的方法,也称“交叉研究法”。科学发展运动的规律表明,科学在高度分化中又高度综合,形成一个统一的整体。据有关专家统计,现在世界上有2000多种学科,而学科分化的趋势还在加剧,但同时各学科间的联系愈来愈紧密,在语言、方法和某些概念方面,有日益统一化的趋势。

个案研究法

个案研究法是认定研究对象中的某一特定对象,加以调查分析,弄清其特点及其形成过程的一种研究方法。个案研究有三种基本类型:(1)个人调查,即对组织中的某一个人进行调查研究;(2)团体调查,即对某个组织或团体进行调查研究;(3)问题调查,即对某个现象或问题进行调查研究。

功能分析法

功能分析法是社会科学用来分析社会现象的一种方法,是社会调查常用的分析方法之一。它通过说明社会现象怎样满足一个社会系统的需要(即具有怎样的功能)来解释社会现象。

数量研究法

数量研究法也称“统计分析法”和“定量分析法”,指通过对研究对象的规模、速度、范围、程度等数量关系的分析研究,认识和揭示事物间的相互关系、变化规律和发展趋势,借以达到对事物的正确解释和预测的一种研究方法。

模拟法(模型方法)

模拟法是先依照原型的主要特征,创设一个相似的模型,然后通过模型来间接研究原型的一种形容方法。根据模型和原型之间的相似关系,模拟法可分为物理模拟和数学模拟两种。

探索性研究法

探索性研究法是高层次的科学研究活动。它是用已知的信息,探索、创造新知识,产生出新颖而独特的成果或产品。

信息研究方法

信息研究方法是利用信息来研究系统功能的一种科学研究方法。美国数学、通讯工程师、生理学家维纳认为,客观世界有一种普遍的联系,即信息联系。当前,正处在“信息革命”的新时代,有大量的信息资源,可以开发利用。信息方法就是根据信息论、系统论、控制论的原理,通过对信息的收集、传递、加工和整理获得知识,并应用于实践,以实现新的目标。信息方法是一种新的科研方法,它以信息来研究系统功能,揭示事物的更深一层次的规律,帮助人们提高和掌握运用规律的能力。

经验总结法

经验总结法是通过对实践活动中的具体情况,进行归纳与分析,使之系统化、理论化,上升为经验的一种方法。总结推广先进经验是人类历史上长期运用的较为行之有效的领导方法之一。

描述性研究法

描述性研究法是一种简单的研究方法,它将已有的现象、规律和理论通过自己的理解和验证,给予叙述并解释出来。它是对各种理论的一般叙述,更多的是解释别人的论证,但在科学研究中是必不可少的。它能定向地提出问题,揭示弊端,描述现象,介绍经验,它有利于普及工作,它的实例很多,有带揭示性的多种情况的调查;有对实际问题的说明;也有对某些现状的看法等。

数学方法

数学方法就是在撇开研究对象的其他一切特性的情况下,用数学工具对研究对象进行一系列量的处理,从而作出正确的说明和判断,得到以数字形式表述的成果。科学研究的对象是质和量的统一体,它们的质和量是紧密联系,质变和量变是互相制约的。要达到真正的科学认识,不仅要研究质的规定性,还必须重视对它们的量进行考察和分析,以便更准确地认识研究对象的本质特性。数学方法主要有统计处理和模糊数学分析方法。

思维方法

思维方法是人们正确进行思维和准确表达思想的重要工具,在科学研究中最常用的科学思维方法包括归纳演绎、类比推理、抽象概括、思辩想象、分析综合等,它对于一切科学研究都具有普遍的指导意义。

系统科学方法

20世纪,系统论、控制论、信息论等横向科学的迅猛发展,为发展综合思维方式提供了有力的手段,使科学研究方法不断地完善。而以系统论方法、控制论方法和信息论方法为代表的系统科学方法,又为人类的科学认识提供了强有力的主观手段。它不仅突破了传统方法的局限性,而且深刻地改变了科学方法论的体系。这些新的方法,既可以作为经验方法,作为获得感性材料的方法来使用,也可以作为理论方法,作为分析感性材料上升到理性认识的方法来使用,而且作为后者的作用比前者更加明显。它们适用于科学认识的各个阶段,因此,我们称其为系统科学方法。

红外数据通信技术外文翻译文献

红外数据通信技术外文翻译文献(文档含中英文对照即英文原文和中文翻译) Infrared Remote Control System Abstract Red outside data correspondence the technique be currently within the scope of world drive extensive usage of a kind of wireless conjunction technique, drive numerous hardware and software platform support. Red outside the transceiver product have cost low, small scaled turn, the baud rate be quick, point to point SSL, be free from electromagnetism thousand Raos

etc. characteristics, can realization information at dissimilarity of the product fast, convenience, safely exchange and transmission, at short distance wireless deliver aspect to own very obvious of advantage. Along with red outside the data deliver a technique more and more mature, the cost descend, red outside the transceiver necessarily will get at the short distance communication realm more extensive of application. The purpose that design this system is transmit customer’s operation information with infrared rays for transmit media, then demodulate original signal with receive circuit. It use coding chip to modulate signal and use decoding chip to demodulate signal. The coding chip is PT2262 and decoding chip is PT2272. Both chips are made in Taiwan. Main work principle is that we provide to input the information for the PT2262 with coding keyboard. The input information was coded by PT2262 and loading to high frequent load wave whose frequent is 38 kHz, then modulate infrared transmit dioxide and radiate space outside when it attian enough power. The receive circuit receive the signal and demodulate original information. The original signal was decoded by PT2272, so as to drive some circuit to accomplish customer’s operation demand. Keywords: Infrared dray;Code;Decoding;LM386;Red outside transceiver 1 Introduction 1.1 research the background and significance Infrared Data Communication Technology is the world wide use of a wireless connection technology, by the many hardware and software platforms supported. Is a data through electrical pulses and infrared optical pulse switch between the wireless data transceiver technology.

通信工程专业英语翻译

通信工程专业英语翻译 JXTA is a crystallization by Sun company's chief scientist Bill Joy's more than twenty years of brewing."JXTA technology is a platform for Network programming and calculation.To solve the modern distribution calculation especially peer-to-peer (Peer to Peer, P2P) in the calculation of the problem".[1] JXTA research project,which will provide a new framework that make the user more convenient to access to connect on the Internet's personal computer resources, thus further expand Internet 's space. At the same time JXTA is also the Sun's "ONE Internet" strategic continuance, and will take a more positive attitude to compete with the .net strategy of Microsoft and Hailstorm plan . JXTA agreement defines a set of six agreement based on XML, the organization of node into node group, release and found some resources, communication and mutual monitoring provides standardized method.(Endpoint Routing Protocol,ERP) is used for node found routing.To send a message to other nodes, and through the potential firewall and connection.(Rendezvous Protocol,RVP) s used for the nodes in the group to spread information.(Peer Resolver Protocol,PRP) is Used to one or more points to send general inquiries, and receive the response of inquiries.

建筑类外文文献及中文翻译

forced concrete structure reinforced with an overviewRein Since the reform and opening up, with the national economy's rapid and sustained development of a reinforced concrete structure built, reinforced with the development of technology has been great. Therefore, to promote the use of advanced technology reinforced connecting to improve project quality and speed up the pace of construction, improve labor productivity, reduce costs, and is of great significance. Reinforced steel bars connecting technologies can be divided into two broad categories linking welding machinery and steel. There are six types of welding steel welding methods, and some apply to the prefabricated plant, and some apply to the construction site, some of both apply. There are three types of machinery commonly used reinforcement linking method primarily applicable to the construction site. Ways has its own characteristics and different application, and in the continuous development and improvement. In actual production, should be based on specific conditions of work, working environment and technical requirements, the choice of suitable methods to achieve the best overall efficiency. 1、steel mechanical link 1.1 radial squeeze link Will be a steel sleeve in two sets to the highly-reinforced Department with superhigh pressure hydraulic equipment (squeeze tongs) along steel sleeve radial squeeze steel casing, in squeezing out tongs squeeze pressure role of a steel sleeve plasticity deformation closely integrated with reinforced through reinforced steel sleeve and Wang Liang's Position will be two solid steel bars linked Characteristic: Connect intensity to be high, performance reliable, can bear high stress draw and pigeonhole the load and tired load repeatedly.

成本管理外文文献及翻译

成本管理外文文献 China's Enterprise Cost Management Analysis and Countermeasures Abstract: With the progress and China's traditional Cost Management model difficult to adapt to an increasingly competitive market environment. This paper exists in our country a number of Cost Management and finally put forward to address these issues a number of measures to strengthen Cost Management. Keywords:: Cost Management measures In a market economy conditions, as the global economic integration, the development of increasingly fierce market competition, corporate profit margins shrinking. In this case, the level of high and low business costs directly determines the size of an enterprise profitability and competitive strength. Therefore, strengthen enterprise Cost Management business has become an inevitable choice for the survival and development. First, the reality of China's Enterprise Cost Management Analysis Cost Management in our country after years of development, has made many achievements, but now faces a new environment, China's Cost Management has also exposed some new problems, mainly in the following aspects: (A) Cost Management concept behind the Chinese enterprises lag behind the concept of Cost Management in pervasive phenomenon, mainly in Cost Management of the scope, purpose and means from time to biased. Many enterprises will continue to limit the scope of Cost Management within the enterprise or even only the production process at the expense of other related companies and related fields cost behavior management. We supply side, for example. The supply side of the price of the product cost of doing business, one of the most important motives. As the supply side of the price of the product and its cost plus profit, so the supply side of price in the form of its own costs to the enterprise. However, some enterprises to the supply side too much rock bottom price, as their source of high profits, without considering each other's interests, resulting in supply-side to conceal their true costs, price increase in disguise. This increase in procurement costs, thereby increasing commodity costs, making goods less competitive. The purpose of Cost Management from the point of view, many enterprises confined to lower costs, but less from the perspective of cost-effectiveness of the effectiveness of the means of cost reduction mainly rely on savings, can not be cost-effective. In traditional Cost Management, Cost Management purposes has been reduced to cut costs, saving has become the basic means to reduce costs. From the perspective of Cost Management to analyze the Cost Management of this goal, not difficult to find cost-reduction is conditional and limits, and in some cases, control of costs, could lead to product quality and enterprise efficiency decline. In addition, the vast majority of enterprises in the overall concept of lack of Cost

通信工程项目毕业材料外文翻译

用于多跳认知无线电网络的分布式网络编码控制信道 Alfred Asterjadhi等著 1 前言 大多数电磁频谱由政府机构长期指定给公司或机构专门用于区域或国家地区。由于这种资源的静态分配,许可频谱的许多部分在许多时间和/或位置未使用或未被充分利用。另一方面,几种最近的无线技术在诸如IEEE802.11,蓝牙,Zigbee之类的非许可频段中运行,并且在一定程度上对WiMAX进行操作;这些技术已经看到这样的成功和扩散,他们正在访问的频谱- 主要是2.4 GHz ISM频段- 已经过度拥挤。为了为这些现有技术提供更多的频谱资源,并且允许替代和创新技术的潜在开发,最近已经提出允许被许可的设备(称为次要用户)访问那些许可的频谱资源,主要用户未被使用或零星地使用。这种方法通常被称为动态频谱接入(DSA),无线电设备发现和机会性利用未使用或未充分利用的频谱带的能力通常称为认知无线电(CR)技术。 DSA和CR最近都引起了无线通信和网络界的极大关注。通常设想两种主要应用。第一个是认知无线接入(CW A),根据该认知接入点,认知接入点负责识别未使用的许可频谱,并使用它来提供对次用户的接入。第二个应用是我们在这个技术中研究的应用,它是认知自组织网络(CAN),也就是使用 用于二级用户本身之间通信的无许可频谱,用于诸如点对点内容分发,环境监控,安全性等目的,灾难恢复情景通信,军事通信等等。 设计CAN系统比CW A有更多困难,主要有两个原因。第一是识别未使用的频谱。在CW A中,接入点的作用是连接到互联网,因此可以使用简单的策略来推断频谱可用性,例如查询频谱调节器在其地理位置的频谱可用性或直接与主用户协商频谱可用性或一些中间频谱经纪人另一方面,在CAN中,与频谱调节器或主要用户的缺乏直接通信需要二级用户能够使用检测技术自己识别未使用的频谱。第二个困难是辅助用户协调媒体访问目的。在CW A中存在接入点和通常所有二级用户直接与之通信(即,网络是单跳)的事实使得直接使用集中式媒体接入控制(MAC)解决方案,如时分多址(TDMA)或正交频分多址(OFDMA)。相反,预计CAN将跨越多跳,缺少集中控制器;而对于传统的单通道多跳自组织网络而言,这个问题的几个解决方案是已知的,因为假设我们处理允许设备访问的具有成

土木工程外文文献翻译

专业资料 学院: 专业:土木工程 姓名: 学号: 外文出处:Structural Systems to resist (用外文写) Lateral loads 附件:1.外文资料翻译译文;2.外文原文。

附件1:外文资料翻译译文 抗侧向荷载的结构体系 常用的结构体系 若已测出荷载量达数千万磅重,那么在高层建筑设计中就没有多少可以进行极其复杂的构思余地了。确实,较好的高层建筑普遍具有构思简单、表现明晰的特点。 这并不是说没有进行宏观构思的余地。实际上,正是因为有了这种宏观的构思,新奇的高层建筑体系才得以发展,可能更重要的是:几年以前才出现的一些新概念在今天的技术中已经变得平常了。 如果忽略一些与建筑材料密切相关的概念不谈,高层建筑里最为常用的结构体系便可分为如下几类: 1.抗弯矩框架。 2.支撑框架,包括偏心支撑框架。 3.剪力墙,包括钢板剪力墙。 4.筒中框架。 5.筒中筒结构。 6.核心交互结构。 7. 框格体系或束筒体系。 特别是由于最近趋向于更复杂的建筑形式,同时也需要增加刚度以抵抗几力和地震力,大多数高层建筑都具有由框架、支撑构架、剪力墙和相关体系相结合而构成的体系。而且,就较高的建筑物而言,大多数都是由交互式构件组成三维陈列。 将这些构件结合起来的方法正是高层建筑设计方法的本质。其结合方式需要在考虑环境、功能和费用后再发展,以便提供促使建筑发展达到新高度的有效结构。这并

不是说富于想象力的结构设计就能够创造出伟大建筑。正相反,有许多例优美的建筑仅得到结构工程师适当的支持就被创造出来了,然而,如果没有天赋甚厚的建筑师的创造力的指导,那么,得以发展的就只能是好的结构,并非是伟大的建筑。无论如何,要想创造出高层建筑真正非凡的设计,两者都需要最好的。 虽然在文献中通常可以见到有关这七种体系的全面性讨论,但是在这里还值得进一步讨论。设计方法的本质贯穿于整个讨论。设计方法的本质贯穿于整个讨论中。 抗弯矩框架 抗弯矩框架也许是低,中高度的建筑中常用的体系,它具有线性水平构件和垂直构件在接头处基本刚接之特点。这种框架用作独立的体系,或者和其他体系结合起来使用,以便提供所需要水平荷载抵抗力。对于较高的高层建筑,可能会发现该本系不宜作为独立体系,这是因为在侧向力的作用下难以调动足够的刚度。 我们可以利用STRESS,STRUDL 或者其他大量合适的计算机程序进行结构分析。所谓的门架法分析或悬臂法分析在当今的技术中无一席之地,由于柱梁节点固有柔性,并且由于初步设计应该力求突出体系的弱点,所以在初析中使用框架的中心距尺寸设计是司空惯的。当然,在设计的后期阶段,实际地评价结点的变形很有必要。 支撑框架 支撑框架实际上刚度比抗弯矩框架强,在高层建筑中也得到更广泛的应用。这种体系以其结点处铰接或则接的线性水平构件、垂直构件和斜撑构件而具特色,它通常与其他体系共同用于较高的建筑,并且作为一种独立的体系用在低、中高度的建筑中。

企业成本控制外文翻译文献

企业成本控制外文翻译文献(文档含英文原文和中文翻译)

译文: 在价值链的成本控制下减少费用和获得更多的利润 摘要: 根据基于价值链的成本管理理念和基于价值的重要因素是必要的。首先,必须有足够的资源,必须创造了有利的价值投资,同时还需要基于客户价值活动链,以确定他们的成本管理优势的价值链。其次,消耗的资源必须尽量减少,使最小的运营成本价值链和确保成本优势是基于最大商业价值或利润,这是一种成本控制系统内部整个视图的创建和供应的具实践,它也是一种成本控制制度基于价值链,包括足够的控制和必要的资源投资价值的观点,创建和保持消费的资源到合理的水平,具有价值的观点主要对象的第一个因素是构造有利的价值链,从创造顾客价值开始;第二个因素是加强有利的价值链,从供应或生产客户价值开始。因此它是一个新型的理念,去探索成本控制从整个视图的创建和供应的商品更盈利企业获得可持续的竞争优势。 关键词:成本控制,价值链,收益,支出,收入,成本会计 1、介绍 根据价值链理论,企业的目的是创造最大的顾客价值;和企业的竞争优势在于尽可能提供尽可能多的价值给他们的客户,作为低成本可能的。这要求企业必须首先考虑他们是否能为顾客创造价值,和然后考虑在很长一段时间内如何创造它。然而,竞争一直以“商品”(或“产品”)作为最直接的载体,因此,传统的成本控制方法主要集中在对“产品”和生产流程的过程。很显然,这不能解决企业的问题,企业是否或如何能为客户创造价值。换句话说,这至少不能从根本上解决它。 因此,企业必须首先投入足够的资源,以便他们能够创建客户值取向,然后提供它以最少的资源费用。所以在整个视图中对价值创造和提供整体的观点来控制成本,它可以为客户提供完美的动力和操作运行机制运行成本的控制,也可以从根本上彻底克服了传统的成本控制方法的缺点,解决了无法控制的创造和供应不足的真正价值。基于此,本文试图从创作的整体观讨论成本控制提供价值并探讨实现良性循环的策略,也就是说,“创造价值投资成本供应价值创造价值”。 2、成本及其控制的基于价值链理念 2.1基于价值链的成本观念 根据价值链理论,如果企业是要被客户接受,它必须创造和提供能满足其客户的价值。因此,成本(价值或资源支付费用)这不离为创造和提供顾客价值的活动,其活动的价值链。因此,我们应该从价值链角度看成本的重要。

5G无线通信网络中英文对照外文翻译文献

5G无线通信网络中英文对照外文翻译文献(文档含英文原文和中文翻译)

翻译: 5G无线通信网络的蜂窝结构和关键技术 摘要 第四代无线通信系统已经或者即将在许多国家部署。然而,随着无线移动设备和服务的激增,仍然有一些挑战尤其是4G所不能容纳的,例如像频谱危机和高能量消耗。无线系统设计师们面临着满足新型无线应用对高数据速率和机动性要求的持续性增长的需求,因此他们已经开始研究被期望于2020年后就能部署的第五代无线系统。在这篇文章里面,我们提出一个有内门和外门情景之分的潜在的蜂窝结构,并且讨论了多种可行性关于5G无线通信系统的技术,比如大量的MIMO技术,节能通信,认知的广播网络和可见光通信。面临潜在技术的未知挑战也被讨论了。 介绍 信息通信技术(ICT)创新合理的使用对世界经济的提高变得越来越重要。无线通信网络在全球ICT战略中也许是最挑剔的元素,并且支撑着很多其他的行业,它是世界上成长最快最有活力的行业之一。欧洲移动天文台(EMO)报道2010年移动通信业总计税收1740亿欧元,从而超过了航空航天业和制药业。无线技术的发展大大提高了人们在商业运作和社交功能方面通信和生活的能力无线移动通信的显著成就表现在技术创新的快速步伐。从1991年二代移动通信系统(2G)的初次登场到2001年三代系统(3G)的首次起飞,无线移动网络已经实现了从一个纯粹的技术系统到一个能承载大量多媒体内容网络的转变。4G无线系统被设计出来用来满足IMT-A技术使用IP面向所有服务的需求。在4G系统中,先进的无线接口被用于正交频分复用技术(OFDM),多输入多输出系统(MIMO)和链路自适应技术。4G无线网络可支持数据速率可达1Gb/s的低流度,比如流动局域无线访问,还有速率高达100M/s的高流速,例如像移动访问。LTE系统和它的延伸系统LTE-A,作为实用的4G系统已经在全球于最近期或不久的将来部署。 然而,每年仍然有戏剧性增长数量的用户支持移动宽频带系统。越来越多的

土木工程专业外文文献及翻译

( 二 〇 一 二 年 六 月 外文文献及翻译 题 目: About Buiding on the Structure Design 学生姓名: 学 院:土木工程学院 系 别:建筑工程系 专 业:土木工程(建筑工程方向) 班 级:土木08-4班 指导教师:

英文原文: Building construction concrete crack of prevention and processing Abstract The crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. Keyword:Concrete crack prevention processing Foreword Concrete's ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. function, tiny crack would continuously of expand with connect, end formation we can see without the

工程管理专业研究建设项目的工程造价大学毕业论文外文文献翻译及原文

毕业设计(论文) 外文文献翻译 文献、资料中文题目:研究建设项目的工程造价 文献、资料英文题目: 文献、资料来源: 文献、资料发表(出版)日期: 院(部): 专业:工程管理 班级: 姓名: 学号: 指导教师: 翻译日期: 2017.02.14

科技文献翻译 题目:研究建设项目的工程造价 研究建设项目的工程造价 摘要 在工程建设中,中国是拥有世界最大投资金额和具有最多建设项目的国家。它是一 项在建设项目管理上可以为广泛的工程管理人员进行有效的工程造价管理,并合理 确定和保证施工质量和工期的条件控制施工成本的重要课题。 在失去了中国建筑的投资和技术经济工程,分离的控制现状的基础上,通过建设成 本控制的基本理论为指导,探讨控制方法和施工成本的应用,阐述了存在的问题在 施工成本控制和对决心和施工成本的控制这些问题的影响,提出了建设成本控制应 体现在施工前期,整个施工过程中的成本控制,然后介绍了一些程序和应用价值工 程造价的方法在控制建设项目的所有阶段。 关键词:建设成本,成本控制,项目 1.研究的意义 在中国,现有的工程造价管理体系是20世纪50年代制定的,并在1980s.Traditional 施工成本管理方法改进是根据国家统一的配额,从原苏联引进的一种方法。它的特 点是建设成本的计划经济的管理方法,这决定了它无法适应当前市场经济的要求。 在中国传统建筑成本管理方法主要包括两个方面,即建设成本和施工成本控制方法 的测定方法。工程造价的确定传统的主要做法生搬硬套国家或地方统一的配额数量 来确定一个建设项目的成本。虽然这种方法已经历了20多年的改革,到现在为止,计划经济管理模式的影响仍然有已经存在在许多地区。我们传统的工程造价控制的

通信工程移动通信中英文对照外文翻译文献

中英文翻译 附件1:外文资料翻译译文 通用移动通信系统的回顾 1.1 UMTS网络架构 欧洲/日本的3G标准,被称为UMTS。 UMTS是一个在IMT-2000保护伞下的ITU-T 批准的许多标准之一。随着美国的CDMA2000标准的发展,它是目前占主导地位的标准,特别是运营商将cdmaOne部署为他们的2G技术。在写这本书时,日本是在3G 网络部署方面最先进的。三名现任运营商已经实施了三个不同的技术:J - PHONE 使用UMTS,KDDI拥有CDMA2000网络,最大的运营商NTT DoCoMo正在使用品牌的FOMA(自由多媒体接入)系统。 FOMA是基于原来的UMTS协议,而且更加的协调和标准化。 UMTS标准被定义为一个通过通用分组无线系统(GPRS)和全球演进的增强数据

技术(EDGE)从第二代GSM标准到UNTS的迁移,如图。这是一个广泛应用的基本原理,因为自2003年4月起,全球有超过847万GSM用户,占全球的移动用户数字的68%。重点是在保持尽可能多的GSM网络与新系统的操作。 我们现在在第三代(3G)的发展道路上,其中网络将支持所有类型的流量:语音,视频和数据,我们应该看到一个最终的爆炸在移动设备上的可用服务。此驱动技术是IP协议。现在,许多移动运营商在简称为2.5G的位置,伴随GPRS的部署,即将IP骨干网引入到移动核心网。在下图中,图2显示了一个在GPRS网络中的关键部件的概述,以及它是如何适应现有的GSM基础设施。 SGSN和GGSN之间的接口被称为Gn接口和使用GPRS隧道协议(GTP的,稍后讨论)。引进这种基础设施的首要原因是提供连接到外部分组网络如,Internet或企业Intranet。这使IP协议作为SGSN和GGSN之间的运输工具应用到网络。这使得数据服务,如移动设备上的电子邮件或浏览网页,用户被起诉基于数据流量,而不是时间连接基础上的数据量。3G网络和服务交付的主要标准是通用移动通信系统,或UMTS。首次部署的UMTS是发行'99架构,在下面的图3所示。 在这个网络中,主要的变化是在无线接入网络(RAN的)CDMA空中接口技术的引进,和在传输部分异步传输模式作为一种传输方式。这些变化已经引入,主要是为了支持在同一网络上的语音,视频和数据服务的运输。核心网络保持相对不变,主要是软件升级。然而,随着目前无线网络控制器使用IP与3G的GPRS业务支持节点进行通信,IP协议进一步应用到网络。 未来的进化步骤是第4版架构,如图4。在这里,GSM的核心被以语音IP技术为基础的IP网络基础设施取代。 海安的发展分为两个独立部分:媒体网关(MGW)和MSC服务器(MSS)的。这基本上是打破外连接的作用和连接控制。一个MSS可以处理多个MGW,使网络更具有扩展性。 因为现在有一些在3G网络的IP云,合并这些到一个IP或IP/ ATM骨干网是很有意义的(它很可能会提供两种选择运营商)。这使IP权利拓展到整个网络,一直到BTS(基站收发信台)。这被称为全IP网络,或推出五架构,如图五所示。在HLR/ VLR/VLR/EIR被推广和称为HLR的子系统(HSS)。 现在传统的电信交换的最后残余被删除,留下完全基于IP协议的网络运营,并

外文翻译通信工程英文的毕业设计论文

编号: 毕业设计(论文)外文翻译 (译文) 学院:信息与通信学院 专业:通信工程 学生姓名: 学号: 指导教师单位:信息与通信学院 姓名: 职称: 2014年 2 月9 日 Radio network planning process and methods for WCDMA Abstract This paper describes the system dimensioning and the radio network planning methodology for a third generation WCDMA system. The applicability of each method is demonstrated using examples of likely system scenarios. The challenges of

modeling the multiservice environment are described and the implications to the system performance simulations are introduced. Keywords: Telecommunication network planning, Mobile radio- communication, Code division multiple access, Wide band transmission, Multiple service network, Dimensioning, Simulator, Static model, Dynamic model, Cellular network. Resume(?) Contents I.Introduction II. Initial planning, system dimensioning III. Detailed planning process IV. Example dimensioning case and verification of dimensioning with static simulations V. Comparison of a static to a dynamic network simulator VI. Conclusion INTRODUCTION As the launch of third generation technology approaches, operators are forming strategies for the deployment of their networks. These strategies must be supported by realistic business plans both in terms of future service demand estimates and the requirement for investment in network infrastructure. Evaluating the requirement for network infrastructure can be achieved using system dimensioning tools capable of assessing both the radio access and the core network components. Having found an attractive business opportunity, system deployment must be preceded by careful network planning. The network planning tool must be capable of accurately modeling the system behaviour when loaded with the expected traffic profile. The third generation cellular systems will offer services well beyond the capabilities of today's networks. The traffic profile, as well as the radio access technology itself form the two most significant challenges when dimensioning and planning a WCDMA based third generation system. The traffic profile describes the mixture of services being used by the population of users. There are also specific system functionalities which must be modelled including fast power control and soft handover. In order to accurately predict the radio coverage the system eatures associated with WCDMA must be taken into account in the network modeling process. Especially the channel characterization, and interference control mechanisms in the case of any CDMA system must be considered. In WCDMA network multiple services co-exist. Different services (voice, data) have different processing gains, Eb/N0 performance and thus different receiver SNR requirements. In addition to those the WCDMA coverage depends on the load characterization, hand over parameterization, and power control effects. In current second generation systems' coverage planning processes the base station sensitivity is constant and the coverage threshold is the same for each base station. In the case of WCDMA the coverage threshold is dependent on the number of users and used bit rates in all cells, thus it

相关主题
文本预览
相关文档 最新文档