周转材料用量计划计算公式xls

周转材料用量计划计算公式xls
周转材料用量计划计算公式xls

户型数量m2/栋长杆m 小横杆m(按1.8m计算)直角扣件(个)

9.120(10)

31618629.532607.8256132.344200.6

总计86295.326078.2561323.4t 331.905100.3009629.150(14)

36479956.313008.7757075.185384.34

139********.8599052.52t 536.109162.0109624.120(38栋

14483953.0471466.452809.121965.68

t 909.57274.870962168054.44先开3套型10栋(t)241.3672.9404.150(31栋

16434485.391355.4753187.422379.4813904742019.72598810.02

t 534.797161.614327

先开10栋(t)172.51552.133653831874.2

188625

长杆小横杆直角扣件(个)

总计(93)t 2312.38698.797212427240.38

前44栋

m 3353831014886.13

t 1289.943903.40817192250.12

总前期

模板(木) 170650106370106370

钢管7300.764889.044889.04

扣件794330880800605680

4M木方514003330021900

3M木方705004500029000

支撑

型号 4.120 4.1509.120

栋数383110

一层面积491.25594.87466.73

周材钢管(kg)1965023794.837338.4

周材钢管(t)19.6523.7937.34

39.347.589674.6768

外架

型号 4.120 4.1509.120

面积144816433161

每层外架面积362410.75351.22

长杆988.261121.3475958.8306

短杆358.38406.6425347.7078外脚手架他人算(模板)

每层外架钢管长度m

长杆

3.801

4.313 3.688短杆

1.378 1.564 1.337直角

702.28796.855681.3668对接

199.1225.9125193.171旋转

61.5469.827559.7074脚手板 m2

72.482.1570.2448栋9层120内架

298.7072

165.74372.92

1964.33597.414砖混投入

361.811899.410

180.905

707.400

372.916

723.683砖混投入

403.53259.501

201.766398.409

626.214

393.000

207.175

765.773

417.439551.139

208.719-407.773

957.216

231.911

每层外架扣件(个)每层外架钢管重量t

对接扣件(个)旋转扣件(个)底座脚手板m2经验钢管:372m/m2 1738.55537.37221.27632.2

17385.55373.72212.76322

84082.6

2005.85619.99218.82729.45276.18

28081.98679.863063.4810211.6

796.4246.1686.88289.6

47644.314726.425197.5617325.2

0000

903.65279.3198.58328.6

28013.158658.613055.9810186.6

9036.52793.1985.83286

对接扣件(个)旋转扣件(个)底座脚手板m2

121124.8537438.5944045.4

585803.82

54503.916846.666261.9819819.6

总前期

9706068990

43893049.52

794330627680

自算303002305018厚模板53889.66667 412503050012厚模板180311.1667

9.15016513.72

14

598.26

47860.84月剩栋框架内架

47.86765.7728

95.7216

框架总外架16栋框架外架

框架总内架

9.1501182.78144730.518152086.8704

3647第一次砖混剩余

405.22168.89185

1106.2506第一次砖混撑与架

401.1678

4.255

1.543外架框架扣件第一次砖混外架及内架剩余3717.203

786.1268160374.989168.89185

222.87145467.136第二次砖混外架及内架剩余

68.887414053.4784431.284103.587692

81.044第三次砖混外架及内架剩余

119.855

A1080.36

本次投入1502.07202160.8047261183.212

1858.635

210*4.120600.175385

8*9.150*4179.347495371.0568

1186.716420.82788949.77105

3393

钢管总数3712.423内架扣件

内架2529.64505928

外架1182.78

632.073

3397.653

3612375

276.8262

总扣件数725823.6