防渗尾矿库地震稳定性和位移分析

闭库尾矿库地下水污染防控措施

Advances in Environmental Protection 环境保护前沿, 2020, 10(4), 593-598 Published Online August 2020 in Hans. https://www.doczj.com/doc/d18006747.html,/journal/aep https://https://www.doczj.com/doc/d18006747.html,/10.12677/aep.2020.104073 Prevention Measures of Groundwater Pollution in a Closed Tailing Reservoir Shukai Fan, Li Li, Shuang Song BGRIMM Technology Group, Beijing Received: Aug. 1st, 2020; accepted: Aug. 21st, 2020; published: Aug. 28th, 2020 Abstract The non-ferrous metal tailing reservoir covers a large area and the storage of tailings is large, if the tailing reservoir is not closed according to the design requirements when service ending pe-riod, the pollution factors contained in the tailings leaching solution carried by the tailings reser-voir may polluted the regional groundwater. In this paper, we take a closed tailing reservoir of gold mine as an example, according to the environmental status survey and regional hydrogeolog-ical data to find out the groundwater pollution around the tailings pond, put forward the preven-tion and control measures of groundwater pollution, including multi-layer barrier on the pond surface, improvement of rainwater and flood drainage system of the pond and new vertical cut-off wall for groundwater, achieving the source control and contaminant plume control of groundwa-ter pollution. Keywords Closed Tailing Reservoir, Groundwater Pollution, Prevention Measures, Vertical Cut-Off Wall 闭库尾矿库地下水污染防控措施 范书凯,李莉,宋爽 矿冶科技集团有限公司,北京 收稿日期:2020年8月1日;录用日期:2020年8月21日;发布日期:2020年8月28日 摘要 由于有色金属尾矿库占地面积、尾矿堆存量一般较大,服务期满如果没有按照设计要求闭库,尾矿库承载

尾矿库稳定性分析勘察报告

×××××××××××××有限责任公司×××尾矿堆积坝稳定性评价 岩土工程勘察报告 ×××××××××××有限公司 2007年7月1日

目录 文字部分 1 前言 (1) 1.1 工程概况 (1) 1.2 勘察技术要求 (1) 1.3 勘察工作执行的主要技术标准 (2) 1.4 勘察方法及完成工作量 (2) 1.4.1 工程地质测绘 (2) 1.4.2 钻探 (2) 1.4.3 取土试样 (2) 1.4.4 原位测试 (2) 1.5有关说明 (3) 2 场地工程地质条件 (4) 2.1 地形及地貌 (4) 2.2 区域地层 (4) 2.3 区域地质构造 (4) 3 堆场工程地质条件 (5) 3.1 堆场形态 (5) 3.2 堆积方式 (5) 3.3 堆场地层 (5) 3.4 不良地质作用 (5) 4 拦洪坝场地工程地质条件 (6) 5 物理力学性质指标 (6) 5.1 尾矿土的物理力学性质指标 (6) 5.2 尾矿土的抗剪强度指标 (6) 5.3 标准贯入试验锤击数 (7) 5.4 重型动力触探试验代表值 (7) 5.5 渗透性 (7) 6 场地水、土对建材腐蚀性评价 (8) 7 场地地震效应 (8)

7.1 尾矿坝分级及场地分类 (8) 7.2 地震动参数 (8) 7.3 地震液化和震陷 (8) 8 堆场坝体稳定性分析与计算 (8) 8.1 尾矿坝现状分析 (9) 8.2 尾矿坝渗流分析 (9) 8.3 尾矿坝稳定性评价 (9) 8.4 尾矿坝加高排渗措施 (12) 9 结论及建议 (13) 附件:岩土工程勘察任务委托书 图表部分

1 前言 *************有限责任公司***尾矿堆积坝稳定性评价岩土工程勘察工作,是根据该公司提出的岩土工程勘察任务委托书技术要求,并受*********有限责任公司委托,由我院于2007年6月完成。 1.1 工程概况 ***银花钒矿位于***省***县银花镇梅子沟村,尾矿库位于梅子沟西侧的***,处于糜子沟主沟道。 原***坝80年代修建,现无设计资料,该坝原为水库。根据现场踏勘及甲方提供资料知,***初期坝为重力砌石夹心不透水坝,坝高约22.0m,坝底宽约23.0m,坝顶宽3.0m。坝顶轴线长62.0m,坝顶高程598.0m,坝下脚线高程为576.3m,库容约12万m3。 该矿从1998年开始向库内排放尾矿渣,采取坝后任意排放。目前库内尾矿渣堆放高程595.51~598.62m,距坝顶平均高程约1.3m,整体呈坝前低,坝后高。该坝于2006年停用,并进行了闭库设计。目前新的尾矿库正在筹备修建之中,为保证矿山正常生产经营,拟将该库做为临时过渡尾矿库,据设计初步估算,坝体拟加高3~10m。 该尾矿库排洪系统采用排洪涵洞,排洪涵洞建设在西侧,防洪标准为100年一遇。 加高3~8.0m时,按《尾矿库安全技术规程》(AQ2006-2005)第4.1条划分,加高后的尾矿库为五等库。加高>8m时,按《尾矿库安全技术规程》(AQ2006-2005)第4.1条划分,加高后的尾矿库为四等库。 1.2 勘察技术要求 1)查明尾矿库存在的不良地质作用,评价不良地质作用对堆场的影响,提出合理的防治措施; 2)查明尾矿库的地层、岩性,提供尾矿土常规物理力学指标、颗分、渗透系数及抗剪强度指标(C、Φ值); 3)查明目前标高下尾矿库地下水位(浸润线)及变化规律; 4)提供尾矿库所在区域的地震烈度及地震动参数,评价堆场的地震效应; 5)分析评价已运行坝体的稳定性,继续加高坝体的适宜性和稳定性。

尾矿库应急管理及响应制度实用版

YF-ED-J3930 可按资料类型定义编号 尾矿库应急管理及响应制 度实用版 In Order To Ensure The Effective And Safe Operation Of The Department Work Or Production, Relevant Personnel Shall Follow The Procedures In Handling Business Or Operating Equipment. (示范文稿) 二零XX年XX月XX日

尾矿库应急管理及响应制度实用 版 提示:该管理制度文档适合使用于工作中为保证本部门的工作或生产能够有效、安全、稳定地运转而制定的,相关人员在办理业务或操作设备时必须遵循的程序或步骤。下载后可以对文件进行定制修改,请根据实际需要调整使用。 一、管理部门 公司设立应急管理小组,公司总经理任应 急管理小组组长、公司副总经理任应急管理小 组副组长、尾矿库负责人及公司中层领导为小 组成员。安委会负责日常管理工作 二、紧急事件 1、紧急事件指可能造成重大人员伤亡、重 大经济损失及环境破坏的突发事件。 2、紧急事件的认定应考虑: (1)法律法规与其他要求。

(2)以往事故、事件和紧急状态。 (3)依据风险确定潜在的紧急事件。 3、确定的紧急事件时应包括尾矿库周边的情况,并针对潜在的紧急事件收集相关的地理、地质、气象及村庄居民等信息。针对潜在的紧急事件尽可能预测可能发生的时间与破坏性质,并考虑人员密集程度及对周边的影响。 4、确定紧急事件时应考虑下列情况: (1)自然灾害:洪水;泥石流;地震。 (2)库区异常:外来尾矿、废水;周围采矿作业;库内采、选尾矿。 (3)运行管理异常:水位超过警戒线;排洪设施损毁;排洪系统堵塞;坝体深层滑动。 三、应急预案编写要求 1、应急预案的编制应当符合下列基本要

尾矿库防渗施工方案

尾矿库防渗施工方案 我国工业固体废弃物在处理过程中使用填埋场成为常用的方法,其中尾矿填埋场最为常见,随着国家对环保意识的逐渐加强,对尾矿填埋场的建设提出了更高的要求,传统的防渗方式,用水泥混凝土,石头堆砌,防水涂料等已不再适用。新型的防水材料HDPE土工膜,解决了这一难题。 土工膜具有施工周期短,施工简易,维修方便,投资成本低,多重保护,环保防渗效果好等特点,完全符合填埋场的设计需求。土工膜具有良好的耐热性和耐寒性。化学稳定性好,具有较高的刚性和韧性,抗老化和赖腐蚀性能强,机械拉伸强度好,具有很好的介电性能,耐环境应力开裂性能较好。广泛用于垃圾填埋场,尾矿填埋场,废弃物填埋场防渗 尾矿填埋防渗,其施工工艺流程如下: 施工准备现场处理铺设焊接固定防护措施

一、铺设前的准备 A、土工膜铺设前应保证铺设面符合设计要求和符合质量安全要求。 B、土工膜及焊条的材料和质量应符合设计要求和有关标准的规定。 C、与铺设无关的人员不得进入施工现场。 D、所有进入土工膜施工现场人员佩戴出入证,穿对土工膜无损伤的鞋子,进入现场任何人不得吸烟。 E、在土工材料上,所有工具必须轻拿轻放,不得扔摔或重放,严禁热工具与土工膜接接触。 F、土工膜施工完毕必须注意成品保护。 H、材料在装卸、搬运过程中不得使用任何可能对材料造成机械损伤的器具,拉动、抬起或卷起,不容许一些不受控制的展开方法,轻拿轻放(如图) 现场的处理: A、平整现场的地面,使其表面平整,压密实,地表面没有凹凸物,没有大的石块、铁 丝钢丝等硬质的东西,防止刺坏防渗膜(如图)

B、填埋场的四周挖出40*40的锚固沟,为防渗膜在填埋场两边的锚固做准备 二、铺设 A、将准备铺设的防渗膜卷材在空地展平,按预定方案裁剪成需要的形状。 B、在铺膜过程中要避免人为的损坏,应平顺、贴实、尽量减少褶皱,合理的选择铺设方向,尽可能减少接缝受力,合理布局每片材料的位置,力求接缝最少 C、平整的地面上铺膜,坏,合理计算、选择最佳铺膜方式(以减少焊接缝数量节约材料为标准)在铺膜过程中要避免人为的损,?相邻膜焊接缝错位按“丁”字形铺设,此外铺膜时

尾矿库防渗系统设计

尾矿库防渗系统设计 摘要:经济在快速发展,社会在不断进步,综合国力显著加强,尾矿库设计及 施工过程中,防渗系统是一项非常重要的内容,而国内的很多尾矿库,即使进行 了防渗处理,仍然存在渗漏的情况。本文从水力防渗和环保防渗两方面出发,探 讨了防渗设计的思路、方法等内容,并结合笔者的实践,提出了设计与施工过程 中的注意事项,最后简单介绍了两个实际工程,供广大技术人员参考。 关键词:渗流破坏;水平防渗铺盖;垂直防渗体系;环保防渗标准;土工膜;防渗等效性 引言 中国是一个矿业大国,矿业的发展导致尾矿的产出量一直保持在较高的水平。目前,我国对于尾矿的处理中除少部分用于膏体充填及综合利用以外,大部分仍 需利用尾矿库堆存,尾矿库一直是我国矿山企业生存发展中的重要组成部分。随 着国家及地方各级主管部门对安全、环保不健全的矿山尾矿库的综合整治与闭销 库工作,我国尾矿库数量呈逐年减少趋势。 1尾矿库 尾矿库是储存尾矿等工业废渣的主要领域,其包括的方面比较多,大体上涉 及初期坝、尾矿堆坝、排洪和回水以及监测设备等多个方面。尾矿库坝选矿厂内 形成的尾矿全部堆放到一起进行有效的处理,可以收取部分的资源,并且保护周 围的环境。例如,在对水资源进行保护的过程中,矿山一般属于用水最多的一项 区域,处理1t原矿的用水量几乎达到了4t以上,有的甚至上升到了20t,处理完原矿的废水能够继续循环使用,其具备较高的回收率,可以减少水资源过度浪费 现象的发生。由此可知,在矿山生产中只要形成尾矿,就需要构建尾矿库来处理 尾矿中存留的废弃物,以此防止将尾矿排入江河、湖泊中,以免对水源产生污染 现象,从而增加水资源的过度输出。尾矿库是一项较大的危险源,当尾矿库建设、管理和维护期间出现一系列问题之后,必定会对矿山企业产生不良的影响,不利 于经济效益的提高,严重的情况下还会造成严重的社会问题。当前阶段,各项矿 山企业虽然加大了对尾矿库的建设力度,不过在建设和应用尾矿库的过程中,尚 有诸多的不足之处,并且尾矿库建设期间所需的成本是非常多的,有的几乎达到 了选矿厂建设费用等,基于此,就需要加大对尾矿库的设计、施工、检测以及后 期维护力度,这是矿山企业生产期间面临的首要内容。该文主要探讨了尾矿库的 环保防渗设计情况。此外,遵循相关的要求,企业需要按照标准要求对相关的工 业固体废物进行鉴别,以此明确了解到哪一种属于危险废物,而哪一种属于普通 工业固体废物,将具体的鉴别结果汇报给所在区域的环保行政主管部门。在对尾 矿库进行设计的过程中,设计人员还应当要求业主提供出企业产生的尾矿性质鉴 别资料。 2尾矿库防渗系统设计 2.1尾矿库环保防渗设计方案 尾矿库环保防渗设计,同样可采用水平防渗体系或垂直防渗体系的形式。水 平防渗体系指在尾砂堆积部位以及设计最高洪水位标高以下,采用天然衬层或铺 设人工防渗衬层的形式形成水平防渗铺盖。垂直防渗体系指在库周边施工防渗墙 或帷幕灌浆,形成尾矿库垂直防渗体系。水平防渗体系与垂直防渗体系相比,具 有施工简单、快捷,易分期施工,减缓投资的优点,但是,目前尾矿库水平防渗 体系普遍采用土工膜,而土工膜之间的连接,一般采用焊接或粘接,受施工条件

尾矿库建设安全管理制度标准版本

文件编号:RHD-QB-K4146 (管理制度范本系列) 编辑:XXXXXX 查核:XXXXXX 时间:XXXXXX 尾矿库建设安全管理制 度标准版本

尾矿库建设安全管理制度标准版本操作指导:该管理制度文件为日常单位或公司为保证的工作、生产能够安全稳定地有效运转而制定的,并由相关人员在办理业务或操作时必须遵循的程序或步骤。,其中条款可根据自己现实基础上调整,请仔细浏览后进行编辑与保存。 一、尾矿库建设项目“三同时”的要求 1、建设项目程序 (1)建设项目过程阶段划分 ①可行性研究阶段②设计施工验收阶段 ③生产运行阶段 (2)尾矿库建设项目安全设施“三同时”流程 ①立案→备案→征地→地质勘察→环境评价→可行性研究 建设项目安全预评价(预评价报告报批→专家评审→预评价报告备案)

②初步设计与安全专篇(专家评审)→施工建设(施工监理)→建设项目安全验收评价→建设项目验收→申请安全生产许可证→发放安全生产许可证 ③尾矿库投入生产运行 2、建设项目各阶段的评审、验收 (1)建设项目立项后应经设区市或省发改委审批备案。 (2)建设项目安全预评价应经设区市或省安全监督管理部门主持的专家评审。 (3)初步设计与安全专篇应经设区市或省安全监督管理部门主持的专家评审。 (4)建设项目安全验收评价后应经设区市或省安全监督管理部门组织的专家验收。 3、建设项目各阶段对承办单位的要求

(1)勘察、设计、施工须满足法律法规及安全、健康要求。 (2)勘察 工程地质与水文地质勘察须符合国家及行业标准要求并考虑到设计有关要求。如尾矿库选址勘察应遵守下列原则: --不宜位于工矿企业、大型水源地、水产基地和大型居民区上游; --不应位于全国和省重点保护名胜古迹的上游; --应避开地质构造复杂、不良地质现象严重区域; --不宜位于有开采价值的矿床上面; --汇水面积小,有足够的库容和初、终期库长。 (3)初步设计 ①尾矿库设计文件须确定下列安全运行控制参

尾矿库防渗结构设计

浅谈尾矿库防渗结构设计 摘要:尾矿库堆存的尾砂一般可分为“危险废物”、“第ⅰ类一般工业固体废物”和“第ⅱ类一般工业固体废物”。按照环境保护管理规定和标准要求,贮存“危险废物”和“第ⅱ类一般工业固体废物”的尾矿库必须进行尾矿库全断面防渗。为增强防渗功能的可靠性,目前多采用以高密度聚乙烯土工膜(hdpe土工膜)为主要防渗屏障层,并全面考虑防渗、反滤、地下水导排及基础沉降等多方面因素的复合防渗结构。 关键词:尾矿库hdpe土工膜尾矿库防渗结构层 abstract:the tailings backfilling materials generally can be divided :“hazardous waste”、“class-ⅰ general indcstrial waste”and“class-ⅱgeneral indcstrial waste”,according to environm ental protection laws and standards,the whole section antiseepage treatment must be provided for tailing pongs with“hazardous waste”and“class-ⅱgeneral indcstrial waste”. at present,to enhance the reliability of the seepage control function,we adopt high density polyethylene geomembrane (hdpe geomembrane) as the main seepage barrier layer;and comprehensively considering seepage-proofing、inverted filter、groundwater in the guide line and foundation settlement and so on various factors of composite anti-seepage structure.

尾矿库筑坝施工组织方案

. 目录 一、工程概况 (1) 1.1工程简介 (1) 1.2施工条件 (1) 二、编制依据 (1) 三、项目施工组织 (1) 3.1施工组织机构 (2) 3.2工程质量目标 (2) 3.3环境保护措施 (2) 四、施工方法 (2) 4.1工程测量 (2) 4.2尾矿赤泥筑坝 (3) 4.3排渗涵管施工 (3) 4.4黄土覆盖施工 (3) 4.5浆砌石护坡 (4) 4.6新建排水井施工 (4) 4.7排水沟施工 (5) 五、综计合专业资料. . 划 (5) 5.1劳动力需求计划 (5)

5.2施工机具、机械需求计划 (6) 六、工程质量管理 (6) 6.1质量管理目标 (6) 6.2质量控制措施 (6) 七、职业健康安全管理 (6) 7.1职业健康管理 (6) 7.2安全管理 (7) 专业资料. . 一、工程概况 1.1工程简介 本工程为中电投山西铝业有限公司上木章赤泥库项目赤泥堆存子项目,建设地点为山西省原平市中阳乡上木章村东。赤泥库分为上、下两个库区,上库区最终堆积标高955.00m,下库区最终堆积标高为920.00m,上库920.00m以下及下库870.00以下部分由中国瑞林工程技术有限公司提供设计,其余上、下库区均由中铝国际工程股份有限公司沈阳分公司设计,具体施工由我单位即五矿二十三冶原平分公司承担。 1.2施工条件 1.2.1气候条件 原平市整年气候干燥少雨,全年只有6、7、8月有少量降雨外,其余均为枯水期,但进入

11月中旬至来年3月上旬均气候寒冷,所以按设计要求每年筑坝按15天一个晾晒周期,除去雨季,每年可筑14次。 1.2.2交通运输条件 现尾矿库至压滤车间修有简易便道,车间至尾矿大约2~3km,便于赤泥运输及堆存。1.2.3供电条件 现电源条件也很方便,库区四周设有环库照明线路,电压为380V,可直接从线路取电。 1.2.4水源条件 筑坝区无水源,用水需从压滤车间机井处用洒水车运输到筑坝区。 二、编制依据 ①《尾矿设施施工及验收规范》(YS5418-95) ②《尾矿库安全监督管理规定》 ③《尾矿库安全技术规程》(AQZ006-2005) 专业资料. . ④《中铝国际工程股份有限公司沈阳分公司设计蓝图》 ⑤《中华人民共和国建筑施工有关规程、规范及验收标准》 ⑥《建设工程施工现场管理规定》 ⑦现场和周边实际勘察情况 三、项目组织施工 3.1施工组织机构

尾矿库稳定性分析

FLAC软件在拦水坝稳定性分析中的应用 摘要:坝体稳定性是矿山企业安全生产的重要方面,做好坝体的稳定性评价工作有非常重要的意义。该文介绍了FLAC的概况,并根据已知的工程地质资料及岩石力学参数,用连续快速拉格朗日分析软件FLAC模拟了拦水坝的稳定性。通过模拟出坝体的应力应变和破坏场,了解坝体可能发生变形破坏的区域。为拦水坝的安全管理提供一些理论方面的依据。根据模拟出来的结果,提出了相应的解决措施,确保其正常运行,不至于发生垮坝事故,避免造成人员伤亡和经济损失。关键词:拦水坝;连续快速拉格朗日分析;稳定性;措施 Application of FLAC software in the stability analysis of the dams Lei Dingding Ma Haitao Liu Yongfeng Zhou Yifan Abstract: Dam stability is an important aspect of the mining enterprises of production safety, good stability evaluation of the dam has very important significance. This paper introduces the overview of the fast lagrangian analysis of continua(FLAC). According to the known engineering geological data and rock mechanics parameters, FLAC software simulates the stability of the dams. We can understand that the dam may occur to the area of deformation and failure by the displacement of the simulated dam deformation and destruction of the field. It is the basis of some theoretical aspects of the safety management of dams. According to the simulation results, to put forward specific measures to ensure its proper operation, and will not collapse accident occurred, to avoid causing casualties and economic losses. Key words: dams;fast lagrangian analysis of continua ( FLAC);stability;measure

尾矿库环境风险及管理对策分析

尾矿库环境风险及管理对策分析 发表时间:2019-11-13T15:30:38.237Z 来源:《工程管理前沿》2019年19期作者:王俊解恒正杨建安 [导读] 通过对尾矿库环境风险的分析提出对应的管理对策,强化尾矿库环境保护工作的管理,促进矿山持续发展,打造新型的绿色矿山。摘要:通过对尾矿库环境风险的分析提出对应的管理对策,强化尾矿库环境保护工作的管理,促进矿山持续发展,打造新型的绿色矿山。实现矿业发展与生态环境和谐。 关健词:矿山尾矿库环境风险管理对策 1 前言 随着国家对环境保护工作的不断重视和认识的提高,《中华人民共和国环境保护法》、《中华人民共和国固体废物污染环境防治法》、《中华人民共和国水污染防治法》等一系列环境保护法律法规补充、完善,特别是“绿水青山就是金山银山”这一科学论断的提出,更加推进和加大了我国环境保护的管理力度,尾矿库作为矿山三大控制工程之一,是矿山持续生产的主要设施,既是矿山严重的危险源、污染源,也是主要的环境保护设施,抓好尾矿库的环境保护管理工作对化解矿山的环境保护风险具有重要作用。 2 尾矿库的基本概念 尾矿库是指通过筑坝拦截谷口或围地构成的用以贮存金属非金属矿山进行矿石选别后排出尾矿的场所,其主要设施包括:尾矿坝、库内排洪设施、周边截排洪设施、坝面防护设施、辅助设施及其他专用设施。尾矿库类型按照前期选址的地形条件情况可分为傍山型、山谷型、平地型、截河型等四类,库内尾矿堆排方式有湿式排存、膏体排放、模袋法、干堆(固结干堆、压滤干堆),其尾矿筑坝方式有上游式筑坝、中线式筑坝及下游式筑坝。 结合我国现状金属非金属矿山的区域分布、地质条件、规模大小及矿山性质等情况来看,我国尾矿库的库型主要为傍山型、山谷型两类,平地型尾矿库常用于平原或沙漠戈壁地区,截河型尾矿库因为汇水面积大,排水系统配置复杂,管理难度较大,国内很少采用;在尾矿堆排方面仍主要采用传统的湿式存排方式,但随着对环境保护要求的提高及安全管理、二次资源利用等方面的考虑,膏体排放、模袋法、干堆(固结干堆、压滤干堆)等尾矿堆排新技术、新工艺将逐步得到运用和推广;尾矿库在筑坝过程中,鉴于上游式筑坝具有工艺简单、管理方便、运行维护费用低等优点,是我国普遍采用筑坝方法,占我国有色金属矿山尾矿库的80%左右,但其也存在一定的缺点,会造成坝体结构堆积复杂,提高坝体浸润线,造成坝体内部饱和、液化,坝体稳定性相对于中线式和下游式筑坝较差。 3 尾矿库存在危害及环境风险分析 尾矿库是用来贮存上游选矿厂排出尾矿、尾渣的场所,是减少、控制选矿厂固废、废水无组织排放的有效途径,对于选矿厂来说,尾矿库又是一个重要的环境保护设施,在选矿过程中,随着一些的化学药剂的的研发和使用,使得进入尾矿库内的尾矿存在氰、酚、酸、碱及重金属离子等有毒有害物质,一旦尾矿发生溃坝、泄露、渗漏等事故,将会对库区周边环境及地下水带来严重的环境问题,不仅给矿山企业带来沉重的经济负担,还会造成更加严重的社会影响。 其危害主要有以下几个方面: (一)、是容易引发重大环境问题的污染源 尾矿库一般占地面积较大,其突出的环保问题就是侵占土地、破坏植被、造成土地退化、沙漠化以及粉尘污染、水体污染等。 随着矿业不断发展,有限的矿石资源在不断减少,为了充分有效的利用矿产资源,细磨工艺成为提高选矿厂回收率发展的主流方向,与此同时也造成尾矿粒度较细,如果尾矿长期堆存,细粒尾矿风化现象就更严重,产生扬尘,扬尘在周边地区四处飞扬,特别在干旱、狂风季节中,细粒尾矿腾空而起,可形成长达数里的“黄龙”,造成周围土壤污染,并严重影响居民的身体健康。 另外,尾矿中含有毒有害的药剂,对矿山及其周边地区环境和生态都会造成污染和破坏。 (二)、尾矿堆存占用大量的土地资源 据统计我国现有尾矿库12718多座,含在建1526座,已闭库1024座。堆放尾矿总量达150亿吨,占地1300多万亩(2013年统计数据)。从数据情况来看,其占用土地资源是巨大的,日益加剧了我国人多地少的矛盾,而且尾矿等废弃物的排放和堆存也带来了一系列影响深远的环境问题,对土地资源的占用和污染制约了当地的社会经济发展并危害到人体的健康等。 (三)、引发重大工程与地质灾害的事故源 尾矿库是堆存流塑状物体的特殊构筑物,被国家安监部门列为重大危险源,一旦失事,其易造成重大人员伤亡和财产损失。 多年来,矿山固体废物堆存诱发次生地质灾害,诸如排土场滑坡、泥石流、尾矿库溃坝等多起重大工程与地质灾害,给社会带来了极大的损失。如1986年4月30日黄梅山铁矿尾矿库溃坝,冲倒尾矿库下游3km2的所有建筑,尾矿掩埋了大片土地。 从以上尾矿库的危害及造成的影响来看,做好尾矿库的安全环保管理工作是一项重要持久的工作,在管理过程中要着重化解尾矿库的环境保护风险,首先就得对存在的环境保护风险进行辨识,找到关键因数,从源头、本质上进行风险防控,在过程中做好风险管控,在末端做好措施治理。 (一)选址阶段的环境保护风险 (1)、尾矿库在建设前期选址不当,不符合国家相关产业政策。 尾矿库选址布局不合理, 与环境敏感目标距离过近等问题普遍存在。如尾矿库下游范围内存在集中式饮用水源地或自来水厂取水口、农田、自然保护区、水产基地及大型居民区等,这种不合理的布局方式给今后尾矿库的环境保护埋下管理风险。 (2)未对尾矿库库址进行地质条件勘察,或勘察不详细、不规范。 尾矿库建设时未按照规定进行地质条件勘察,也是一项严重的环境保护风险,特别是喀斯特地貌带,此种地貌溶岩较为发育,岩层较薄且存在裂隙,为地质灾害易发区,在喀斯特地貌带上进行尾矿库建设时必须进行严格的勘察分析,按照勘察分析资料做好防范措施,否则极易发生尾矿泄漏,造成尾矿污染地下水系。 (二)设计、施工阶段的环境保护风险 (1)设计时未采用或部分采用勘察结论 设计人员在对尾矿库进行初步设计时,未按照勘察单位的勘察结论或仅采纳部分勘察结论进行设计,在尾矿库建成后就存在先天性不

尾矿干堆技术探讨

尾矿干堆技术探讨

尾矿干堆技术探讨 1 引言 金属或非金属矿山开采出的矿石经选矿厂选出有价值的精矿后产生“砂”一样的废渣叫作尾矿。这些尾矿不仅数量大(每年以亿吨计),有些还含有暂时不能回收的有用成分,如随意排放,不仅会造成资源的流失,更主要的是会增大覆盖良田的面积,淤塞河道,造成严重的环境污染,因此必须对尾矿进行妥善处理。 2 尾矿干堆工艺的实践 妥善处理尾矿是摆在矿山生产工作者面前的一个重要问题。传统的尾矿处理方法是采取尾矿直排技术,建立尾矿库;而近几年新发展的方法是采用尾矿压滤干堆新技术。辽宁省排山楼金矿在全国黄金矿山串先采用了该项技术。我矿在有关厂家专门订做了4台1060特大型板框压滤机,选矿排出的尾矿浆,进入搅拌槽缓冲后用渣浆泵送到压滤车间,经压滤机充分挤压成为干片状的尾渣饼,浓度达到80%以上,含水量仅有20%左右,闸皮带传送机运往尾矿于堆场里分层堆放。为防止粉尘污染,对进入于堆场的尾矿用推土机推平并进行碾压;每逢干旱季节,还在场内喷雾洒水,使其经常保持湿润状态,井在分层干堆形成的坡段上压土盖沙,栽植耐子的沙棘树。这样,压滤处理后尾渣中含有的微量氰化物等有害物质,已被封闭在干堆场里,避免外渗和扩散,经过长期的露天曝晒和自然降解,已基本消除了对环境的危害,被环保管理部门称之为无排污门的矿山。 3 尾矿干堆工艺的优缺点 任何事物都具有相刘性、两面性,同传统直排工艺相比,结合矿山实践经验,总结了尾矿千堆技术的优缺点,详见表1。 4 尾矿干堆工艺与环境保护 随着对环境保护力度的不断加大,对尾矿的妥善处瑚工作显得尤为迫切和重要。对矿山企业来讲,尾矿处理得当与否直接影响环境建设。通过与传统直排工艺进行比较,尾矿于堆新工艺在环保方面的优势不言而喻,无沦是节

尾矿库的环保防渗设计

尾矿库的环保防渗设计 摘要:尾矿库是矿山企业贮存尾矿的重要设施,在环保、增效等方面具有重要的作用。为了避免尾矿污染环境,尾矿库必须严格按照环保标准要求来进行环保防渗,根据实际需要采用单层或双层防渗土工膜衬层来达到环境保护目的。科学合理的设计,规范精心的施工,外加严密的技术检测,能有效保证防渗土工膜衬层的水利防渗性能,提高尾矿库环保性能的可靠性。 关键词:尾矿库;防渗土工膜衬层;环保防渗设计 Abstract: the tailings is mine enterprise storage tailings of important facilities, in environmental protection, efficiency, and so has an important role. In order to avoid tailings pollution of the environment, shall be in strict accordance with the environmental protection standard of the tailings requirements for the environmental protection seepage control, according to actual needs, the single or double leakage-proof geomembrane lining layer to achieve environmental protection purposes. Scientific and reasonable design, regulating the elaborate construction, and strict technical inspection, which could guarantee the leakage-proof geomembrane lining layer of water seepage control performance, improve the reliability of the tailings environmental protection performance. Keywords: tailings; Leakage-proof geomembrane lining layer; Environmental protection seepage control design 矿山企业在生产运营的过程中,选矿厂选出精矿后会产生大量泥砂状的尾矿,这些尾矿中含有一定数量的有用成分和有害成分,如果随意排放既导致资源的流失和浪费,还会覆没农田、河道,导致严重的污染和灾害。目前,我国要求矿山企业应设立尾矿库来负责尾矿的贮存或进行无害化处理,因此尾矿库的合理建设与日常维护,成为各级安监部门和环保部门重点关注的环节。 一、尾矿库概述 尾矿库是用以堆存尾矿等工业废渣的重要场所,通常包括初期坝、尾矿堆坝、排洪、回水、尾矿输送和监测设施等系统。尾矿库将选矿厂产生的大量尾矿集中堆存、妥善处理,能够回收利用一部分资源,并有效保护周边环境。例如在水资源保护方面,矿山通常都是用水大户,处理1t原矿的用水量通常达到4t以上,有些甚至达到20t,处理原矿后的废水在尾矿库中澄清、净化后能够重复利用,理论上可以达到近90%的回水利用率,从而为保护水资源做出贡献。 由此可见,只要矿山生产有尾矿生成,就需要建立尾矿库对尾矿废弃物进行

尾矿库大坝施工组织设计(1)

4项目经理部及劳动力配置计划 4.1项目经理部组成情况 5主要施工机械、设备供应计划 1施工组织设计编制说明 64 1.1施工组织设计编制说明的原则 64 1.2管理目标 64 2工程概况 67 2.1工程简介 67 2.2施工工地水文气象 67 2.3施工工地对外交通 67 2.4施工用水用电 67 2.5临时用地 67 2.6施工工期 68 3主要施工办法 69 3.1 施工准备 69 3.2 确定各施工过程的施工顺序 69 3.3 分部、分项尤其是主要施工过程的施工方法 70 3.4 冬、雨季施工措施 81 5.1满足工程施工所需的机械数量及供应计划 89 5.2测量、实验、检测仪器设备数量及供应计划 90 86 86 4.2分部、分项工程所需工种类别和级别 87 4.3分阶段施工计划投入劳动力人数 88 89

6确保工程质量的技术组织措施91 6.1质量管理体系、制度及质量保证体系91 6.2关键部位质量控制94 6.3工种岗位技术培训99 6.4先进施工工艺99 6.5送样检测、见证取样保证措施99 6.6分部分项分阶段验收步骤及办法99 6.7完成质量目标奖惩办法100 7确保安全文明施工的技术组织措施101 7.1安全管理组织101 7.2专职安全管理人员101 7.3特殊作业人员(电工、电焊工、架子工、机械操作工等) (101) 7.4已具备的安全设施或准备配置的安全设施101 7.5安全防护措施(土方、桩基、用电、外架外网等)101 7.6大、中型施工机械管理104 7.7文明施工技术组织措施104 7.8安全、文明施工责任目标奖惩办法104 8确保工期的技术组织措施106 8.1编制各施工节点,月、旬作业计划,定期落实计划实施106 8.2交叉、流水施工作业106 8.3合理调配机械、材料、劳动力106 8.4 设计、建设、施工、监理紧密配合,及时解决有关问题,工期目标及 奖惩办法107

尾矿库施工组织设计

四川鑫源矿业呷村矿新增尾矿库工程施工组织设计 编制人: 审核人: 审批人: 北京首钢矿山建设工程有限责任公司

目录 第一章工程概况 (4) 1.1工程简介 (4) 1.2工程概况: (4) 1.3现场条件和周围环境 (5) 1.4承包范围 (5) 1.5编制依据 (5) 第二章施工部署 (6) 2.1项目经理部组织机构 (6) 2.2项目管理人员配备及职责 (6) 2.3分部、分项工程劳动力配备计划 (7) 2.4分阶段劳动力配备计划 (8) 2.5主要施工机械设备配置计划 (8) 2.6主要测量实验检测设备配置计划 (9) 第三章施工总平面布置 (11) 3.1临时设施 (11) 3.2临时用水、用电 (11) 3.3施工道路及现场排水 (11) 3.4施工总平面图 (11) 第四章施工进度计划 (12) 4.1施工项目划分及施工顺序 (12) 4.2施工进度计划 (12) 第五章主要工程施工方法 (13) 5.1 工程施工技术要求: (13) 5.2施工准备 (16) 5.3主要工程施工顺序安排 (17) 5.4主要分部分项工程施工方法 (17) 5.5雨季施工措施 (29)

第六章工程质量管理及技术措施 (31) 6.1质量管理体系 (31) 6.1.2各岗位职责 (31) 6.2关键部位质量控制措施 (33) 6.3培训管理制度 (35) 6.4施工新工艺 (36) 6.5材料取样、送检管理 (36) 6.6分部分项验收步骤及管理办法 (37) 6.7质量目标奖罚管理 (37) 第七章安全文明施工技术组织措施 (38) 7.1安全管理体系 (38) 7.2现场专职安全员及特殊作业人员配备 (38) 7.3拟投入现场的各种安全设备设施 (39) 7.4分部分项工程安全防护措施 (39) 7.5大、中型施工机械管理 (41) 7.6文明施工技术组织措施 (41) 第八章确保工期的技术组织措施 (44) 8.1进度计划的编制及控制措施 (44) 8.2合理安排交叉流水作业 (44) 8.3各种施工资源的调配 (44) 第九章、施工成本的措施 (46)

芦下铁矿尾矿库工程施工设计方案(施工段)

芦下铁矿為矿卑加固工程 (施工段) 编制单位:湖南涟邵建设工程(集团)芦下项目部 编制人:柳勤成 审核人:申琼林

2011年2月15日

目录 第一章施工组织设计 (3) 第一节主要编制依据 (3) 第二节本施工组织设计主要依据以下规范编制: (3) 第三节工程概况 (3) 第四节项目组织机构及人员配置 (4) 第五节施工方案 (5) 一施工测量 (5) 二多头搅拌桩防渗墙施工方案 (6) 三抛石固脚施工方案 (13) 四土工布铺置施工方案 (16) 五片石护坡施工 (19) 六坝肩排水沟施工 (20) 第六节工程进度保证措施 (21) 第七节工程质量保证措施 (26) 第八节施工平面布置 (33) 第九节赶工专项措施 (34) 第二章施工管理 (36) 第一节主要施工机具配置情况 (36) 第二节物质设备管理 (37) 第三节劳动力计划安排 (41) 第四节现场作业管理 (42) 第三章安全文明施工措施 (44) 第一节安全生产组织机构 (44) 第二节安全生产管理网络 (45) 第三节安全保证措施 (49) 第四节文明施工目标 (50) 第五节环境管理措施目标 (53)

第六节自然灾害应对专项措施 (60) 第七节突发事件应急处理措施 (60)

第一章施工组织 第一节主要编制依据 第二节本施工组织设计主要依据以下规范编制: 1、《选矿厂尾矿设施设计规范》 ( ZBJ1-90)。 2、《尾矿库安全技术规程》 (AQ2006-2005)。 3、《碾压式土石坝设计规范》 (SL274-2001)。 4、《水工混凝土结构设计规范》( SL/T191-2008)。 5、《砌石坝设计规范》(SL25-2006)。 6、《土工合成材料应用技术规范》 ( GB50290-98)。 7、《水利水电工程施工测量规范》(SL52~93) 。 8、《碾压式土石坝施工规范》(DL/T5129~2001) 。 9、《渠道防渗工程技术规范》 ( SL18-2004) 10、《水利水电工程混凝土防渗墙施工技术规范》 ( SL174-96) 11、《软土地基深层搅拌加固技术规程》 ( YBJ225-91) 12、2011年2月10日在芦下铁矿会议室举行的技术交底文件 第三节工程概况新余市谊达物资有限责任公司吉水县芦下铁矿尾矿库位于江西省吉水县芦溪岭林场境内.距离县城2.5KM.交通便利。该尾矿库于2008竣工验收。工程等别为五等主要构筑物为5 级. 主要构筑物为尾矿坝、 排洪系统等。现状坝体安全系数为1.08. 经实施本工程后. 安全系数将达到1.2. 1、尾矿库地貌及地质条件尾矿库地处武功山到玉华山断裂隆起南端与吉安凹陷东北部. 库区最低海拔69m. 坝区最高海拔115m本地区抗震设防烈度小于6度.属于一般 抗震地段。库内露出地层为震旦系下坊组.青灰色.紫红色凝灰质千枚岩及第四系残坡 积粉质粘土、含粘土圆砾。地质岩性较稳定。 2、原尾砂坝为碾压土石坝. 土石坝主体为筑填土。内坡坡比为1:1.45. 本工程的主要施工内容1、上游坡处理:将库内水位采用人工抽排到92.2m高程以下.然后从坝体左侧开始向右岸实施抛石固脚?当达到设计的1:2边坡后实施92.2m 高程以上的人工干砌块石压坡。 2、坝体防渗:整个坝体采用垂直防渗墙从正布置防渗隔离层.墙底深入强风化岩1.0m.桩直径0.7m.间距0.60m.成墙厚度不小于20cm 3、坝体下游区及塌陷区的加固:清除坝坡表面草皮护坡层.同时清除塌陷区的浮土.铺设10cm厚粗砂再一层土工布.土工布上面再铺一层粗砂以保护土工布.然后碾压块石压坡.最后采用人工干砌片石整坡。 4、堆坝观测桩的制作和埋设。