------------------------------------------------------------------- 计算项目: 降水计算 1

------------------------------------------------------------------- [原始条件]:

计算模型: 潜水完整井;基坑远离边界

水位降深 7.500(m)

过滤器半径 0.375(m)

水头高度 8.500(m)

渗透系数 35.000(m/d)

单井出水量 360.000(m3/d)

沉降计算经验系数 1.000

----------------------------------------

沉降影响深度内土层数:3

场区内丰水季节地下水埋深: 5.000(m)

层号层厚度(m) Es(MPa)

1 4.000 5.000

2 8.000 28.000

3 5.000 35.000

----------------------------------------

基坑轮廓线定位点数:8

定位点号坐标x(m) 坐标y(m)

1 420.578 357.129

2 515.742 355.441

3 519.539 571.531

4 411.469 573.148

5 409.758 474.531

6 414.883 461.809

7 414.141 427.301

8 418.703 400.180

----------------------------------------

降水井点数:27个(各井间距22.0米)

井点号坐标x(m) 坐标y(m) 抽水量(m3/d)

1 516.724 354.423 360.000

2 517.150 378.656 360.000

3 517.576 402.888 360.000

4 518.002 427.121 360.000

5 518.427 451.353 360.000

6 518.853 475.586 360.000

7 519.279 499.818 360.000

8 519.705 524.051 360.000

9 520.131 548.283 360.000

10 520.556 572.516 360.000

11 498.542 572.845 360.000

12 476.528 573.175 360.000

13 454.514 573.504 360.000

14 432.500 573.833 360.000

15 410.486 574.163 360.000

16 410.053 549.208 360.000

17 409.621 524.254 360.000

18 409.188 499.300 360.000

19 408.755 474.346 360.000

20 413.879 461.626 360.000

21 413.139 427.228 360.000

22 417.707 400.075 360.000

23 418.663 378.110 360.000

24 419.620 356.146 360.000

25 443.896 355.715 360.000

26 468.172 355.285 360.000

27 492.448 354.854 360.000

----------------------------------------

任意点降深计算公式采用:

基坑工程手册公式

沉降计算方法:

岩土工程勘察规范方法, 即不考虑应力随深度衰减的方法

----------------------------------------

[计算结果]:

1.基坑涌水量计算:

按《规范》附录F计算得:

根据《规范》F.0.7 确定降水影响半径 R = 258.723(m)

根据《规范》F.0.7 确定基坑等效半径 r0 = 84.472(m)

基坑涌水量 = 5595.100(m3/d)

2.降水井的数量计算:

按《规范》8.3.3计算得:

单井出水量按360.000(m3/d)计算,需要降水井的数量 = 18井

单井出水量按240.000(m3/d)计算,需要降水井的数量 = 26井

3.单井过滤器进水长度计算:

按《规范》8.3.6验算得:

单井过滤器进水长度 =6.000(m)

4.各点降深与地表沉降计算:

降深按《基坑工程手册》计算

按用户指定的井数(27)、井位、各井抽水量,计算得:

在指定范围内: 最小降深=0.010(m) 最大降深=8.500(m)

在指定范围内: 最小沉降=0.0(cm) 最大沉降=2.1(cm)

5.建筑物各角点降深与沉降计算:

选取人民医院住宅楼为计算模型,角点分布:

建筑物角点1: 降深=4.093(m) 沉降=1.309(cm)

建筑物角点2: 降深=8.500(m) 沉降=2.057(cm)

建筑物角点3: 降深=8.500(m) 沉降=2.057(cm)

建筑物角点4: 降深=4.230(m) 沉降=1.342(cm)

建筑物各角点: 最小降深=4.093(m) 最大降深=8.500(m)

建筑物各角点: 最小沉降=1.3(cm) 最大沉降=2.1(cm)

选取计算的住宅楼为砌体承重结构,建筑物长66.39米,宽10.2米,基础埋深约1.5米,地基土为一般粘性土和中密以上砂土,为中等压缩性土,建筑各角点之间最大倾斜率 = 千分之 0.137,小于《建筑地基与基础设计规范》

(GB50007-2011)规定的限值。

基坑降水计算

6.3 基坑降水方案设计 6.3.1 降水井型 选6型喷射井点:外管直径为200mm ,采用环形布置方案。 6.3.2 井点埋深 埋置深度须保证使地下水降到基坑底面以下,本工程案例取降到基坑面以下 1.0m 处。埋置深度可由下式确定: ()01x L H h h l i r h =++?+?++ (6.2) 式中: L —— 井点管的埋置深度()m ; H —— 基坑开挖深度()m ;这里12H m = h —— 井点管露出地面高度()m ,这里可取一般值 0.2m ; h ?—— 降水后地下水位至基坑底面的安全距离()m ,本次可取1.0m ; x i —— 降水漏斗曲线水力坡度,本次为环状,取0.1; 1h —— 井点管至基坑边线距离()m ,本次取1.0m ; 0r —— 基坑中心至基坑边线的距离()m ,本次工程案例去最近值宽边的一半,即40m ; l —— 滤管长度()m ,本次取1.0m 。 故带入公式可得埋置深度L 为: ()01120.2 1.00.1(1.040) 1.018.3x L H h h l m r i h =++?+?++=+++?++= 6.3.3 环形井点引用半径 采用“大井法”,参考规范,将矩形(本案例长宽比为2.5,小于10)基坑折算成半径为x 0的理想大圆井,按“大井法”计算涌水量,故本次基坑的引用半径: 4 0b a x +? =η (6.3) 式中:

,a b —— 基坑的长度和宽度()m ,200,80a m b m == η —— 系数,可参照下表格选取: 表6.1 系数η表 800.40200 b a == ,则 1.16η= 故带入公式可得本次基坑的引用半径0x 为: 020080 1.1681.244 a b m x η++=? =?= 6.3.4 井点抽水影响半径 由下列公式可求得抽水影响半径: m kt R H x w 220 + = (6.4) 式中: t —— 时间,自抽水时间算起(2-5昼夜) ()d ,本案例取5d ; k —— 土的渗透系数 (/)m d ,这里取平均值 2.7/k m d =; w H —— 含水层厚度()m ,本次取承压含水层厚度含水 层厚度④,⑤土层厚度的总和,即为 5.2611.2w H m =+=, m —— 土的给水度,按表 3.2确定,本次取圆砾

基坑变形监测技术方案设计

基坑变形监测技术方案 一、工程概况 本工程由一幢门字形酒店、六幢不同高度公寓和整体地下车库组成,总占地面积约30000m 2,总建筑面积约23 万m 2,地下建筑面积约8.7 万m 2。 本工程基坑总面积约29300m 2,东西向长约300~400m,南北方向长约40~110m。基坑总延长线为785m,地下室为三层,基坑开挖深度为-18.2m、-18.7m,管线分布复杂。基坑北侧紧邻海河,南侧是车流量较大的公路,海河水位的变化及张自忠路面动荷载的干扰都将是某基坑监测的难点。基坑监测等级为一级,监测手段众多,监测内容、监测工作量及监测难度均较大。 二、依据及原则 1. 《建筑变形测量规程》(JGJ/T8-97) 2. 《工程测量规范》(GB50026-93) 3. 《建筑基坑支护技术规程》JGJ120-99 4. 《国家一、二等水准测量规范》(GB12897-93) 5. 《天津市建筑地基基础设计规范》(TBJ1-88) 依据规范和天津市建设主管部门对建筑物基坑施工相关文件的要求,以及基坑设计的相关要求;为确保建筑物地下基坑施工及周边环境的安全性和可靠性,使在基坑开挖和施工期间的变形得到有效控制,保证其不对基坑自身及周边环境造成破坏性的影响,用科学的数据指导基坑信息化施工,保证施工安全。

三、基坑监测项目 为了及时收集、反馈和分析周围环境要素在施工中的变形信息,实现信息化施工并确保施工安全,综合本工程周边环境状况及围护结构和支护体系的特点,遵照设计的相关要求,本工程共进行如下几项基坑监测工作: 1、周边环境监测 A、地下管线变形监测; B、基坑外道路变形监测; C、基坑外地下潜水水位监测; D、基坑外承压水水位监测; E、基坑外土体水平位移(测斜)监测; F、基坑外土体表面变形监测; G、海河堤岸变形(沉降、变形)监测; 2、围护结构监测 A、围护桩桩体水平位移(测斜)监测; B、围护桩桩顶变形(沉降、位移)监测; C、围护桩内、外侧水土压力监测; D、围护桩的竖向钢筋应力监测; 3、支撑体系和立柱监测 A、支撑轴力监测; B、钢格构柱及立柱角钢应力监测; C、立柱位移和沉降监测;

管井降水计算

管井降水计算书 合肥市小仓房污水处理厂一期工程二标工程;属于结构;地上0层;地下0层;建筑高度:0m;标准层层高:0m ;总建筑面积:0平方米;总工期:180天;施工单位:安徽水安建设发展股份有限公司。 本工程由合肥市重点局投资建设,北京市政设计研究/合肥市政设计有限公司设计,合肥市勘察院地质勘察,浙江江南工程管理股份有限公司监理,安徽水安建设发展股份 有限公司组织施工;由邹总担任项目经理,邹总担任技术负责人。 工程说明:合肥市小仓房污水处理厂拟建于包河区大圩乡境内,繁华大道(规划道路)以北。一期日处理污水规模10万m3/d,总征地面积13、8ha,占地面积9、9ha,附属建筑面积2950m2,生产建筑面积6045、1m2。 本次工程主要包括进水泵房及粗格栅间、出水井、细格栅间、曝气沉沙池、砂水分离车间、污泥泵房、沉淀池、配水井、提升泵房、滤池设备间、紫外消毒渠道以及场内土方挖填、道路、排水管道等全部工作内容。 建筑物结构形式主要以钢筋砼框架为主,个别为砖混结构,部分构筑物主要为现浇钢筋砼整体结构。 拟建场地现主要为水田,地形较平坦,西部局部为藕塘及沟渠。实测地面高程8、60~12、62m,最大高差4、02m。根据现场地址情况,大部分构筑物地下软基采用水泥搅拌桩形成复合地基处理。 场地地下水类型主要有两类:一类分布于①层素填土中的上层滞水及②层淤泥质 粉质粘土、③层粘土中的孔隙水,水量与地势高低及填土厚度有较大关系,场地地下水较丰富,主要由大气降水、地表水渗入为主补给,无统一地下水位,排泄途径主要就是蒸发及渗入低洼处为主。水位标高8、60~10、53m。另一类为分布于⑥层粉土及⑦层粉土夹粉砂中的承压水,主要由地下径流渗透补给,与南淝河河水联系密切,其承压水头一般大于4m。 鉴于以上地质及水文情况,对于大部分深基坑部位均需要进行降、排水施工,以确保基坑边坡及构筑物自身的安全。 一、水文地质资料

基坑变形监测方案

本设计主要针对某深基坑工程施工过程中基坑变形及引起周边环境变形进行监测的方法及相关数据处理方案的设计与分析。主要监测内容对基坑壁进行水平位移监测和沉降监测;内支撑格构柱进行沉降监测;周边临近基坑受基坑影响的建筑物作沉降监测;周边建筑沉降超预警值后要求进行倾斜观测。采用监测方法为精密二等水准、极坐标法、投点法,并对其可行性进行做了精度分析。 关键字:沉降观测;水平位移观测;倾斜观测;二等水准;极坐标

Abtract This desig n is mai nly for a deep foun datio n pit duri ng the con struct ion of foun dati on pit deformatio n and cause the deformati on of the surro unding en vir onment monitoring methods and data processing program design and analysis.The main mon itori ng content of the foun dati on pit wall for mon itori ng horiz on tal displaceme nt and settlement monitoring;In support of lattice column for subsidence monitoring; near an excavation foundation pit surrounding by effect of buildings for subsidence monitoring;The surrounding building settlement of super early warning value requirements of the tilt observation.The monitoring method for precision two level, the polar coordinate method, points method,And its feasibility was made precision an alysis. Keyword: Horizontal displacement observation; settlement observation; tilt observati on; two level; polar coord in ates

基坑降水计算

基坑降水计算 1.降水影响半径 确定影响半径的方法很多,在矿坑涌水量计算中常用库萨金和吉哈尔特经验公式作近似计算。当设计的矿山进行了大降深群孔抽水试验或坑道放水试验时,为了推求较为准确的影响半径,可利用观测孔网资料为基础的图解法进行推求。 1.1、经验公式法 计算影响半径的主要经验公式见表1。 表1 计算影响半径的经验公式 1.2、图解法 当设计矿山做了大降深群孔抽水或坑道放水试验时,为了推求较为准确的影响半径,可利用观测孔实测资料,用图解法确定影响半径。 (一)自然数直角座标图解法 在直角座标上,将抽水孔与分布在同一直线上的各观测孔的同一时刻所测得的水位连结起来,尚曲线趋势延长,与抽水前的静止水位线相交,该交点至抽水孔的距离即为影响半径(见图1)。观测孔较多时,用图解法确定的影响半径较为准确。 (二)半对数座标图解法

在横座标用对数表示观测孔至抽水孔的距离,纵座标用自然数表示抽水主孔及观测孔水位降深的直角座标系中,将抽水主孔的稳定水位降深及同时刻的观测孔水位降低标绘在相应位置,连结这两点并延长与横座标的交点即为影响半径(见图2)。当有两个或两个以上观测孔时,以观测孔稳定水位降深绘图更准些。 1.3、影响半径经验数值 根据岩层性质、颗粒粒径及单位涌水量与影响半径的关系来确定影响半径,见表2与表3。 表2 松散岩土影响半径(R)经验数值 表3 单位涌水量与影响半径关系

2 计算模型及公式 2.1.潜水完整井计算模型 ()??? ? ?+-=01log 2366.1r R S S H k Q ……………………… …………………公式1 式中:Q 基坑涌水量(m 3/d ); k :渗透系数(m/d ); H :潜水含水层厚度(m ): S :基坑水位降深(m ); R :降水影响半径(m ); r 0:基坑等效半径(m )。 2.2.承压水完整井计算模型 ? ??? ? ?+=01lg 73.2r R MS k Q 式中:Q :K R :r 0:基坑(m ); M :承压含水层厚度(m ) 2.3.承压水非完整井计算模型 ??? ? ? ?+-+???? ??+=002.01lg 1lg 73.2r M l l M r R MS k Q ……………………………公式式中:Q :基坑涌水量(m 3/d ); K :渗透系数(m/d ); R :降水影响半径(m ); r 0:基坑等效半径(m ); M :承压含水层厚度(m ); S :基坑水位降深(m );

(整理)基坑降水设计

基坑降水设计 第一部分:井点降水计算的前提 1、所需水文地质资料 (1).水层性质——承压水、潜水; (2).含水层厚度H; (3).含水层的渗透系数K和影响半径R; (4).含水层的补给条件,地下水流动方向,水力梯度; (5).原有地下水埋藏深度,水位高度和水位动态变化资料; (6).井点系统的性质——完整井、非完整井。 2、了解建筑工程对降低地下水位的要求 (1).建筑工程的平面布置、范围大小,周围建筑物的分布和结构情况; (2).建筑物基础埋设深度、设计要求的水位下降深度; (3).由于井点排水引起土层压缩变形的允许范围和大小。 第二部分:基坑降水方法 一、明沟排水 (一)、明沟排水的适用条件 明沟排水是指在基坑内设置排水明沟或渗渠和集水井,然后用水泵将水抽出基坑外的降水方法。明沟排水(简称明排)一般适用于土层比较密实,坑壁较稳定,基坑较浅,降水深度不大,坑底不会产生流砂和管涌等的降水工程。当具备下列条件时,一般可以采用明沟排水方案。 (1)地质条件。场地为较密实的、分选好的土层,特别是带有一定胶结度或粘稠度的土层时,由于其渗透性低,渗流量较少,在地下水流出时,边坡仍稳定,即使在挖土方时,底部可能会出现短期翻浆或轻微变动,但对地基无损害,所以适宜明排;当地层土质为硬质粘土夹无水源补给的砂土透镜体或薄层时,由于在基坑开挖过程中,其所储存的少量水会很快流出而被疏干,有利于明诽;在岩石土质中施工时,一般均可以进行明排。 (2)水文条件。场地含水层为上层滞水或潜水,其补给水源较远,渗透性较弱,漏水量不大时,一般可以考虑采用明排随水。 (3)挖土方法。当采用拉铲挖斗机、反向铲和抓斗挖土机等机械挖土,为避免由于挖土过程中出现的临时浸泡而影响施工时,对含水层的砂、卵石.涌水量较大、具有一定阵水深度的降水工程,也可以采用明排降水。 (4)其他条件。当基坑边坡为缓坡或采用堵截隔水后的基坑时;建筑场地宽敞,邻近无建筑物时;基坑开挖面积大,有足够场地和施工时间时:建筑物为轻型地基荷载等条件下,采用明排降水的适用条件可以扩大。 明沟排水的抽水设备常用离心泵、潜水泵和污水泵等,以污水泵为好。 (二)、明沟排水工程的布置 随着基坑的开挖,当基坑深度接近地下水位时,沿基坑四周(基础轮廓线以外,基坑边缘坡脚0.3m内)设置排水沟或渗渠,在基坑四角或每隔30~40m设一直径为0.7~0.8m的集水井,沟底宽大于0.3m,坡度为0.5%—1.0%,沟底比基坑底低0.3~0.5m,集水井底比排水沟底低0.5~1.0m。集水井容积大小决定于排水沟的来水量和水泵的排水量,宜保证泵停抽后30分钟内基坑坑底不被地下水淹没。随着基坑的开挖,排水沟和集水井随之分级设置与加深,直到坑底达到设

基坑变形监测方案

摘要 本设计主要针对某深基坑工程施工过程中基坑变形及引起周边环境变形进行监测的方法及相关数据处理方案的设计与分析。主要监测内容对基坑壁进行水平位移监测和沉降监测;内支撑格构柱进行沉降监测;周边临近基坑受基坑影响的建筑物作沉降监测;周边建筑沉降超预警值后要求进行倾斜观测。采用监测方法为精密二等水准、极坐标法、投点法,并对其可行性进行做了精度分析。 关键字:沉降观测;水平位移观测;倾斜观测;二等水准;极坐标

Abtract This design is mainly for a deep foundation pit during the construction of foundation pit deformation and cause the deformation of the surrounding environment monitoring methods and data processing program design and analysis.The main monitoring content of the foundation pit wall for monitoring horizontal displacement and settlement monitoring;In support of lattice column for subsidence monitoring; near an excavation foundation pit surrounding by effect of buildings for subsidence monitoring;The surrounding building settlement of super early warning value requirements of the tilt observation.The monitoring method for precision two level, the polar coordinate method, points method,And its feasibility was made precision analysis. Keyword:Horizontal displacement observation; settlement observation; tilt observation; two level; polar coordinates

深基坑变形监测的常见方法及应用

深基坑变形监测的常见方法及应用 本文主要介绍了深基坑的变形监测,分析了深基坑边坡的水平位移和竖向位移的监测方法,阐释了基坑变形监测过程中遇到的各种情况及需要注意的问题。 标签:深基坑;基坑变形监测;水平位移;竖向位移 随着科技的发展和技术的进步,为了解决土地资源日渐减少与城市人口不断增长的矛盾,越来越多的小高层、高层甚至超高层建筑物应运而生。伴随着高层建筑的崛起,深基坑工程也日益发展起来,深基坑的安全问题已经成为基础施工的重中之重。因此深基坑的变形监测也具有更实际更重要的意义。 深基坑工程是指基坑开挖的深度值超过5米(含5米)的基坑(槽)的土方开挖、边坡支护以及降水工程,或者基坑开挖的深度值虽未超过5米,但其地质条件情况、周围环境情况以及地下管线情况等较为复杂,或影响相邻建(构)筑物安全的基坑(槽)的土方开挖、边坡支护以及降水工程。根据规范要求,开挖深度值超过5m、或者开挖深度值虽不超过5m但现场地质情况和周围环境较复杂的基坑工程均应实施基坑工程变形监测。 基坑监测是指在施工及使用期限内,对深基坑及周边环境实施的检查、监控工作。监测项目主要包括:水平位移监测、竖向位移监测、深层水平位移监测、倾斜监测、裂缝监测、支护结构内力监测、土压力监测、孔隙水压力监测、地下水位监测、锚杆拉力监测、周边已建建筑的沉降监测等。其中基坑边坡的水平位移和竖向位移监测是最常见的基坑变形监测项目,本文就以此二项监测为例做相应的介绍和分析。 1、基坑变形测置点的设置 变形测量点分为基准点、工作基点和变形监测点。 基准点作为该工程的基准和检核点,必须保证其稳定性,每个基坑工程至少应设置3个基准点。当基准点离所测建筑距离较远致使变形测量作业不方便时,宜在稳定的位置设置工作基点。基准点和工作基点应避开交通干道主路、地下管线、仓库推栈、水源地、河岸、松软填土、滑坡地段、机器震动区以及其他可能使标石、标志易遭腐蚀和破坏的地方,并应选设在变形影响范围以外且稳定、易于长期保存的地方。监测期间,应定期检查基准点和工作基点的稳定性。 基坑工程变形监测点是直接反应基坑变形情况的测量点。根据规范要求,基坑工程监测点的布置应最大程度地反映监测对象的实际状态及其变化趋势,并应满足监控要求。为了满足观测条件,应将点位沿基坑周边布置在边坡顶部,基坑周边中部、阳角处应布置监测点。监测点间距不宜大于20米,并应保证每条边坡上监测点数不少于3个。监测点宜采用1015cm长,直径20mm的钢筋,固定在边坡顶部,钢筋顶部刻十字花。

基坑变形监测水平位移测量的几种方法

基坑变形监测水平位移测量的几种方法 摘要:随着城市经济建设的快速发展,城市用地越来越紧张,使得城市发展不得不向上或向下发展,基坑开挖的深度越来越深。为了确保基坑支护的安全,不论是一、二、三级基坑,根据《建筑基坑工程监测技术规范》GB50497-2009的要求对基坑坡顶的水平位移都要求进行监测,现就当前基坑监测水平位移监测的几种方法进行探讨。 关键词:水平位移测量;视准线法;小角法;前方交会;后方交会;极坐标 Abstract: With the rapid development of the city’s economic construction, urban land is more and more tense, which makes the urban development had to go upward or downward, such as the deeper and deeper excavation of foundation pit. In order to ensure the safety of the excavation support system, no matter the primary, secondary, or third pit, according to the requirements of Building Foundation Pit Project Monitoring Technical Regulation GB50497-2009, the horizontal displacement of the pit top are required to be monitored. Hereby, this paper will expounds the several methods for the current horizontal displacement monitoring. Key words: horizontal displacement measurement; collimation line measurement; small-angle measurement; forward intersection; resection; polar coordinates 视准线法 视准线法,主要应用在场地比较开阔,基坑比较规整的长方形或正方形基坑。 (1)基准点的布设:在基坑的四个边上分别布设一对基准点。基准点应离开基坑的距离不小于开挖深度的3倍。一对基准点应与被监测点基本在一条直线上,误差不大于5cm。见附图: (2)观测方法:在一个基准点架设仪器,另一个基准点定向。利用经纬仪或激光准直仪直接观测一个强制对中装置的觇牌上的标尺读数。根据精度要求观测多个测回,求平均数计算位移增量,计算基坑坡顶监测点的本次位移量及累计位移量。 视准线法的优点和缺点:优点是观测数据直观,对仪器精度要求不高,方法简便。缺点是受场地影响较大,只适用于规则的基坑,幷且距离不宜太远。 2.小角度法:

管井降水计算书

管井降水计算书 一、水文地质资料 二、计算依据及参考资料 该计算书计算主要依据为国家行业标准《建筑基坑支护技术规范》(JGJ 120-99),同时参阅了《建筑施工手册》(第四版)和姚天强等编写的《基坑降水手册》。 三、计算过程 1、基坑总涌水量计算: 根据基坑边界条件选用以下公式计算: 基坑降水示意图 Q=(2H-S)*S/(lgR-lgr0) Q为基坑涌水量; k为渗透系数(m/d):取综合渗透系数10m/d H为含水层厚度(m):主要为细砂层以上取 R为降水井影响半径(m):根据施工经验取15m r 0为基坑范围的引用半径(m):r =(r1+r2r+r3+r4+…+rn)1/n 降水干扰井 群分别至基坑中心点的距离; S为基坑水位降深(m):

D为基坑开挖深度(m):取 d 为地下静水位埋深(m):取 w sw为基坑中心处水位与基坑设计开挖面的距离(m):取 通过以上计算可得基坑总涌水量为2672m3。 2、降水井深度确定: 降水井深度按下式: H W =H1+ H2 + H3 + H4 + H5 + H6 H W—降水井深度(m); H1—基坑深度(m);(取) H2—降水水位距离基坑底要求的深度(m);(取) H3—iy0;i为水力坡度,在降水井分布范围内宜为1/10—1/15,y0为降水井分布范围内基坑等效半径;(计算得,取) H1—降水期间水位变幅(m);(取) H2—降水井过滤器工作长度(m);(取) H W—沉砂管工作长度(m);(取) 根据上式计算得:降水井深度为 3、降水井数量确定: 单井出水量计算: q = (l′d)/a*24 降水井数量计算: q为单井允许最大进水量(m3/d); d为过滤器外径(mm):取400mm l′为过滤器进水部分长度(m)(过滤器进水部分有效长度取); a为与含水层渗透系数有关的经验系数(根据渗透系数5—15m/d,含水层厚度≤20m,取100)

基坑降水设计计算1

锦绣东方二期 基 坑 降 水 方 四川中恒建筑工程有限公司 二0 年五月

案 锦绣东方二期 基坑降水方案 审批: 四川中恒建筑工程有限公司 二0 年五月

审核: 编制: 四川中恒建筑工程有限公司二0 年五月

1工程概况 2场地工程地质条件3降水设计 4降水井施工 5施工组织 6质量、安全保证措施7降水维护措施 8工作量 9降水井平面布置图10沉降观测点 11井深结构图 12降水管道布置图 13沉沙池结构图

1工程概况: 拟建物场地位于成都市成华区府清路东六街。场地周边东邻近电子科技大学东院宿舍区、北侧邻近电子科技大学附小,南侧为已建道路府青路东六街,西侧为规划待建道路。 2场地工程地质条件 拟建场地属成都平原岷江水系u级阶地。地形平坦。场地范围内地层主要由第四系全新统杂填土,素填土、粉质粘土、粉土、中砂、卵层组成。场地地下水为埋藏于砂卵石中的孔隙性潜水,河水及大气降水为其主要补给来源。根据岩土工程勘察报告及成都市降水经验,本工程适合井点降水。本工程含水层渗透系数取20.00米/天,地下静止水位埋深按4.50米考虑。 3降水设计 3.1.1设计依据 《建筑与市政降水工程技术规范》(JGJ/T111-98) 《供水管井技术规范》(GB 50296-99) 《建筑基坑工程技术规范》(JGJ 120-99) “府青惠园”岩土工程勘察报告》 “府青惠园”总平面图》 3.1.2参数选择 根据工程勘察资料,降水计算的参数取值如下: 地下静止水位埋深按4.50米考虑,基坑开挖深度按11.50m考虑,电梯井开挖深度为13.00m,基坑采用人工挖孔桩支护的区段,挖孔桩开挖深度为16.00m, 故考虑将地下水降至挖孔桩底以下,即将地下水位降至17.00m;渗透系数k,由于涌水量计算只考滤卵石土层,渗透系数即卵石土层系数,根据地勘报告,取k =20.00m/d; 3.2降水计算 3.2.1基坑涌水量计算:

基坑变形监测方案

佳·5.4克拉项目 基坑变形监测方案 编制: 甘肃统建建筑装饰工程集团有限公司 佳·5.4克拉项目部 二○一七年九月二十日

目录 一、编制依据 (1) 二、工程概况 (1) (一)工程简介 (1) (二)地层岩性 (1) (三)气象 (2) (四)地下水 (2) 三、施工部署 (3) (一)人员部署 (3) (二)监测管理程序 (3) (三)测量检测部署 (3) 四、深基坑监测要求 (3) (一)监测要求 (3) (二)、监测过程控制要求 (4) (三)、监测数据结果的要求 (4) 五、监测方法 (4) (一)监测仪器及要求 (5) (二)巡视检查 (5) (三)监测点的布置 (5) 六、监测期和监测频率 (5) 七、监测报警及异常情况下的监测措施 (6) 八、资料整理和分析反馈 (6) 九、作业安全及其它注意事项 (6) 十、雨季施工技术措施 (6) 十一、应急预案 (7) (一)应急救援部署 (7) (二)突发事件风险分析及预防 (8) 附图一:基坑监测点平面布置图

一、编制依据 1、佳·5.4克拉基坑开挖图; 2、佳·5.4克拉岩土工程勘察报告; 3、兰州理工大学建筑勘察设计院《佳·5.4克拉项目基坑支护结构设计》《佳·5.4克拉项目基坑降水设计》; 4、《工程测量规范》GB50026-2007; 5、《建筑工程施工质量验收统一标准》GB50300-2013; 6、《湿陷性黄土地区建筑基坑工程安全技术规程》JGJ167-2009; 7、《建筑基坑工程检测技术规范》GB50497-2009; 8、《建筑变形测量规范》JGJ8-2007; 9、基坑监测强制性条文。 二、工程概况 (一)工程简介 工程名称:佳·5.4克拉。 工程地点:拟建场地位于甘肃省天水市秦州区吴家崖村,场地北邻吴家崖村田地。东侧为吴家崖村,南临山水嘉园1#地块,西临佳·水岸华庭C地块。拟建场地近南北宽约59.3m-82.7m,东西长约48.7m-118.5m。 本工程±0.000绝对标高为1198.000。地下二层,地上A塔十八层,B塔十五层,商铺为地上三层。结构形式主楼为剪力墙结构,裙楼为框架结构。本工程基础采用筏板,东塔筏板厚度为1800mm,开挖深度为11.77m;西塔筏板厚度为1 500mm,开挖深度为11.47m,,商铺为300厚的防水板,开挖深度为10.27m。 本基坑安全级别属于一级基坑。 (二)地层岩性 在勘察深度范围内,拟建场地地层自上而下依次分布为: ①粉质粘土(Q4al):该层分布于整个勘察场地,属第四系冲积产物;黄褐色,坚硬-硬塑;土质均匀,含少量植物根系和少量泥岩碎屑,孔隙较发育,有光泽,无瑶震反应,干强度中等,韧性一般,层厚为1.50~23.20m,层面标高 1195.19m~1214.05m。

基坑降水支护方案设计

目录 第一章工程概况 (2) 第二章基坑降水、支护方案设计 (2) 第1节设计依据 (2) 第2节基坑降水方案的设计 (3) 第3节基坑支护方案的设计 (4) 第三章施工总体布署 (6) 第1节施工程序及进度(各工序的综合协调) (6) 第四章基坑降水工程 (15) 第五章基坑支护工程 (17) 第六章土方挖运工程 (20) 第七章质量保证措施 (22) 第八章安全生产与文明施工 (31) 第九章雨期施工措施 (34)

第一章工程概况 、工程概况该工程为文莱驻华大使馆,位于北京市朝阳区亮马桥第三使馆区内,基底埋深为5m局部电梯井6m。 二、工程及水文地质条件(参考附近的马来西亚驻华使馆地质勘察资料) (一)工程地质条件拟建场地位于北京市朝阳区亮马桥路北侧第三使馆区内,地形平坦。根据钻探结果,拟建场地在15m勘探深度内的地质构成为: 地表为人工填土,以下为第四纪冲击层,自上而下分述如下: 1.杂填土: 本层厚度0.50? 2.70m,层底标咼34.8437.57m。 2.素填土: 本层厚度0.40?1.80m,层底标咼3 3.9436.83m。 3.质黏土: 本层厚度9.60?10.80m,层底标高26.12?27.53m。(二)工程水文地质情况 1999年12月上旬勘探时,遇到两层地下水,第一层为上层滞水,静止水位埋深 0.80?3.20m (相应于标高34.90?36.06m);第二层为潜水,静止水位埋深14.00m (相应于 标高24.22m)。近年最高地下水位标高为36.00m左右(上层滞水)。 第二章基坑降水、支护方案设计 第1节设计依据

、该工程的《岩土工程勘察报告》及部分设计图纸 二、《建筑基坑支护技 三、《建筑地基与基础 四、《混凝土结构设计术规程》(JGJ 120-99) 设计规范》(GB50007-2002) 规范》(GB50010-2002)

(完整版)深基坑监测方案

************工程 基坑变形监测方案 编制人: 审批人: 施工单位:********************** 2014年10月17日

目录 1、工程概况 (1) 2、监测目的及要求 (1) 3、编制依据 (2) 4、工程地质概要 (2) 5、监测内容 (3) 6、监测频率 (7) 7、测量主要仪器设备 (9) 8、监测工作管理保证监测质量的措施 (9) 9、监测人员配备 (14) 10、监测资料的提交 (14)

基坑变形监测方案 1、工程概况: 1、工程名称:*************** 2、工程地点:***************。 3、建设单位:**************** 4、设计单位:**************** 5、勘察单位:**************** 6、监理单位:***************** 7、施工单位:***************** 8、结构形式:***************** 深基坑支护采用如下方案: 1.1 基坑支护方案 本工程基坑东侧采用钢筋砼排桩支护,北侧采用锚杆加土钉墙支护(详见专项施工方案)。 2、监测目的及要求 2.1.监测目的 在深基坑开挖的施工过程中,基坑内外的土体由原来的静止土压力状态向主动力土压力状态转变,应力状态的改变引起的变形,即使采取支护措施,一定数量的变形总是难以避免的。这些变形包括:深基坑坑内土体的隆起,基坑支护结构以及周围土体的沉降和侧向位移。无论那种位移的量超出了某种容许的范围,都将对基坑支护结构造成危害。因

此,在深基坑施工过程中,只有对基坑支护结构、基坑周围的土体进行综合、系统的监测,才能对工程情况有全面的了解。确保工程顺利进行。 2.2.深基坑工程监测的要求 在深基坑开挖与支护工程中,为满足支护结构及被护土体的稳定性,首先要防止破坏或极限状态发生。破坏或极限状态主要表现为静力平行的丧失,或支护结构的构造产生破坏。在破坏前,往往会在基坑侧向的不同部位上出现较多的变形或变形速率明显增大。支护结构物和被支护土体的过大位移将引起邻近建筑物的倾斜和开裂。如果进行周密的监测控制,无疑有利于采取应急措施,在很大程度上避免或减轻破坏的后果。 3、编制依据: 3.1《建筑基坑工程变形技术规范》(GB50497-2009) 3.2《城市测量规范》(CJJ8-99) 3.3《精密水准测量规范》(GB/T15314-940) 3.4《工程测量规范》(GB 50026-93) 3.5《建筑边坡工程技术规范》(GB50330-2007) 3.6 《建筑基坑支护技术技术规程》(JGJ120-99) 4、工程地质概要: 4.1本基坑地下水属潜水类型,其主要补给来源为大气降水。 4.2拟建场地浅层土层成份复杂,基坑工程正式施工前应对场地内的障碍物作进一步查明并给予清除,以确保围护体和坑内加固等正常施

降水计算说明书

XX项目 基坑降水计算说明书 一、基本条件 XX基坑深度从建筑正负零到基坑底深度5.45m,基坑降水井轴线所围区域近似为梯形,长边最长约200m,短边最宽约160m,基坑周长约640m,降水面积约26600m2。 场地为Ⅰ级阶地,场地地层主要为场区内地基土自上而下依次为:(Q4ml)①杂填土、(Q4ai+pl)②含砂粉质黏土、③细砂、④圆砾、⑤卵石、⑥圆砾混黏性土、(γ52)⑦~⑨花岗岩。场地地层的典型剖面如图。 图:场地地层典型剖面 根据本工程《岩土工程勘察报告》,场地地下水属孔隙潜水类型,具有微承压性质,主要埋藏于③~④层中。地下水主要接受大气降水及侧向径流补给,并以蒸发及地下径流方式排泄。地下水位受季节影响,每年6~9月为丰水期,12月至翌年3月为枯水期,年变化幅度1.00m左右。勘察期间(1月初)为枯水期;地下水稳定水位埋深3.20~5.10m,平均稳定水位3.90m,高程184.49~185.57m,平均高程185.40m。 根据当地经验,粉质黏土的渗透系数经验值K=0.2-0.4m/d;细砂层的渗透系数为经验值K=1-3m/d;圆砾层的渗透系数为经验值K=60-80m/d;卵石层的渗透

系数为经验值k=80-100m/d ;粉质黏土混圆砾层的渗透系数为经验值k=5-10m/d ;花岗岩(全风化)层的渗透系数为经验值k=4-6m/d 。根据勘察单位的潜水完整井抽水试验,建议混合含水层渗透系数K=70m/d 。本工程降水含水层主要为砂层及圆砾,取混合含水层渗透系数k=70m/d 。 二、降水目的 基坑开挖深度内存在地下水,为保证地下室基础施工的质量及安全,需将地下水降至基础底板下1.0m 。 三、降水参数选取 ①渗透系数k 本工程降水含水层主要为砂层及圆砾,取混合含水层渗透系数k=70m/d 。 ②降水影响半径R 降水影响半径宜通过试验确定,本工程依据《吉林市万达广场(A1大商业)地块补充水文地质勘察报告》(中国市政工程东北设计研究总院,2014.10),降水影响半径R=340m 。 ③潜水含水层厚度H 根据《本工程岩土勘察报告》,含水层厚度12-14m 。本工程取H=12m 。 ④基坑等效半径r 0 基坑圆形概化的等效半径r 0,概化为圆形基坑,其等效半径按下列规定计算: 矩形基坑等效半径m A r 9214 .3266000=== π ⑤地下水设计降深s d 本工程场地勘察时地下水平均稳定水位标高185.40m ,基坑底标高184.10m ,则水位降深m m m m s d 30.20.110.18440.185=+-= 四、基坑涌水量计算 本地块井点降水按潜水非完整井计算基坑涌水量,计算公式如下:

轻型井点降水设计计算例题(材料特制)

轻型井点系统设计计算示例 某多层厂房地下室呈凹字形,其平面尺寸如图1-76所示,基础底面标高为-4.5m,电梯井部分深达-5.30m,天然地面标高为-0.40m。根据地质勘测资料:标高在-1.40m以上为亚粘土,再往下为粉砂土,地下水静水位在-1.80m处,土的渗透系数为5m/d。基坑边坡采用1∶0.5,为施工方便,坑底开挖平面尺寸比设计平面尺寸每边放出0.5m。 图1—76 某地下室现场 根据本工程基坑的平面形状和深度,轻型井点选用环形布置并在凹字形中间插入一排井点,如图1-77所示。 井点管的直径选用50mm,布置时距坑壁取1.0m,其所需的埋置深度(从地面算至滤管顶部)用(公式1-54)计算,则至少为: (4.5-0.4)+0.5+17.5×0.1=6.34m 由于考虑轻型井点降水深度一般以6m为宜及现有井点管标准长度为6m,因此将总管 埋设在地面下0.6m处即先挖0.6m深的沟槽,然后在槽底铺设总管。此时井点管所需的长度: 6.34-0.6+0.20(露出槽底高度)=5.91(m),(小于6.0,可满足要求)。 电梯井处的基坑深度比其他部分要深0.8m ,所以该处井点管长度改用7m。

井点管的间距,考虑粉砂土的渗透系数不大,初步选用1.6m 。 总管的直径选用127mm ,长度根据图布置方式算得: 2(67.6+2×1.0)+(46.4+2×1.0)+(46.4-2×1.8-2×1.0) = 276.2 (m) 抽水设备根据总管长度选用三套,其布置位置与总管的划分范围如图所示。 图1—36 某工程基坑轻型井点系统布置 a )平面布置图(1、2、3—三套抽水设备编号、同时表示挖土时情况); b )高程布置图 现将以上初步布置核算如下。 1)涌水量计算 按无压不完整井考虑,由于凹字形中间插有一排井点,分为两半计算:含水层的有效深度H0按表1-9求出: ,所以 m H (99.10)00.194.4(85.10=+=) 基坑中心的降水深度)(2.35.08.15.4m s =+-= 83.00 .194.494 .41' / =+=+s s

基坑变形监测方案 (1)

佳·克拉项目 基坑变形监测方案 编制: 甘肃统建建筑装饰工程集团有限公司 佳·克拉项目部 二○一七年九月二十日

目录

附图一:基坑监测点平面布置图

一、编制依据 1、佳·克拉基坑开挖图; 2、佳·克拉岩土工程勘察报告; 3、兰州理工大学建筑勘察设计院《佳·克拉项目基坑支护结构设计》《佳·克拉项目基坑降水设计》; 4、《工程测量规范》GB50026-2007; 5、《建筑工程施工质量验收统一标准》GB50300-2013; 6、《湿陷性黄土地区建筑基坑工程安全技术规程》JGJ167-2009; 7、《建筑基坑工程检测技术规范》GB50497-2009; 8、《建筑变形测量规范》JGJ8-2007; 9、基坑监测强制性条文。 二、工程概况 (一)工程简介 工程名称:佳·克拉。 工程地点:拟建场地位于甘肃省天水市秦州区吴家崖村,场地北邻吴家崖村田地。东侧为吴家崖村,南临山水嘉园1#地块,西临佳·水岸华庭C地块。拟建场地近南北宽约,东西长约。 本工程±绝对标高为。地下二层,地上A塔十八层,B塔十五层,商铺为地上三层。结构形式主楼为剪力墙结构,裙楼为框架结构。本工程基础采用筏板,东塔筏板厚度为1800mm,开挖深度为;西塔筏板厚度为1500mm,开挖深度为,,商铺为300厚的防水板,开挖深度为。 本基坑安全级别属于一级基坑。

(二)地层岩性 在勘察深度范围内,拟建场地地层自上而下依次分布为: al):该层分布于整个勘察场地,属第四系冲积产物;黄褐色,坚硬-硬塑; ①粉质粘土(Q 4 土质均匀,含少量植物根系和少量泥岩碎屑,孔隙较发育,有光泽,无瑶震反应,干强度中等,韧性一般,层厚为~,层面标高~。 al+pl):该层除区域缺失外,基本分布于整个勘察场地,冲、洪积成因,青灰色, ②圆砾(Q 4 重型动力触探试验修正值=~击,中密-密实,接触排列,磨圆度较好,颗粒形状呈圆状-亚圆状,级配较好,颗粒间充填物以中粗砂为主,含少量粉土,骨架颗粒成分主要为变质岩、石英岩和花岗岩等,中风化,圆砾一般粒径为~,偶含卵石及漂石。层面埋深~,厚度~,层面标高~。 ③强风化泥岩(N):该层分布于整个场地,半成岩,褐红色-灰绿色,微裂隙及风华裂隙较发育,中密-密实,矿物成分以蒙脱石、绿泥石,高岭石、白云母等为主,泥钙质胶结,碎屑结构,中厚层状构造,岩芯呈短柱状,具有遇水易软化的特点,强风化泥岩岩体基本质量等级Ⅴ级。层面埋深~,厚度~,层面标高~。 ④中风化泥岩(N):该层分布整个场地,半成岩,褐红色-灰绿色,见微裂隙,致密;矿物成分以蒙脱石、绿泥石、高岭石、白云母、长石、石英等为主,泥钙质胶结,碎屑结构,巨厚层状构造,岩芯呈短桩状,具有遇水易软化的特点,未经扰动时坚硬,岩体基本质量等级为Ⅳ级。层面埋深~,勘察厚度~(未揭穿),层面标高~。 (三)气象 天水市气候类型属暖温带轻冰冻中湿区,据天气气象局资料,本区多年平均气温℃,极端最高气温℃,极端最低气温℃,历年最冷月相对湿度平均62%,最热月平均湿度73%,年最大降水量,降水多集中在7、8、9月份,多暴雨,夏季多东北风,夏季平均风速s,冬季多东风,冬季平均风速s,30年遇最大风速s,年雷暴日天,年沙暴日天,年雾日数天,历年最大积雪厚度15cm,地表有季节性冻土,标准冻土深度,场地内无地表水。 (四)地下水 根据区域水文地质资料和勘察结果,拟建场地地下水为第四系松散岩类孔隙潜水,②圆砾

基坑变形监测技术方案

基坑变形监测方案2007-11 基坑变形监测技术方案 一、工程概况 本工程由一幢门字形酒店、六幢不同高度公寓和整体地下车库组成,总占地面积约30000m2,总建筑面积约23万m2,地下建筑面积约8.7万m2。 本工程基坑总面积约29300m2,东西向长约300~400m,南北方向长约40~110m。基坑总延长线为785m,地下室为三层,基坑开挖深度为-18.2m、-18.7m,管线分布复杂。基坑北侧紧邻海河,南侧是车流量较大的公路,海河水位的变化及张自忠路面动荷载的干扰都将是某基坑监测的难点。基坑监测等级为一级,监测手段众多,监测内容、监测工作量及监测难度均较大。 二、依据及原则 1.《建筑变形测量规程》(JGJ/T8-97) 2.《工程测量规范》(GB50026-93) 3.《建筑基坑支护技术规程》JGJ120-99 4.《国家一、二等水准测量规范》(GB12897-93) 5.《天津市建筑地基基础设计规范》(TBJ1-88) 依据规范和天津市建设主管部门对建筑物基坑施工相关文件的要求,以及基坑设计的相关要求;为确保建筑物地下基坑施工及周边环境的安全性和可靠性,使在基坑开挖和施工期间的变形得到有效控制,保证其不对基坑自身及周边环境造成破坏性的影响,用科学的数据指导基坑信息化施工,保证施工安全。

三、基坑监测项目 为了及时收集、反馈和分析周围环境要素在施工中的变形信息,实现信息化施工并确保施工安全,综合本工程周边环境状况及围护结构和支护体系的特点,遵照设计的相关要求,本工程共进行如下几项基坑监测工作: 1、周边环境监测 A、地下管线变形监测; B、基坑外道路变形监测; C、基坑外地下潜水水位监测; D、基坑外承压水水位监测; E、基坑外土体水平位移(测斜)监测; F、基坑外土体表面变形监测; G、海河堤岸变形(沉降、变形)监测; 2、围护结构监测 A、围护桩桩体水平位移(测斜)监测; B、围护桩桩顶变形(沉降、位移)监测; C、围护桩内、外侧水土压力监测; D、围护桩的竖向钢筋应力监测; 3、支撑体系和立柱监测 A、支撑轴力监测; B、钢格构柱及立柱角钢应力监测; C、立柱位移和沉降监测;