Supplier Capacity Database (Chrysler only)SQE Purchase Order (FIAT Only)Buyer / PO
Calculated (Not Manual Input)
Part Information
Part Description 零件名称(必填)
电液泵总成
No
Assumed Yearly Working Days:
288
If yes, input the CPG Daily Capacity here:
年工作天数(按美国288天计算,不许更改)
Is this a Shared Line?(是否有其他产品共线)
No Are these parts used on other vehicles?(共线的零件是否用于其他泵)
No
If yes, complete the table below 填“YES”,需填写下面表格
Part Description (不用填写)
零件名称(必填)电液泵总成
0000
Include Total Additional Capacity in calculations?
Process #
工序号
Next Process(es)
#
(下道工序
号)
Process Description
(工序描述)
Shifts /Day (一天几班次)
Shifts /Week (一周几班次)Hours /Shift (每班几小时)Working Days / Week (一周几工作
日)
123456789101112131415
P R E -P D R D A T A
Supplier Mfg.Location:
地址(必填)
Time Scheduled for Other Parts
/ Customers (min/shift)(每班用于生产其他产品的时间)
Planned Cycle Time (seconds)(生产节拍)
Number of Pieces required for next process step (一道生产工序产生几件零件)
10
56.01
1
PROCESS
OPERATING PATTERN
DOWNTIME
Scheduled Breaks /
Lunch (min/shift)(午休时间)
Changeovers (min/shift)(不同产品换型时间)
Planned Maintenance
(min/shift)
(每班设备维护时间)
Est. Unplanned Downtime
(min/shift)
(每班计划外停线时间)
00
00000068247930AA
0Contract Capacity (Daily Tool Capacity) 2(合同计划产能/每日)Vehicle / Model 3(其他产品3)Contract Capacity
(Daily Tool Capacity) 3
(合同计划产能/每日)
Total Additional
Capacity
(总产能)自动生成不
用填写零件号(必填)Are these parts included in a Common Process Group (CPG)? Part Number (不用填写)
Vehicle / Model 1(其他产品1)Contract Capacity (Daily
Tool Capacity) 1(合同计划产能/每日)
Vehicle / Model 2(其他产品2)
N/A 00
N/A
00N/A 00N/A 00N/A 68247930AA
649
186912649
186912N/A 零件号(必填)日生产量(按合同要求)
年生产量(自动生成)
规划产能(必填)
年预计生产量(自动生成)
Commodity:Part Number Contract Capacity (Daily Tool Capacity)Annual Capacity Capacity Planning
Volume Annual Projected Volume Square Color Key (Where Data Originates)
PDR Date:
Supplier:
必填(供应商名称)Vehicle / MY:Supplier Code:(供应商代码)
P D R R E S U L T S
P D R R E S U L T S