英文缩写英文全称
4M&1E Man, Machine, Method, Material, Environment "BABT" Mark British Approval Board of Telecommunications "BEAB" Mark British Electrotechnical Approval Board "CCC" Mark China Compulsory Certificate
"CE" Mark Conformite Europenne
"CSA" Mark Canadian Standard Association
"D" Mark Demko (Denmark National Certification Body) "ENEC" Mark European Norm Electrical Certification. "FCC" Mark Federal Communication Commission
"FI" Mark Fimko (Finland National Certification Body) "GS" Mark Geprufte Siecherheit (Safety-Tested in German) "N" Mark Nemko (Norway National Certification Body) "S" Mark Semko (Sweden National Certification Body) "UL" Mark Underwriters Laboratory
"VCCI" Mark Voluntary Control Council for Interference
3S Standardization Simplfication Specification
4M Man Machine Material Method
5S Housekeeping Term (Japanese)
7QC Tools7 Quality Control Tools
8-D8-Discipline
A2LA American Assosiation for Laboratory
AC Alternating Current
Ac/Re Accept/Reject
ACR Action and Countermeasure Report
ADSL Asymmetric Digital Subscriber Line
AGM Assistant Genaral Manager
AGP
AI Automatic Insertion
AL Aluminium wire
AM Assistant Manager
ANSI American National Standard Institute
AP Accounts Payable
APQP Advanced Product Quality Plan
APS Advanced Planning Scheduling
AQL Acceptable Quality Level
AQL Acceptance Quality Level
AQL Acceptable Qulity Level
ART Artwork
ARTWRK Artwork
ASAP As soon as possible
ASF
ASL Approved Supplier List
ASP Analog Signal Processor
ASSY Assembly
ASTM American Society of Testing Material
ATAPI AT Attachment Peripheral Interface
ATE Automatic Test Equipment
ATO Assembly To Order
ATP Available To Promise
ATX
AUD
AVL Approved Vendor List
AWB Air Way Bill
B/L Bill of Lading
B/L Bill of Landing
B/S Balance Sheet
BAT Baby AT
BBS
BCC Blink Carbon Copy
BD Board
BGA Ball Grid Array
BIOS Basic Input Output System
BL Baseline
BL Back Light Display
BLK Black Colour
BM Benchmark
BOC Breach of Contract
BOM Bill of Material
BR Best Regards
BRKT Bracket
BS British Standard
BTO Built to Order
BTW By the way
BUM Business Unit Manager
BV Book Value
BX Box
C&ED/CAED Cause and Effect Diagram
C.O.O.Country of Origin / Certificate of Origin
C.Y.Container Yard
C/N Credit Notes
CA Corrective Action
CAD Computer-aided Design
CAD
CAD Computer Aided Design
CAM Computer Aided Manufacturing
CAM Computer Aided Center
CAP Capacitor [C]
CAR Corrective Action Request / Corrective Action Report
CAR Corrective Active Report
CAV Constant Angular Velocity
CB Certification Bodies
CBL Cable [J or W]
CC Carbon Copy
CCAP Ceramic Capacitor [C]
CCAR Customer Corrective Action Request / Customer Corrective
Action Report
CCB Change Control Board
CCIC China Import & Export Commodity Inspection Corporation CD Clock Digit Display
CDBD Card Board
CD-DA
CD-I Computer Disc-Interactive
CD-MO CD-Magnet Optical
CD-ROM Compact Disc-Read Only Memory
CDT
CD-WO CD-Write Once
CD-Write
CE Commuttee of Europe
CEO Chief Executive Officer
CFO Chief Finance Officer
CFR Cost And Freight (…named port of destination)
CFS Container Freight Station
CHF
CI Continuous Improvement
CI Custom Invoice
CIF Cost, Insurance & Freight (…named port of destination)
CIF Cost Insurance and Freight
CIP Carriage and Insurance Paid to (…named port of destination) CIRC Cross-Interleaved Reed solomon Code
CI報單
CKD Component Kit
CLCA Closed Loop Corrective Action
CLV Constant Linear Velocity
CNY
COB Chip on Board
COC Certificate of Conformance
COD Cash on Delivery
COM Customer Order Management
CONN Connector [J or P]
CONN HSG Connector Housing
COO Chief Operating Officer
COQ Customer Oriented Quality
CPK Indixes of Capability Process
CPN Customer Part Number
CPT Carriage Paid to (…destination)
CPU Central Processing Unit
CPU Center processor Unit
CQE Customer Quality Engineer
CR Cargo Receipt
CR Critical Defect
CRES Ceramic Resistor [R]
CRP Capacity Requirement Planning
CRR Contract /PO Review Record
CS Customer Sample
CT Cycle Time
CTF Critical-to-Function
CTQ Critical-to-Quality
CVR Cover
CWO Cash with Order
CX Cotco Specially Display
D&B Dice Bonding
D&T Data (electronic document)
D.N.Delivery Note
D.O.Delivery Order
D/A Document Against Acceptance
D/A Delivery Against Acceptance
D/A Documents Against Acceptance
D/D Demand Draft
D/L Download
D/P Document Against Payment / Delivery Preformance
D/P Delivery Against Payment
D/P Documents Against Payment
DA Deviation Authorization
DC Direct Circuit
DCC Document Control Centre
DCC Data Control Center
DE Design Engineer
DFM Design for Manufacturability
DFMEA Design Failure Mode and Effect Analysis DFMEA Design Failure Model Effective Analysis DFSS Design for Six Sigma
DFT Design for Test
DIO Diode [D]
DIOD Diode [D]
DIP Dual In-line Package
DJ Discrete Job
DKK
DLC Direct Labor Cost
DM Dot Matrix Display
DMR Defect Material Review
DN Deviation Notice
DOA Dead On Arrival
DOCCON Document Control
DOE Design of Experiment
DOE Design Of Experiments
DP Decimal Point
DPPM Defective Part Per Million
DR Delivery Requisition
DSC Differential Scanning Colorimeter
DSP Digital Signal Processor
DTD Door to Door
DV Design Verification / Design Validation DVD Digital Video Disc
DVI Digital Video Interactive
DVT Design Verification Test
DWG,Drawing
DZD
E.&.O.E Errors and Omissions Excepted
e.g.For Example
ECC Error Checking and Correction
ECN Engineering Change Notice
ECN Engineering Corrective Notice
ECN Engineer Change Notes
ECO Engineering Change Order
ECR Engineer Change Request
EDC Error Detection and Correction
EDI Electronics Data Interchange
EE Electrical Engineer
ELG Export Letter of Guarantee
EMC Electromagnetic Compatibility Testing EMC Electromagtic Component
EMC
EMI Electromagnetic Interference
EMI Electromagtic Interference
EMI
EMS Equipment Management System / Electronic Management System EMS Electronics Manufacturing Services
EOL End-of-Life
EOM End of Month
EOW End of Week
EPP Engineering Pre-production
EPR Engineering Pilot Run
EQ Emotion Quotient
ERP Enterprise Resource Planning
ES Engineering Sample
ESD Electrostatic Discharge
ETA Expected Time of Arrival
ETA Estimated Time of Arrival
ETD Expected Time of Delivery
ETD Estimated Time of Departure
EUR
F/T Functional Test
F1FO First-In-First-Out
FA First Article / Failure Analysis
FAE Failure Analysis Engineer
FAE Field Application Engineer
FAR Failure Analysis Report
FC Formal Contract
FCA Free Carrier (…named place)
FCB Flexible Circuit Board
FCBA Flexible Circuit Board Assembly
FCC Federal Communications Cmmission
FCL Full Container Load
FCT Functional Test
FDA Food and Drags Administration
FERR Ferrite
FFF Fit Form Function
FFT Final Functional Test
FG Finished Goods
FGS Finished Goods Store
FI Final Inspection
FIFO First-In & First-Out
FIFO First In First Out
FLTR Filter [FL]
FM Force Majure
FM Factory Manager
FMEA Failure Mode and Effect Analysis
FMEA Failure Model Effective Analysis
FOB Free On Board (…named port of shipment)
FOB Free On Board
FPC Flexible Printed Circuit
FPCA Flexible Printed Circuit Assembly
FPW Flexible Printed Wiring
FPWB Flexible Printed Wiring Board
FPY First Pass Yield
FQC Final Quality Control
FSTNR Fastener
FTY First Test Yield
FU Fuse [F]
FV Forward Circuit
FW Firmware
FYI For your information
GBP
GE General Electronic
GIP General Inspection Plan
GM Genaral Manager
GR&R Gauge Repeatability & Reproducibility
GS Golden Sample
HE Hardware Engineer
HER Earn Hours
HKD
HL Handload
HPN Hip Fung Part Number
HR Human Resources
HTOL High Temperature Operational Life
HV High Voltage
I/M Instruction Manual
I/O Input / Output
I/S Inspection Standard
I/T Inventory Turn
IBM International of Business Administration
iBOM Indented Bill of Material
IC Inspection Certificate
IC Integrated Circuit
IC Integrated Circuit [U]
IC SKT IC Socket
ICT In-circuit Test
IDA Infrared Data Association
IDCTR Inductor [L, T, X]
IDE Integrated Drive Electronics
IE Industrial Engineer
IE Industrial Engineering
IEC Internatonal Electrotechnical Commission
IEC International Electronics Committee
IECEE International Electrotechnical Commission for Electrical
Equipment
IF Invariable Frequency
IFF Information Feedback Form
ILC Irrevocable Letter of Credit
ILC Indirect Labor Cost
ILG Import Letter of Guarantee
IND Inductor [L, T, X]
INSTR Instruction
INSTR MNL Instruction Manual
INT Inter mittent
INV Invoice
INV Inventory
IP Inspection Procedure
IPA Isopropyl Alcohol
IPC Institute of Packaging and Interconnects
IPO International Purchasing Operation
IPO Internation Purchasice Office
IPQC In-process Quality Control
IQ Intelligence Quotient
IQA Internal Quality Audit
IQA Incoming Quality Assurance/ Internal Quality Auditor IQC Incoming Quality Control
IR Infra-red
IR Reverse Current
IRR
ISO International Organization for Standartization
ISO International Standard Organization
IT Information Technology
ITS Information Technology System
JEDEC Joint Electron Device Engineering Council
JIS Japanese Industrial Standards
JIS Japanese Industrial Standard
JISC Japanese Industrial Standards Committee
JIT Just In Time
JMPR Jumper wire [J or W]
JPEG Joint Photographic Experts Group
JPY
JQA Japan Quality Assurance Organization
JSA Japanese Standards Assosiation
JV Joint Venture
KEMA K-E-M-A
KETI Korean Electric Testing Institute
KPI Key Performance Indicator
KPIV Key Process Input Variable
KPOV Key Process Output Variable
KT Kepner Tregoe Potential Problem Analysis
KTL Korea Testing Laboratory (formerly KAITECH) KWD
L/A Lead Auditor
L/C Letter of Credit
L1, L2, …L7Level 1, level 2…..level 7
LAR Lot Acceptance Rate
LB Light Bar Display
LBL Label
LC Letter of Credit
LCD Liquid Crystal Display
LCL Lower Control Limit
LCL Loose Container Load / Less Than Container Load LD Led Digit Display
LED Light Emitting Diode [LED or D]
LED Light Emitting Diode
LG Letter of Guarantee
LIFO Last-In-First-Out
LOB Line of Balance
LOI Letter of Intent
LPX
LQC Line Quality Control
LSL Lower Specification Limit
LSR Line Stoppage Report
LYT Low Yield Trigging
M Manager
MA Manual Assembly
MA Major Defect
MAIC Measure-Analyze-Improve-Control
MAT'L Material
MBP Master Build Plan
MD Managing Director
MD Mini Disc
MDS Master Demand Schedule
ME Manufacturing Engineer / Mechanical Engineer/Material
Engineer
ME Manufacturering Engineer
MEMO MEMO
MES Management Execution System
MFL Material Follow-up List
MI Manual Insert
MI Minor Defect
MIDI Musical Instrument Digital Interface
MIL Military
Mil-Std Military Standard
MIS Management Information System
MMS Material Management System
MN Manufacturing Notice
MNC Multi-national Companies
MNL Manual
MOP
MOQ Minimum Order Quantity
MOU Memorandum of Understanding
MP Mass Production
MPEG Moving Picture Experts Group
MPI Manufacturing Process Instructions
MPN Manufacturing Part Number
MPS Master Production Scheduling
MPS Mass Production Schedule
MR Material Requisition
MRB Material Review Board
MRP Material Requirement Planning
MRP Material Require Planning
MRR Management Review Report
MRS Marketing Require Specification
MRSO Material Resume Ship Order
MS Manual Soldering
MS Master Scheduling
MSA Measurement System Analysis
MSD Moisture-sensitive Devices
MSDS Material Safety Data Sheet
MSSO Material Stop Ship Order
MT Mail Transfer
MTBA Mean Time Between Assist
MTBF Mean Time Between Failure
MTBF Mean Time Between Failure
MTC Material Transfer Chit
MTF Material Transfer Form
MTM Motion & Time Study Method
MTO Make To Order
MTS Make To Stock
MTS Motion & Time Study
MTTR Mean Time To Repair
MTTR Mean Time Te Repair
MYR
N/A Not Acceptance
N/A or NA Not Applicable
NCB National Certification Bodies
NCN Non-conformity Notice
NCR Non-conformity / Non-conformance Report
NDA Non Disclosure Agreement
NG No Go
NIST National Institute of Standard & Technology
NOK
NPI New Product Introduction
NPX
NRE Non Recovery Expanses /Non Returnable Expanses NRP Non-conformity Recurrent Prevention Report NRS Non-conformity Return Sheet
NZD
O/E Order Entry
O/I Operational Instruction
OA Open Account
OA Open Account
OBA Out-of-Box Audit
OBI Out-of-Box Inspection
OBM Original
OBU
OC Out-of-Control
OCAP Out-of-Control Action Plan
ODM Original Design Manufacturer
ODM Original Design Manufacturing
ODM Original Design Manufacture
OEM Original Equipment Manufacturer
OEM Origianal Equipment Manufacture
OFC Operation Flow Chart
OHI On Hand Inventory
OJT On-Job-Training
OJT On Job Trainning
OM Operations Manager
Open Open circuit
OQA Out-going Quality Assurance
OQC Out-going Quality Control
OQM Outgoing Quality Management
ORT On-going Reliability Test
OSC Oscillator [Y]
OSHA Occupational Safety and Health Administration OTD On time delivery
OTW On the way
OWB Ocean Way Bill
P&P Pick & Place
P.O Purchase Order
P.O.Purchase Order / Payment Order
P/I Proforma Invoice
P/I
P/L Packing List
P/N Purchase Number
P/N Parts Number
P/O Purchase Order
PA Preventive Action
PC Purchase Contract
PC Production Controller
PC Personal Computer
PCB Printed Circuit Board
PCB Print Current Board
P-Chart Pecentage Chart
PCM Pulse Code Modulation
PCN Packing Corrective Notice
PCP Process Control Plan
PD Product Design
PDA Perisonal Digital Assistant
PDC Passive Data Collection
PDCA Plan-Do-Check-Action
PDCC Production Data Control Center
PDR Process Deviation Request/Report
PE Product Engineer / Process Engineer/Procurement Engineer PE Product Engineering
PERT Program Evaluation and Review Technique
PFC Power Factor Correction
Photo-CD
PHP
PI Preforma Invoice
PIC Person-in-Charge
PKR
PL Packing List
PM Preventive Maintenance
PM Program Manager / Purchasing Manager / Production Manager PM Production Market
PMC Production Material Controller
PMC Production and Material planning&Control
PMG Process Monitor Group
PMI Product Manufacturing Instruction
PMP Process Management Plan
PN Purge Notice
PNL Panel
PO Purchase Order
PP Pre-production
PP Production Planning
PPA Potential Problem Analysis
PPAP Production Part Approval Process
PPM Part per Million
PPM Parts Per Million
PPR Production Pilot Run
PQC Production Quality Certification
PQC Process Quality Control
PQE Product Quality Engineer
PQR Process Qualification Report / Product Qualification Report PR Process Review
PR Purchase Requisition
PR Pilot Run
PRO Production
PROD Production
PS Production Sample
PS Production Supervisor
PSS Production Scheduling System
PTH Plated Through Hole
PV Product Validation
PW BRD Printed Wiring Board
PWA Printed Wiring Assembly
PWB Printed Wiring Board
PWBA Printed Wiring Board Assembly
Q.I.Quality Index
Q.I.P Quality Improvement Program
QA Quality Assurance
QC Quality Control
QCC Quality Control Circles
QE Quality Engineer
QM Quality Manual / Quality Manager
QM Quality Manager
QMR Quality Management Representative
QMS Quality Management System
QP Quality Policy
QRE Quality Reliability Engineering
QS Quality System / Quality Standard
QTY Quantity
Q'TY Quantity
QVL Quality Vendor List
Q監Quality Audit
R&D Research & Development
R&D Research&Development
R.P.N Risk Process Number
RD Research & Development
Ref Reflector
RES Resistor [R]
RESP Responsible
REV Revision
RFC Response Flow Chart
RFQ Request For Quotation
RH Relative Humidity
RI or R/I Receiving Inspection
RLY Relay [K]
RMA Return Material Authorization
RMA Return Material Authorized
RPN Risk Priority Number
RTV Return-to-Vendor
RVT Rivet
RWK Rework
S & P Sales and Purchase Agreement
S.O.Sales Order
S/O Shipping Order
S/S or SS Sample Size
SA Shipping Advice
SA System Analyse
SA System Analysis
SAE Settement after export
SAR Supplier Audit Report
SBE Settement before export
SBR Special Build Request
SC Sales Contract
SCAR Supplier Corrective Action Request/Report SCC Standards Council of Canada
SCHEM Schematic Diagram
SCM Supplier Chain Management
SCRN Screen
SCRW Screw
SCSI Small Computer System Interface
SD Surface Digit Display
SD
SD Sale Department
SE Software Engineer / System Engineer SEK
SFC Shop Floor Control
SGD
SGS Sosiete Generale de Surveillance
Short Short Circuit
SHR Standard Hours
SI Source Inspector/ Source Inspection
SI System Integration
SIP Standard Inspection Procedure
SKD Semi Kit
SKT Socket
SL Surface LED Lamp
SL Sight Letter of Cridit
SLA Skipped-lot Audit
SM Sales Manager / Senior Manager
SMD Surface-mount Devices
SMD Surface Mounted Device
SML Shortage Material List
SMT Surface-mount Technology
SMT Surface Mounted Technology
SMT Surface Mount Technology
SNR Sample Run Notice
SO Shipping Order
SOP Standard Operating Procedure
SOP Standard Opeation Process
SOP Standard Operation Procedure
SPC Statistical Process Control
SPC Statistic Process Control
SPC Statistical Prcess Control
SPCR Spacer
SPEC Specification
SQC Statistical Quality Control
SQE Supplier Quality Engineer
SR Sales Return
SR-Chart Short-Run Chart
SSCRN Silk Screen Printing
SSO Stop Ship Order
STS Ship-to-Stock
STS Ship To Stock
SUB-ASSY Sub-Assembly
SUR
SW Switch [SW]
SWB Sea Way Bill
SWP Standard Work Procedure
T & C Term and Condition
T/S Trouble - Shooting
T/T A Advance Telegraphic Transfer
TAT Turn-around-Time
TCB Telecommunication Certification Body TE Test Engineer
TEMP Temperature
Tg Glass Transit
TH Through Hole
THB
TMCL Temperature Cycle Reliability Test TNKY Turnkey
TOV Time of Validity
TPEDP Third Party Test Data Program
TPM Total Prevention Maintenance
TPY Throughput Yield
TQ Thank You
TQA Total Quality Assurance
TQM Total Quality Management
TR Trust Receipt
TSD Test Support Department
TT Telegraphic Transfer
TUV TUV Rheinland Group
TWD
TYP Typical
U/L Upload
U/P or UP Unit Price
UAI Use-as-Is
UC Undertaking Clause
UCL Upper Control Limit
UKAS United Kingdom Accreditation Service
UL Underwriters Laboratories
UL Underwriter's Laboratories
UL Usance Letter of Credit
UML Urgent Material List
USB Universal Serial Bus
USD
USL Upper Specification Limit
UV Ultra-violet
UV Ultraviolet
VA Visual Aid
VA/VE Value Anglysis / Value Engineering VAD Visual Aid Display
VCAR Vendor Corrective Action Request/Report VE Value Engineering
Ver Version
VF Variance Frequency
VHR Vendor History Record
Video-CD
VIP Very Important
VMI Visual Mechancial Inspection
VMI Vendor Managed Inventory
VOC Voice of Customer
VP Vice President
VR Variance Rate
VR Voltage Regulator [VR, V or U]
VSR Vendor Scoring &Rating
W&B Wire Bonding
W/With
W/O Without
WHT White Colour
WHTOL
WHTRB
WI Work Instruction
WIP Work In Progress
WIP Work In Process
WIP Working in Process
WN Waiver Notice
WR Wire [J or W]
WR TERM Wire Terminal
WS Work Standard / Workmanship Standard WS Working Sample
WSHR Washer
XFMR Transformer [T]
XSTR Transistor [Q or U]
X'TAL Crystal [Y]
ZD Zero Defects
Review
Audit
Burn-In
Quality Cost
Quality Policy
Quality Objective
Conformity
Non-Conformity
Reliability
Liability
MIL-STD-105D Yield Rate Operation Process Operation Research Optimum Solution Work Simplify Brain Storming Outstanding Blance Debit Note Railway Bill Phase-In
Phase-Out System Procedure Index
Release
Project Plan Window
Project Leader Plug And Play Bare Bone Postpone
Work In Process Lead Time Alternate BOM Pending Assemble Component Reservation Access Time Random Seek Swap
DVD-RAM
DVD-Title Inflation Deflation
Vendor Rating Life Test
Spindle Motor Control Run Report Error Code
Order
Buffer
Clean Room
中文解释
人,机器,方法,物料,环境- 可能导致或造成问题的根本原因
为IT,无线电通讯和电讯产品提供认证和服务的机构
为销售到英国(UK)的电气产品的安全性提供认证的独立机构
中国强制认证 -中国于2003年8月1日将"CCIB"和"CCEE"归纳于"CCC"认证中,将原有的进出口货品检查和出口产品质量认证归纳于这一体系“CCC”。
欧盟产品安全与健康认证- 证明该要销售到欧盟的产品已通过安全与健康认证为销售到加拿大的产品的电性安全提供认证的独立机构
为销售到丹麦的产品的电性安全提供认证的独立机构
ENEC为特定的产品在符合欧洲安全标准的基础上提供此认证标识
成立于美国的联邦通讯委员会为工业制定了需遵守的关于发射产品的无线电频率的规章
为销售到芬兰的产品的电性安全提供认证的独立机构
德国安全产品认证 -- 为销售到德国的产品的电性安全提供认证的独立机构
为销售到挪威的产品的电性安全提供认证的独立机构
为销售到瑞典的产品的电性安全提供认证的独立机构
美国保险人实验室--为销售到美国的产品的电性安全提供认证的独立机构。是世界上最有权威性的安全认证
VCCI是由日本工业协会成立的,以便响应政府发出的电子制造厂商应参与EMI 控制的要求
標準化、單純化、專門化
人、機器、材料、方法
五常法。用来清理车间或作业地方的良好管理系统
品质管理7手法
以固定的形式8-步骤来解决问题的方法和报告
美国化验室协会
交流電
接收/拒收
措施和对策报告
異步數字用戶線
助理总经理
加速繪圖埠
自动插机
鋁線
副经理
美国国家标准机构
應付帳款
产品质量先期策划和控制计划-ISO/TS16949系统的产品质量策划要求
先进规划与排期
可接受质量等级
可接受水準
允許水準
绘图
绘图
尽早
清算瑞士法朗
客户批准的供应商一览表
類比信號處理
制品装配
美國材料實驗協會
自动测试设备
装配式生产
允貨量
主機板尺寸之一種
客户批准的供应商一览表
航空运单
提单
提(貨)單
資產負債表
主機板尺寸之一種
電子佈告欄
无信头抄送,无信头副本
印刷线路板
腳位錫球陣列
基本輸入、輸出裝置
参照点
背光源顯示器
黑色
参照点
违反合同简称违约
生产产品所用的物料清单
最诚致的问候
支架
英国标准
接單後生產
顺便问一下
业务单元经理
账面价值
箱子
原因和效果图
原产地 / 产地证
貨櫃集散場
貸方通知
解决问题所采取的措施
电脑辅助设计.用于制图和设计3维物体的软件
加拿大元
計算機輔助設計
計算機輔助制造
電腦輔助製造
电容
客户用于投拆供应商或反馈时所使用的报告/ 供应商用于答复客户的投拆或反馈的报告
行動改善措施
固定角速度
认证机构
电缆,电线
副本,抄送
陶瓷电容
客户用于投拆供应商或反馈时所使用的报告 / 供应商用于答复客户的投拆或反馈的报告
对文件的要求进行评审,批准,和更改的小组
中国进出口商品检验总公司
標準時鐘型顯示器
卡纸板
鐳射唱片
互動式光碟
磁光式光碟機
光碟機
寫入一次光碟
CD-錄製機
首席执行员
财务总监
成本加运费(...指定目的港)
集装箱货运站
瑞士克朗
依照短期和长期改善的重要性来做持续改善
海关发票
成本加保险费加运费(...指定目的港)
到岸價
运费,保险费付至(...指定目的地)
交叉式的偵錯除錯碼
免審免檢
完整品質矯正措施
固定線性速度
人民币
邦定-线焊芯片到PCB板的装配方法.
制成品的合格证书,通常随每批制成品一起走货。
交货后付款
客户订单管理
连接器,插座
连接器外壳
生产营运总监
客戶品質導向
制程能力指數
客户编号
运费付至(...目的地)
中央處理器
中央處理器
客户品质工程师
承运货物收据
嚴重缺點
陶瓷电阻
产量需求计划
合同评审记录或报告
客户样品
完成任务所须的时间
对产品加工过程的功能和产品质量很有影响
对产品质量很有影响
盖子
随订单付现
特殊顯示器(Cotco)
固晶
数据
送货单(用于记录物料出货的文件)
送货单(用于记录物料出货的文件)
承兑交单
承兑交货
承兌交單
票汇
下载
付款交单 / 达交率
付款交货
付款交單
规格偏离授权书
直流電
正式文件,原文件和秘密文件保存的地方及受控文件的发放中心。資料中心
产品的设计对装配的适合性
设计失效模式与后果分析--在设计阶段预测问题的发生的可能性并且对之采取措施
設計失效模式分析
六西格玛(6-Sigma)设计 -- 设计阶段预测问题的发生的可能性并且对之采取措施并提高设计对装配的适合性
产品的设计对测试的适合性
二极管
二极管
手插(過焊錫爐)
工單
丹麦克朗
直接人工成本
標準點陣顯示器
不良材料審核
规格偏离通知书
開機死機
正式文件,原文件和秘密文件保存的地方及受控文件的发放中心。
实验设计-- 用于证明某种情况是真实的
實驗設計
DP 點
根据一百万件所生产的产品来计算不良品的标准
出货申请单
色差掃描儀
數位信號處理
门到门运输
设计确认
數位影音光碟
互動式數位影像
設計驗證測試
图纸
阿尔及利亚第纳尔
錯誤或遺漏不在此限
例如
客户要求的工程更改或内部所发出的工程更改文件
工程修改圖紙通知單
工程變更通知
客户要求的工程更改
工程變更需求
电子资料的讯息流通- 电子报关,下订单等业务
电子工程师
出口保证书
电磁适应性测试
電磁波元件
電磁相容檢測
电磁影响
電磁波干擾
设备管理系统 / 电子管理系统
电子生产加工服务
停止生产的产品
月末
周末
量产前的工程样品试做
工程試製
情感商數
企业资源规划
工程样品
静电发放-由两种不导电的物品一起摩擦而产生的静电可以破坏ICs和电子设备预计抵达日期
予定抵埠日
预计发送日期
予定開航日
欧元
测试产品的功能是否与所设计的一样
先进先出的物料管理方法
首件产品或首件样板/ 产品不良分析
失效分析工程师
技術應用部門
不良品分析报告
书面合同
货交承运人(...指定地)
可弯曲的印制电路板
FCB元件焊锡或组装
無線電通訊管制認證
整箱货
功能测试-检查产品的功能是否与所设计的一样
美国食品药物管理局
陶铁磁体
符合产品的装配,形状和外观及功能要求
包装之前,在生产线上最后的功能测试
制成品
存放成品的货仓
在生产线上或操作中由生产操作员对产品作最后检查
先進先出(倉庫物料原則)
先進先出
过滤器, 滤波器
不可抗力的原因,如战争,地震,水灾…
厂长
失效模式与后果分析-- 预测问题的发生可能性并且对之采取措施
潛在失效模式分析
装运港船上交货(...指定装运港)
離岸價
可弯曲的印制电路板
FPC元件焊锡或组装
可弯曲的印制电路板
可弯曲的印制电路板
首次检查合格率